CES Expansion UPS Upgrade

Active
038315Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 183d Wing at the Abraham Lincoln Capital Airport Air National Guard Base in Springfield, Illinois, is seeking a firm-fixed-price construction contractor to upgrade the existing 10 kW Uninterruptible Power Supply (UPS) system in Building 8 with a new scalable 20 kW system capable of expanding to 30 kW in the future. The scope includes complete removal of the current Liebert EXM UPS and associated equipment, site and electrical preparation, installation of a new modular UPS system compatible with the Vertiv Liebert Model APM2, sealing of all wall, floor, and ceiling penetrations to maintain fire ratings, and full operational testing by factory-trained personnel. The contract is structured as a Total Small Business Set-Aside under NAICS code 236220 with an estimated value between $25,000 and $250,000 and will be awarded using Simplified Acquisition Procedures under FAR Part 13. Performance must be completed within 120 days of the Notice to Proceed, and all work must comply with Unified Facilities Criteria, DoD TP-19, OSHA, and applicable local and military codes. Contractor personnel must complete Level 1 AT/FP training within 30 days of project start, adhere to strict physical and IT security protocols including PIV compliance, and maintain a 24-hour point of contact available at all times. Hazardous material handling is governed by specific forms for identification, close-out, and waste disposal, with all packaging required to meet manufacturer standards and C&D debris management rules. The acquisition is currently in presolicitation status, with the official solicitation scheduled for posting by the last week of July 2026 on SAM.gov, and a mandatory site visit expected in the first week of August. No quotes or proposals are to be submitted at this time; responses must wait for the formal solicitation which will include the complete Statement of Work, Davis-Bacon wage determinations, and detailed submission instructions.

General Info

Upgrade 10 kW to 20 kW UPS in Building 8, full replacement, 120-day timeline, small business set-aside.

Agency

Department Of Defense → W7M6 Uspfo Activity Il ArngView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Springfield, IL, USA

Set-Aside

SBA

Documents

(1)

SOW for UPS Expansion Upgrade at 183d Wing, Springfield IL

PDFsow

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhasePresolicitation
Posted

Presolicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7M6 Uspfo Activity Il Arng
Contacts1 person available
OfficeSPRINGFIELD, IL, 62702-2399, USA
Organization / Agency
Department Of Defense → W7M6 Uspfo Activity Il Arng
View Agency Profile
Office AddressSPRINGFIELD, IL, 62702-2399, USA

Full Description

Show more

Estimated Solicitation posting - Last week of July


Estimated Site Visit - First week of August (usually a Tuesday or Thursday, 1pm). 


A Draft Statement of Work (SOW) is attached to this notice for planning and market research purposes only. Do not submit formal quotes at this time.


1. PROJECT DESCRIPTION


The 183d Wing (183WG) at the Abraham Lincoln Capital Airport, Air National Guard Base, Springfield, IL, has a requirement for a firm-fixed-price construction contract to upgrade the Uninterrupted Power Supply (UPS) system in Building 8.


The contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, and non-personal services necessary to remove the existing 10 kW UPS system and install a new scalable 20 kW UPS system.


Key scope items include:


  • Demolition and removal of one (1) existing 10 kW Liebert EXM UPS in SWITCH Room 118, including associated equipment and maintenance bypass panelboard.
  • Site and electrical preparation for the new system.
  • Installation of one (1) new scalable 20 kW UPS System (configured for 20 kVA/kW, scalable up to 30 kVA/kW for future expansion).
  • Sealing of all wall/floor/ceiling penetrations to meet existing fire and assembly ratings.
  • Full system adjustments, load balancing, and operational testing by factory-trained field service personnel.

Period of Performance: 120 days or less after issuance of Notice to Proceed (NTP).


2. BRAND NAME OR EQUAL


This requirement will be solicited as "Brand Name or Equal" for a system similar to the Vertiv Liebert Model APM2 with modular and scalable architecture. The forthcoming solicitation will explicitly list the salient characteristics that any proposed "equal" equipment must meet to be considered acceptable.


3. MAGNITUDE OF CONSTRUCTION


In accordance with FAR 36.204, the estimated magnitude of this construction project is between $25,000 and $250,000. This acquisition will be conducted using Simplified Acquisition Procedures under FAR Part 13.


4. SITE VISIT / PRE-PROPOSAL CONFERENCE


A formal site visit will be held. The exact date, time, and registration instructions for the site visit will be provided in the official solicitation when it is posted. Contractors are highly encouraged to attend to observe site conditions, conduit routing paths, and space constraints.


5. DISCLAIMER


THIS IS A PRE-SOLICITATION NOTICE ONLY. This is not a Request for Quote (RFQ) or Request for Proposal (RFP). No solicitation document is currently available. All interested parties should monitor SAM.gov for the official solicitation, which will contain the full Statement of Work, applicable FAR/DFARS clauses, Davis-Bacon Wage Determinations, and instructions for quote submission. Do not submit quotes or proposals in response to this notice.

Similar Contracts

NAICS: 236220
New
Federal
Northeastern Regional Multiple Award Construction Contract (NRMACC)The Northeastern Regional Multiple Award Construction Contract, or NRMACC, is a small business set-aside contract designed to deliver general construction services across NASA’s northeastern facilities, specifically the Glenn Research Center, Goddard Space Flight Center, and Langley Research Center. The contract will support a broad range of construction activities including structural, civil, mechanical, electrical, environmental, and architectural work, with specific tasks outlined in individual task orders issued under the contract. All work is intended to serve the infrastructure needs of these federally operated research centers, with performance locations to be determined per task order. This procurement is managed by the Glenn Research Center under the National Aeronautics and Space Administration, with all contracting opportunities reserved exclusively for small businesses as defined by the Small Business Administration under FAR 19.5. The North American Industry Classification System code 236220 applies, categorizing it under commercial and institutional building construction. Point of contact for general inquiries is Christopher M. Colwell, while Robert E. Watts serves as the Small Business Specialist. The contract was forecasted for release on October 1, 2026, and details can be accessed through NASA’s official procurement forecast portal.
Glenn Research Center

POSTED

in 3 months

DEADLINE

N/A
View Details
NAICS: 236220
New
SLED
Checkpoint Security Grill Replacement - DBBThe contract is for the complete design, permitting, and construction of a new security grill at Checkpoint 5, replacing the existing system. The scope encompasses a full site assessment, development of design drawings and technical specifications compliant with TSA CRPG Section 3-5 standards, and submission for all necessary regulatory reviews and permits. The work includes the safe removal and proper disposal of the current grill, followed by fabrication and installation of the new system. Integration with existing structural, electrical, and security badge access systems is required to ensure seamless functionality and operational continuity. All phases must be executed with close coordination among stakeholders to maintain compliance and minimize disruptions to airport operations. The project is classified under NAICS code 236220 and is managed by the Aviation Project Management Group under the Port of Seattle. The opportunity was posted on July 12, 2026, and is currently listed as a forecast, indicating potential future solicitation. Primary point of contact is Yanet Maldonado, with Collette Deardorff serving as the project manager. All communication and inquiries should be directed through their provided contact details. The work will take place at the Port of Seattle’s facility, though specific location details are not provided beyond the checkpoint designation. The delivery method is designated as Design-Bid-Build, and no set-aside preferences are indicated for this procurement.
Aviation Project Management Group

POSTED

about 7 hours ago

DEADLINE

N/A
View Details