Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

Ceramic Tile and Finish Work

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

238330 - Flooring Contractors

Place of Performance

Kadena Air Base, JP-47, JPN

Set-Aside

NONE

Documents

This scope was carved out of W912HV27Z1CPE.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Vehicle Maintenance Shop, Kadena Air Base

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SN Endist Japan
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs ceramic tiling for prime contractors on USACE Japan District projects at Kadena Air Base. Installs ceramic tiles for kitchen backsplashes and wet areas, including men's shower floors, using Luxe (Travertine TK5512-18, Fog Border DTL-2300P1) and Nagoya Mozaik (Wet Area 150x150) materials. Requires local construction licensure in Japan. Delivers completed tiled surfaces per the Room Finish Schedule.

Similar Contracts

Same NAICS industry code

NAICS: 238330
New
Federal
Z2DA--Repair & Replace Flooring in BLDG 10A
Solicitation # 36C24727Q0033
The Department of Veterans Affairs has issued solicitation 36C24727Q0033 for the repair and replacement of Luxury Vinyl Tile (LVT) flooring in Building 10A of the Carl Vinson VA Medical Center in Dublin, Georgia. This project is a total Small Business set-aside, specifically designated for HUBZONE small businesses, and aims to eliminate patient safety hazards caused by bubbling, swelling, and detaching flooring. The contractor must provide all labor, materials, and supervision to remove damaged planks and adhesives, prepare the subfloor, and install new Karndean Korlock Smoked Butternut flooring. A critical requirement of the installation is the inclusion of a moisture-control membrane to prevent future swelling, and all finishing gaps near door jambs and trim must be no larger than 1/8 inch and filled with matching silicone or caulk. The contract will be awarded to the lowest priced offer that is technically acceptable, with evaluations based on technical requirements, a satisfactory or neutral FAPIIS past performance rating, and price reasonableness. The period of performance requires the work to be completed within 45 days of the award date. Interested offerors must submit their proposals by October 6, 2026, at 3:00pm CDT. A non-mandatory site visit was scheduled for September 29, 2026. Payment will be processed electronically through the VA Financial Services Center via the Tungsten Network or X12 Electronic Data Interchange.
247-NETWORK Contract Office 7 (36C247)

POSTED

1 day ago

DEADLINE

in 22 days
View Details

More opportunities from Department Of Defense → W2SN Endist Japan

Same awarding agency

NAICS: 561612
New
Federal
Construction Site Security Monitoring for AFSOC Hotel, Yokota Air Base, Japan
Solicitation # W912HV-26-Z-0021
The U.S. Army Corps of Engineers, Japan District, is conducting market research to identify capable U.S. contractors for Construction Site Security Monitoring services for the AFSOC Hotel project at Yokota Air Base, Japan. This requirement involves providing comprehensive physical, personnel, technical, and procedural security to ensure the facility's accreditation in accordance with Intelligence Community Directive 705 and Department of Defense policies. The scope includes the installation and operation of temporary security infrastructure, such as Access Control Facilities and closed-circuit television systems, as well as the provision of specialized personnel including a Project Manager, a Site Security Program Manager, Construction Surveillance Technicians, and Cleared American Guards. The anticipated contract will be awarded on a firm-fixed price basis using the Lowest Price Technically Acceptable methodology, following FAR Part 12 Commercial Item procedures. Eligible contractors must possess an active Top Secret Facility Security Clearance from the Defense Counterintelligence and Security Agency and meet CMMC Level 2 Self certification requirements. Key personnel must be U.S. citizens with specific security clearances, ranging from Secret for guards to Top Secret for the Site Security Program Manager and technicians. The estimated period of performance is 540 calendar days, tentatively scheduled from November 1, 2027, through April 23, 2029.
Security Guards and Patrol Services

POSTED

3 days ago

DEADLINE

in 14 days
View Details
NAICS: 237120
New
Federal
DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan
Solicitation # W912HV26RA009
Solicitation W912HV26RA009, titled Bulk Fuel Storage Tanks Phase II, is a project for the USACE Japan Engineer District to construct a 100,000-barrel cut-and-cover JP-8 storage tank at Yokota Air Base, Japan. The scope includes the construction of a reinforced concrete pump house featuring four 600-gpm issue vertical turbine pumps and one 50-gpm water draw-off pump, a steel tank with a concrete outer wall and rolling cover, and a product saver tank. The project requires the installation of an automatic tank gauging (ATG) system and integration with existing filter separator building controls, including PLC and HMI systems. The estimated project magnitude is between 7.5 and 15 billion Yen, with a performance period of 1,020 calendar days following the Notice to Proceed. The contract is restricted to local sources in Japan and will be awarded using the Lowest Price Technically Acceptable (LPTA) process. To be eligible, offerors must demonstrate experience as a prime contractor on at least one fuel facility project valued at 1 billion JPY or 10 million USD completed within the last 20 years, and maintain a satisfactory past performance rating. Proposals must be submitted via PIEE in two separate PDF volumes by January 25, 2027. Key contractual terms include liquidated damages of 615,000 Yen per calendar day of delay and a priority rating of DO-C2. Required submittals following the Notice to Proceed include key personnel qualifications within five days and an accident prevention plan 15 days prior to start, adhering to EM 385-1-1 March 2024 safety standards.
Oil and Gas Pipeline and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 4 months
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS