Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Centrifugally Applied Cement Mortar Lining

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Documents

This scope was carved out of 27-017.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

2028 Cedar Creek Pipe Replacement & Inventory Segments

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 29 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 6 documents on the prime contractFrom 2028 Cedar Creek Pipe Replacement & Inventory Segments
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → Infrastructure Engineering
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Applies cement mortar lining to the interior of steel pipes for prime contractors on the 2028 Cedar Creek Pipe Replacement project. Centrifugally or pneumatically applies mortar to a 3/4 inch thickness with accelerated or moist curing per AWWA C205. Uses spinning machines and cement/sand complying with ASTM C33, C150, and C595. Requires supplier certification for ASTM compliance. Delivers interior-lined steel pipe.

Similar Contracts

Same NAICS industry code

More opportunities from Texas → Infrastructure Engineering

Same awarding agency

New
SLED
2028 Cedar Creek Pipe Replacement & Inventory Segments
Solicitation # 27-017
Tarrant Regional Water District is soliciting proposals for the 2028 Cedar Creek Pipe Replacement and Inventory Segments project, which involves the fabrication and delivery of pipe to Ennis, Texas. All goods must be delivered and ready for installation no later than September 30, 2027. The project requires the submission of shop drawings within 30 days of the contract commencement. Technical requirements include strict adherence to coating standards, with adhesion testing conducted at the shop or field, and specific material certifications for cement and sand. Packaging must ensure that pre-coated items are battened to prevent abrasion and that paints are stored in temperature-controlled environments. The contract will be awarded based on best value, evaluated through a weighted system consisting of the proposed price (40 points), proposed delivery times (30 points), and the offeror's experience (30 points). To qualify, manufacturers must have successfully completed at least five similar contracts within the last five years. Proposals must be submitted electronically via the OpenGov portal by December 22, 2026. Required documentation includes a bid bond for 5% of the base proposal amount, performance and payment bonds, and various certifications including a non-collusion affidavit and a conflict of interest questionnaire. There is no specified set-aside status for this solicitation.

POSTED

about 15 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237110
New
SLED
Cedar Creek Section 2 Phase 2 Pipeline Replacement
Solicitation # 26-170
The Tarrant Regional Water District (TRWD) Cedar Creek Section 2 Phase 2 Pipeline Replacement Project involves replacing approximately 4.4 miles of existing 72-inch prestressed concrete cylinder pipe (PCCP) with new welded steel raw water transmission pipelines ranging from 72 to 102 inches in diameter. Located in southeast Tarrant County, Texas, the project extends from Mouser Way to the Kennedale Balancing Reservoir. The scope includes the installation of the new main using open-cut and trenchless methods, the installation of air release, blow-off, and butterfly valves, and the removal and disposal of approximately 23,500 linear feet of existing PCCP. Trenchless construction involves two new tunnel installations and the reuse of one existing casing for crossings at TxDOT and Union Pacific Railroad rights-of-way. The contract will be awarded based on best value rather than the lowest price, with evaluations focusing on contract price, completion times, performance data, and the qualifications of the management team. The Owner's budget for the project is 92 million dollars. Proposals must be submitted via the OpenGov electronic bidding system by December 10, 2026. Key requirements include compliance with Texas Government Code Chapter 2258 regarding prevailing wage rates and the provision of performance and payment bonds per Texas Government Code Chapter 2253. Progress payments are managed through a Project Construction Manager and are paid within 30 days of a recommended payment application. There is no set-aside status for this solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

5 days ago

DEADLINE

in 16 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS