Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on October 17, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CGC KIMBALL #2 A-C REPAIRS

Closed
70Z08523QP00121Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336611
New
DIBBS
CYLINDER, HYDRAULIC ACC
Solicitation # SPE7M0-27-T-0456
Solicitation SPE7M0-27-T-0456 is a fixed-price request for quotations issued by the DLA Weapons Support Maritime Supply Chain ESOC Buys for one hydraulic accumulator cylinder, NSN 2090-01-450-1199. The item is to be delivered to the Puget Sound Naval Shipyard IMF in Bremerton, Washington, with a required delivery lead time of five days after order. Inspection and acceptance will occur at the destination per FAR 52.246-2. Quotations must be submitted via the DIBBS system by October 30, 2026. The contract mandates strict adherence to technical and quality standards, including Item Unique Identification (IUID) per MIL-STD-130 and DFARS 252.211-7003, and packaging requirements per RP001 and MIL-STD-2073-1E. Technical data for this item is subject to ITAR or EAR export controls, requiring contractors to have approved JCP certification and specific DLA authorizations. Additionally, the hardware must not contain intentionally added mercury, and the government will not evaluate offers utilizing additive manufacturing unless specifically authorized. Compliance with the Buy American Act and the Berry Amendment is required for quotes above the micro-purchase threshold. Evaluation includes a price preference for certified HUBZone Small Business Concerns. Administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for invoicing and payment, and adherence to DFARS 252.204-7012 for safeguarding covered defense information.
DLA WEAPONS SUPPORT MARITIME SUPPLY CHAIN ESOC BUYS

POSTED

1 day ago

DEADLINE

in 3 days
NAICS: 336611
New
Federal
NONSKID FOR NAVAL SHIPS/VESSELS
Solicitation # N4002727R0004
Solicitation N4002727R0004 is a total small business set-aside for a single Indefinite Delivery, Indefinite Quantity (IDIQ) firm fixed price contract to provide nonskid deck covering removal and replacement for U.S. Navy ships and other government vessels. The work will be performed at Naval Station Mayport, Florida, and within 50 miles of the facility. The contract spans five ordering periods from March 15, 2027, through March 14, 2032. The scope includes surface preparation meeting SSPC-SP10/NACE 2, SSPC-SP 11, and SSPC-SP12 WJ-3/NACE 5 standards, with the application of MIL-PRF-24667 Type I, IV, V, or XI nonskid materials. Award will be based on a competitive trade-off source selection process evaluating best value, with a heavy emphasis on past performance involving U.S. Navy surface combatants and price fairness. The contractor must adhere to ASQ/ANSI/ISO 9001:2015 quality standards and utilize the Wide Area WorkFlow (WAWF) system for electronic invoicing. Key requirements include the submission of an Access Control Plan for non-U.S. citizen employees and compliance with CMMC cybersecurity levels and Buy American regulations. Liquidated damages are tailored at two percent per calendar day, capped at ten percent. Proposals are due by November 30, 2026, and must be submitted in three volumes covering price, past performance, and pre-award information.
Southeast Regional Maintenance Center

POSTED

2 days ago

DEADLINE

in 29 days
NAICS: 336611
New
Federal
CGC KUKUI DRYDOCK
Solicitation # 70ZU0227QIBCT0001
Solicitation 70ZU0227QIBCT0001 is an Indefinite Delivery Requirement Contract (IDR) for the FY27 drydock availability of the USCGC KUKUI (WLB 203), a 225-foot Buoy Tender homeported in Sitka, Alaska. The project involves comprehensive drydock repairs, including extensive preservation of the hull, exterior decks, superstructure, ballast and potable water tanks, and various internal mechanical components. Performance will take place at the contractor's facility from February 2, 2027, to May 18, 2027, with an anticipated award date of January 18, 2027. This requirement is a total small business set-aside under NAICS code 336611, with a size standard of 1,300 employees. The award will be granted to the responsible quoter providing the most advantageous quote, based on a lowest-price technically acceptable basis. Evaluation factors include a pass/fail assessment of technical capability and past performance within the last three years. Contractors must provide a comprehensive execution plan for lodging and messing, facility certifications, and docking calculations in accordance with SFLC Standard Specifications 0740 and 8634. Quotes must be submitted via email by November 23, 2026, and must include a detailed technical proposal separate from the pricing sheet. Order limitations are set with a minimum order of 1,000 dollars and a maximum combination order of 7 million dollars.
CG-SEA-C22

POSTED

2 days ago

DEADLINE

in 22 days
NAICS: 336611
New
Federal
NAVY NP FENDER RENEWAL
Solicitation # 70Z04027Q60514Y00
The U.S. Coast Guard Surface Forces Logistics Center is soliciting quotes for a Firm Fixed Price Purchase Order to perform a rubber fender system renewal on a 108-foot Yard Patrol Craft. The scope of work includes the removal of existing upper and lower fendering, securing bars, and hardware from the exterior hull and transom, followed by the installation of new rubber fenders and associated hardware. Specific requirements include replacing up to 60 linear feet of CRES securing flat bars and 75 linear feet of mounting plates and oak shims, as well as installing new studs, nuts, and washers. The government will provide 24 Type-D black EPDM fenders as government furnished material located at the Coast Guard Yard in Curtis Bay, Maryland, which also serves as the place of performance. This is a total small business set-aside conducted under FAR Part 13 Simplified Acquisition Procedures, with awards based on best value considering technical requirements, deadlines, and price. All work must be completed by December 11, 2026. Quotes must be submitted via email to Erica Gibbs by November 16, 2026, at 9:00 am Eastern. Payment will be processed via Net 30 terms through the IPP system, and no down or advanced payments will be provided. Vendors must be able to secure funding until delivery and may need to be registered in the Joint Certification Program to access export-controlled drawings.
CG-SEA-C23

POSTED

2 days ago

DEADLINE

in 15 days
NAICS: 336611
New
Federal
Voyage Repair (VR)
Solicitation # N6817127QN006
Solicitation N6817127QN006 is a Request for Quote issued by NAVSUP FLC Sigonella Naples Office for firm fixed price non-commercial voyage repair services for the USS RAFAEL PERALTA (DDG 115). The work is to be performed in Mombasa, Kenya, with a period of performance from November 12, 2026, to November 18, 2026. The scope of work includes hull maintenance such as high-pressure fresh water washing, cleaning and inspection of air conditioning and refrigeration plant condensers, rust and corrosion removal, replacement of lagging and insulation, furniture upholstery replacement, and the provision of rigging services and scaffolding. All work must adhere to NAVSEA Standard Items and SCF Part 1915 Occupational Safety and Health Standards for Shipyard Employment. Award will be granted to the lowest priced technically acceptable offeror, with technical capabilities rated as either acceptable or unacceptable. Prospective contractors must submit a completed J-1 Price Breakdown in US dollars, a draft Test and Inspection Plan, and a signed Use and Non-Disclosure Agreement to access restricted technical data. Required submission documentation includes Standard Form 18, completed Standard Form 30 amendments, and technical qualifications verified via the Attachment J-3 checklist. The deadline for proposal submission is November 2, 2026, at 13:00 CET. Post-award invoicing must be processed electronically through Wide Area WorkFlow.
Navsup Flc Sigonella Naples Office

POSTED

2 days ago

DEADLINE

in 1 day
NAICS: 336611
New
Federal
Full & Open Brand Name OEM "Curtiss-Wright Electro-Mechanical Corp" - Low Pressure Air Compressor (LPAC) Maintenance Services
Solicitation # N0040627Q0004
Fleet Logistics Center Puget Sound is soliciting a firm-fixed-price, full and open brand name requirement for Low Pressure Air Compressor (LPAC) maintenance services in support of SRF-JRMC Sasebo, Japan. The scope of work involves providing all labor and genuine OEM parts from Curtiss-Wright Electro-Mechanical Corp to replace the Air End Assembly (Part Number ML12535266G1) for a Dresser-Rand Company Model GSS-200 rotary compressor on the USS SAN DIEGO (LPD-22). Key tasks include disassembly, cleaning, inspection, drive coupling alignment, and an operational test, with all work adhering to Job Specification 38DXA55115-A01 and MIL-STD-162B cleaning standards. Performance is expected to be completed by November 23, 2026. The government will select the most advantageous offer based on technical capability, including the delivery date, past performance, and price, with a 10 percent price evaluation preference for HUBZone small business concerns. Because this is a brand name requirement, offerors must provide OEM documentation establishing the authenticity of parts and services, including traceability and warranties, to be deemed compliant. Invoicing must be processed through Wide Area WorkFlow (WAWF), and all packaging and marking must comply with ASTM-D-3951 and MIL-STD-130. The procurement is categorized under NAICS code 336611 and includes standard FAR and DFARS clauses regarding safety, security, and commercial services.
Navsup Flt Logistics Ctr Puget Sound

POSTED

2 days ago

DEADLINE

in 2 days

General Info

NAICS

336611 - Ship Building and Repairing

Place of Performance

Honolulu, HI, 96819, USA

Set-Aside

SBA

Documents

13
PDF, High priority: read this first348 pages · modification
High
PDF, Low priority24 pages · technical-publication
Low
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PNG

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Sflc Procurement Branch 2(00085)
Contacts1 person available
OfficeALAMEDA, CA, 94501, USA
Office AddressALAMEDA, CA, 94501, USA
Contacts

Full Description

Show more
ITEM 1: Air Conditioning Condenser, Repair 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to renew 110 damaged tubes on the #2A Air Conditioning condenser, develop a flushing plan for the refrigerant side of the #2A circuit and provide various components of the refrigerant side of the #2A circuit. The Contractor will also provide a technical representative to oversee Coast Guard personnel as they execute the flushing plan, renew or overhaul various components of the refrigerant side of the #2A and restore the plant back to service. Location of work is Air Conditioning Equipment Room, Compartment 3-22-0-Q. The USCG estimates that the #2A circuits was exposed to seawater for about two months. 1.2 Government-furnished property. MTI ITEM DESCRIPTION NSN/PN QTY Y 90/10 Cu/Ni -3/4 x 96 enhanced tubes PN: 0034948 110 ea. Y York Semi-hermetic screw compressor PN: YCWS 1 ea *Government-loaned property, which must be returned to the vessel upon completion of the availability. 2. REFERENCES Coast Guard Drawings Coast Guard Drawing 750 WMSL 508-001, Rev C, Piping and Machinery Insulation Schedule and L/M Coast Guard Drawing 750 WMSL 516-001, Rev E, A/C & Refrigeration Piping Diagram Coast Guard Drawing 750-WMSL_520_001, Rev H, Seawater Cooling System Diagram (ASC520001) Coast Guard Drawing 750-WMSL-520-004, Rev E, Salt Water Cooling Unit 1320 (ASC520132-SW) Coast Guard Drawing 750-WMSL_520_506, Rev E, Auxiliary Seawater Piping Mods FWD of FR 52. Coast Guard Publications Coast Guard Technical Publication (TP) 7608, SWBS 514, February 2012, York/Thermaflo Oz Saver Portable Refrigerant Recovery Unit, Model 4000 (418 WMSL) Coast Guard Technical Publication (TP) S9514-F1-MMA-010, SWBS 514, Jan 2012, Air Cond Plant HFC-134A 130 Ton Capacity Description, Operation and Maintenance Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2020, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures Other References American Society of Mechanical Engineers (ASME) B16.34, 2017, Valves-Flanged, Threaded, and Welding End ASTM International (ASTM) F992, 2017, Standard Specification for Valve Label Plates ASME/BPVC Section V, Jul 2021, Section V Nondestructive Examination Ketema LP, Sep 2002, DXT Direct Expansion Evaporator Installation, Operation, and Maintenance Instructions. 3. REQUIREMENTS 3.1 General. 3.1.1 CIR. None. 3.1.2 Air Conditioning Tech Rep. The Contractor must provide the services of a certified Tech Rep, who is familiar with the York HFC-134A 130 Ton Air Conditioning Plant to accomplish the following tasks - on site: Provide manufacturer's proprietary information, software, and tools pertinent to the equipment/system. Assist with proper repair methods, and ensure compliance with manufacturer's procedures and standards during disassembly, inspection, repair, modification, calibration, and reassembly of the equipment/system. The Tech Rep must be present to advise, oversee and supervise USCG personnel when called for in this work item[ABJC1] . 3.1.2.1 Submit the Tech Rep's name and r'sum to the COR at the Arrival Conference. I removed the protective measures requirements. USCG personnel will be doing that I also removed interference requirements. USCG personnel will do this as well 3.1.4 Refrigerant handling. 3.1.4.1 Personnel qualification. The Contractor must provide the COR documentation that ensure all prime and sub contractors servicing refrigerant-based Air Conditioning and Refrigeration (AC&R) equipment hold a current Environmental Protection Agency (EPA) Technician Certification, Type IV (Universal Certification), and meet all State and local regulations and licensing requirements. 3.1.4.2 Refrigerant draining and recovery. The Contractor must ensure all vessels Air Conditioning Plant refrigerant is drained, recovered and disposed of in accordance with all Federal, state and local environmental regulations. 3.1.5 Repair plan. The Contractor must supply a written plan of work to the COR at least 24 hours in advance of beginning work. Plan must include sequencing of work, flushing procedures, source of supply for the renewal and overhaul parts and any planned deviations from this work item. 3.1.6 Guidance. The Contractor must refer to CG Drawing 750 WMSL 516-001 for requirements, location and shipboard arrangement. The Contractor must refer to CG TP S9514-F1-MMA-010, for general & safety information, parts, operation and maintenance procedures. 3.1.7 Safety. The Contractor must familiarize themselves with and comply with applicable Warning, Caution and Attention notes invoked in CG TP S9514-F1-MMA-010, SWBS 514, Jan 2012, Air Conditioning Plant HFC-134A 130 Ton Capacity Description, Operation and Maintenance Manual. USCG will be responsible for handling all rigging 3.1.8 Vital Loop. Contractor must keep one AC compressor of the three AC plants operating at all times. This will require installing blank flanges in the condenser supply and discharge piping for AC Plant #2. The Contractor may bring down the AC plant for no more than an hour at a time to install the necessary blanks. 3.2 Operational test - initial[ABJC2] . Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR. 3.2.1 The Contractor must submit an operational report following startup utilizing figure 2-16 of TP S9514-F1-MMA-010. 3.2.2 Initial operational test of the Air Conditioners can be waived if operating the AC plant will risk personnel safety and/or further damage to the system. Submit a CFR for this request for COR review. 3.3 Refrigerant evacuation. The Tech Rep must oversee USCG personnel as they evacuate the refrigerant. 3.4 Condenser tube renewal. The Contractor must renew [ABJC3] 140 tubes across the #1A and #1B condensers based upon results from the Eddy Current Testing. Model information for the condensers is show in in Table 1. Follow the procedures for removal of the tubes, prepping of the tube sheets, and installation of new tubes, outlined in the CG Tech Pub S9514-F1-MMA-010, Section 6-7. The Contractor must also follow all necessary steps outlined in the same Tech Pub to keep contaminants such as metal shavings out of the system during the tube renewal process. 3.4.1 In the presence of the Coast Guard inspector, The Contractor must pressure test the tube side of the condenser at 150% of its design working pressure to ensure effectiveness of the repairs performed. Submit a CFR to the COR. USCG can clean and reinstall the end bells Table 1 Fuctional Service Manufacturer Model number notes Air Conditioning Unit Condenser KETEMA MHX-1208A-2P Each condenser contains 106 tubes 3.5 Borescope Inspection. The Contractor[ABJC4] must provide a borescope inspection for the #1A and #1B refrigeration circuits that includes the following components: Condenser barrel Oil Separator Compressor Piping leading to and from these components Refrigerant side of evaporator 3.6 A/C plants flush. The Tech rep must plan and supervise USCG personnel as they flush refrigerant circuit for the #2A AC plant. This plan must be approved by the COR prior to execution. Components that are being renewed or overhauled do not need to be flushed. The flush plan must address the following tasks: Removal of particulate contamination Removal of rust Removal saltwater residue and growth Recommend techniques and materials that are compatible with the AC system. Incorporate 10-micron filtration Instructions for mechanical removal of contamination. 3.7 Component Renewal. The Contractor must provide all necessary materials and the Tech Rep must supervise USCG personnel as they renew the following components of refrigeration circuit #2A in accordance with TPS9514-F1-MMA-010. Any brazing on the A/C unit requires the AC Tech Rep on site to oversee the nitrogen purge during brazing. Comply with all requirements of SFLC Standard Spec 0740 Table 2 Component Dwg 077-18317-001 Item Number Quantity York Part Number Manufacturer/Model Compressor, Screw Semi-Hermetic 2 1 364-49094-215 York DXS45LA-A46/50 Separator, Oil, Right Hand 3 1 075-56077-001 Westermeyer OS6-I5R Separator, Oil, Left Hand 4 1 075-56077-002 Westermeyer OS6-I5L Control, High Refrigerant Pressure 9 1 025-35948-000 Alco PS3-XF5HNB297 Transducer, Suction Pressure 15 1 025-29583-000 Danfoss 060G2154 Transducer, Discharge Pressure 16 1 025-29139-001 Danfoss 060G2153 Transducer, Oil Pressure 17 1 025-29139-001 Danfoss 060G2153 Valve, Solenoid, Liquid Refrigerant Injection 26 1 025-00245-000 Danfoss 032F4023 Valve, Solenoid, Capacity Control 27 1 025-33205-000 NA Core, Dehydrator 30 3 026-37540-000 Emerson HX-48 Indicator, Moisture, Cartridge 42 2 026-32800-000 Sporlan AC-20 USCG will clean the dehydrator core 3.8 Component Overhaul. The Contractor must provide all necessary materials and the Tech Rep must supervise USCG personnel as they overhaul the following components in refrigeration circuits #2A in accordance with TPS9514-F1-MMA-010: 3.8.1 Evaporator Thermal Expansion Valve (PC 23, Dwg 077-18317-001) - renew the cage assembly (PN: X9144B13B), the power head assembly (PN: XC-726MC2B) and the superheat plug (PC: X28124-1), the gasket (PN: X13455-1). The Contractor must also supply the packing nut wrench (PN: E642). 3.8.2 Economizer Thermal Expansion Valve (PC 24, DWG 077-18317-001) - renew the cage assembly (PN: X11873B5B), the power head assembly (PN: XB-1019MC1B), the superheat plug (PN: X28124-1), the gasket (PN: X13455-1) and the packing nut wrench (PN: E642). 3.8.3 Main Liquid Line Solenoid Valve (PC 25, DWG 077-18317-001) - renew internal components using the Solenoid Valve Repair Kit (PN: KS30325) 3.8.4 Air Compressor Discharge Valve (PC 80, Figure 7-3, TPS9514-F1-MMA-010) - Disassemble valve and mechanically remove all internal rust. 3.9 Post-work Leak Test. The Tech Rep must oversee as the USCG conducts a leak test of the AC system in accordance with Paragraph 6-2.1 of TP S9514-F1-MMA-010 upon completion of all work. 3.10 A/C plants. The Tech Rep must oversee as the USCG restores all of the affected systems to original configuration, renew the refrigerant, oil, oil filter cartridge, and all liquid line filter/drier core. 3.10.1 Charging Refrigerant. Upon completion of a successful leak test, the Contractor must oversee as the USCG charges the refrigerant to the unit in accordance with Paragraph 6-2.3 of TP S9514-F1-MMA-010. 3.11 Operational test - post repairs. After completion of work, in the presence of the Coast Guard Inspector, the Contractor must thoroughly test and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR to the COR. 3.11.1 The Contractor must submit an operational report following startup utilizing figure 2-16 of TP S9514-F1-MMA-010. 3.11.2 The Tech Rep must oversee as the USCG installs additional drier cores as needed after the initial start to ensure the system is dry and free of acids and moisture. USCG will do touch up preservation and piping insulation renewal [ABJC1]This is adjusted slightly. We don't need the tech rep there all the time, but we need them whenever the spec says that they need to advise something [ABJC2]We want to keep this. Coast Guard provides most of the labor for this anyway. [ABJC3]The contractor themselves will do the actual renewal of the tubes themselves. I don't think that the coast guard has the equipment to do this. It is only 140 because we are assuming that not all of the tubes will need to be renewed. [ABJC4]We also need the Contractors's borescope

More opportunities from Department Of Homeland Security → Sflc Procurement Branch 2(00085)

Same awarding agency

NAICS: 811210
Federal
TRS-3D /AN/SPS-75 Radar repairs/ overhaul services
Solicitation # 70Z08526RRJ001B00
The United States Coast Guard Surface Forces Logistics Center is soliciting repair and overhaul services for the AN/SPS-75 Air Search Radar System, specifically for the 418-foot Legend-class National Security Cutter fleet. This is a sole-source acquisition awarded to Northern Defense Industries, LLC, as they are the only authorized U.S. service provider for these proprietary OEM parts and technical data. The scope of work includes the disassembly, inspection, testing, repair, preservation, packaging, and marking of various critical components, such as power supplies, circuit card assemblies, and radar set subassemblies. All repairs must adhere to Original Equipment Manufacturer specifications to maintain operational readiness and system warranties. The contract is structured as a requirements contract with fixed-price delivery orders, consisting of a base period and three one-year ordering periods, with an additional six-month extension option. Performance is primarily conducted at the contractor's facilities, with a strict requirement for items to be preserved for at least two years of warehouse storage and packaged according to military standards. Award is based on technical capability and fair and reasonable pricing, with evaluations focusing on resources, quality assurance, and past performance. Administrative requirements include electronic invoicing via the Invoice Processing Platform and the provision of a dedicated Project Manager to serve as the primary point of contact.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 months ago

DEADLINE

in about 1 month
View Details
NAICS: 333995
Federal
APPLETON CYLINDER
Solicitation # 70Z08526Q40200B00
Solicitation 70Z08526Q40200B00 is a combined synopsis and request for quote issued by the U.S. Coast Guard Surface Forces Logistics Center for the procurement of specific brand name components from Appleton Marine Inc. This is a Brand Name Only solicitation with no substitutions authorized; therefore, interested vendors must be authorized distributors and provide an authorized distributor letter from the Original Equipment Manufacturer with their quotation. The requirement is a total small business set-aside under NAICS code 333995 and will result in a firm-fixed-price purchase order. The procurement consists of three line items: three Jib Cylinders (NSN 3040 01-F12-2745), four Luff Cylinders (NSN 3040 01-F12-2743), and ten Sheaves (NSN 3020 01-F12-2750). Strict packaging and marking standards apply, including MIL-STD-2073-1E Method 10 for cylinders and ASTM D5118 fiberboard boxes for sheaves, with all items requiring marking per MIL-STD-129R and barcoding per ISO/IEC-16388-2007. Delivery is required by September 30, 2026, to the USCG Surface Forces Logistics Center in Baltimore, Maryland, with shipping terms set as FOB Destination. Offers will be evaluated based on price and the ability to meet the brand name and authorized distributor requirements. Successful contractors must submit invoices through the Invoice Processing Platform with payment terms of Net 30. All submissions must include the vendor's Unique Entity Identifier and CAGE code, and offerors must maintain current representations and certifications in the System for Award Management.
Fluid Power Cylinder and Actuator Manufacturing

POSTED

3 months ago

DEADLINE

in 9 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS