Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on December 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

**Certified SB, including MB, SB-PW, or DVBE ** - Roof Repair and Coating Services in Riverside, and San Bernardino Counties

Closed
08A3940State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
SLED
FAC 27-10 Sinclair Roof Replacement, Building 3 Penthouses & Skylights
Solicitation # FAC 27-10
Project FAC 27-10 involves the roof restoration of Building 3 at Sinclair Community College's downtown Dayton campus, specifically covering four elevated penthouse roofs, the area around existing skylights, and the west connector roof to Building 4. The scope of work includes the installation of a fluid-applied roofing system with base flashing plies, modified membranes, and joint sealants to ensure watertight and airtight seals, as well as the provision of necessary carpentry such as wood nailers, curbs, and plywood. Work must be performed in stages to accommodate owner occupancy and comply with State of Ohio and local building codes. The estimated contract cost for General Trades is $310,000.00. Bids must be submitted electronically via bidexpress.com by 2:00 pm local time on Tuesday, December 1, 2026. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid and any accepted alternates. Key requirements include the use of domestic steel per ORC 153.011, adherence to prevailing wage rates, and the provision of performance and payment bonds. Bidders must submit a bid security form, bidder's qualifications, and an EDGE affidavit. Final acceptance is contingent upon a review by the A/E and the submission of a verified punch list. There is no set-aside status for this solicitation.
Sinclair Community College - Planning & Construction

POSTED

1 day ago

DEADLINE

in 9 days
NAICS: 238160
New
SLED
Gatesville ISD - Gatesville Intermediate Roof Repair RE-BID
Solicitation # 2026-1120
Gatesville Independent School District is soliciting proposals for a re-bid project to provide all labor, supervision, equipment, and materials for roof repairs at the Intermediate campus and a high school addendum. The scope of work includes clearing debris and gravel, installing 2.5-inch ISO board or equivalent insulation, and applying 60 mil GAF-TPO or equivalent roofing. The project covers approximately 89,600 square feet for the Intermediate campus and 896.5 square feet for the high school. Contractors are responsible for ensuring proper drainage, which may include raising HVAC curbs and gas lines at their own expense. All work must adhere to manufacturer specifications, including welding seams and installing proper pipe boots and penetration details. The solicitation, identified as RFP 2026-1120, requires bids to be submitted by December 7, 2026, with an award date of December 14, 2026. Bids must remain firm for 60 days from the award date. Award decisions will be based on the most advantageous outcome for the District rather than low price alone, considering factors such as vendor reputation, quality of services, project schedule, and warranty information. Proposers must submit a comprehensive set of mandatory forms, including certifications for criminal history, felony convictions, and anti-collusion, as well as a list of three references from the last three years. There is no specified set-aside status for this solicitation.
GATESVILLE ISD

POSTED

1 day ago

DEADLINE

in 15 days

General Info

Place of Performance

Yucca Valley, CA, USA

Set-Aside

small_business

Documents

3
PDF
PDF
PDF

Read all 3 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Montrose Service Garage and Warehouse Roof Replacement to remove existing roof system, and replace with new TPO membrane roof system and architectural roof edge facia metal.Open now
  • Building #346 HRSC/FAO RoofOpen now
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Jan 20, 2026 to Jan 12, 2026.

Deadline changed

Response deadline changed from Jan 12, 2026 to Jan 7, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
Contacts1 person available
OfficeN/A

Full Description

Show more
The documents and files attached to this solicitation do not have any updates for digital accessibility at this time. Updates will be applied as soon as they are available. For an accessible version of solicitation documents published on this page, please submit a request at http://bit.ly/dpac-ada or call Sign up to see this detail.

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 236220
New
SLED
Building Construction In Sonoma County In And Near Santa Rosa At 224 Lincoln Street And 3251 Brickway Boulevard
Solicitation # 04-2Q5804
The California Department of Transportation is soliciting bids for building construction projects in Sonoma County, specifically located at 224 Lincoln Street and 3251 Brickway Boulevard in Santa Rosa. The scope of work primarily involves the removal of existing electrical service and distribution systems at the Santa Rosa Maintenance Station and the installation of complete, operational electrical systems. Key deliverables include the provision of temporary construction power, heat, and lighting, as well as the execution of testing and commissioning. The contractor is required to maintain as-built drawings and provide detailed product data and shop drawings. The project mandates strict adherence to various standards, including NFPA 70, the 2008 ADA Standards for Accessibility, and 24 CA Code of Regs, Part 5 for sanitary sewage piping. Specific requirements include a warranty for intrusion detection system work, the use of a qualified testing agency, and the performance of infrared scans on enclosed switches and circuit breakers. Bids must be submitted on a unit price basis with bidder's security of at least 10 percent. While no DVBE contract goal is established, the agency encourages DVBE participation, and bidders must meet SBE participation goals to be considered responsive. This solicitation is not set aside for any specific business type.
Commercial and Institutional Building Construction

POSTED

5 days ago

DEADLINE

in 26 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS