This Solicitation opportunity from Department Of State was posted on May 8, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CGR Toronto Kitchen Renovation

Closed
19CA7023Q0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236118
New
SLED
FEMA Elevation Project - 2705 Church Street {4491-22} - REBID #3
Solicitation # 2027-IFB-031
Wicomico County is soliciting bids under solicitation 2027-IFB-031 for a FEMA/MEMA funded structural elevation project located at 2705 Church Street in Quantico, Maryland. The project requires a qualified vendor to elevate a residential structure and its kitchen to at least two feet above the base flood elevation. The scope of work includes the demolition of the existing foundation, construction of a new foundation using concrete piers, columns, and steel beams, and the subsequent lowering of the building onto the new structure. Additional requirements include obtaining necessary plumbing, electrical, and mechanical permits, disconnecting and reconnecting utilities, installing three new exterior stair systems, and ensuring all exterior siding and paint match original conditions per Historic District guidelines. Bids must be submitted electronically via the OpenGov e-Procurement Portal by November 3, 2026, at 2:30 p.m. The contract will be awarded to the lowest responsive and responsible vendor. The project must be completed by May 31, 2027, with a performance duration of 90 days following contract execution, weather permitting. Vendors are required to provide a Certificate of Good Standing from the Maryland Department of Assessments and Taxation and must adhere to strict insurance and bonding requirements, including performance and payment bonds if the contract exceeds 100,000 dollars. Payment for approved work will be issued within 30 days of receiving a proper invoice.
Planning and Zoning

POSTED

about 2 hours ago

DEADLINE

in 7 days
NAICS: 236118
New
SLED
RFP 26-24-CW_Re-Advertisement for the Elevation of Flood Prone Homes
Solicitation # RFP-26-24-CW
The City of Port Orange is soliciting proposals under RFP-26-24-CW for turnkey services to elevate up to 11 single-family residential structures to mitigate flood risk. Funded by the FEMA Hazard Mitigation Grant Program, the project requires elevating homes on new open foundations using concrete piers or pilings to achieve a 9-foot clearance above existing ground, ensuring protection against 100-year storm events. The scope of work includes permitting, utility disconnection and reconnection with underground electrical services, and the installation of medically necessary lift platforms for two of the residences. All work must strictly comply with the Florida Building Code, ASCE 24-14, and local floodplain ordinances. Proposals are due by November 13, 2026, with a final performance deadline of March 1, 2028. The City will rank respondents using a 10-point weighted scoring system based on responsiveness, technical capability, past performance, and professional licensure. Awardees must provide performance and payment bonds for 100 percent of the contract price and adhere to extensive federal and state compliance requirements, including E-Verify, anti-collusion, and non-discrimination standards. While the project involves construction, the Davis-Bacon Act does not apply; however, contractors must comply with the Copeland Anti-Kickback Act and the Contract Work Hours and Safety Standards Act for contracts exceeding $100,000.
Community Development

POSTED

about 3 hours ago

DEADLINE

in 17 days
NAICS: 236118
New
Federal
RTOIL Office rehab
Solicitation # N6893627Q0001
The Naval Air Warfare Center Weapons Division is soliciting quotes for the PM36 RTOIL Office Rehabilitation project located at Naval Base Ventura County, Point Mugu, California. This is a 100% small business set-aside under NAICS code 236118, utilizing a firm-fixed-price contract with an estimated magnitude between $250,000 and $500,000. The scope of work involves rehabilitating an office facility, including wall repair, painting, carpeting with specific Mohawk-Elite-Azure-Edge-Blue-Commercial flooring, lighting installation, and the installation of 16 new white boards. Performance must begin within 14 calendar days of award and be completed within 120 calendar days, with a scheduled delivery period from October 29, 2026, to February 26, 2027. Award will be granted to the responsible offeror determined to be most advantageous based on price, delivery schedule, technical compliance, and Supplier Performance Risk System assessments. Offerors must provide sufficient technical information to demonstrate project understanding to be considered. The contract requires adherence to the Davis-Bacon Act for prevailing wages, the presence of an on-site Site Safety and Health Officer, and the submission of a comprehensive Quality Control Plan. Invoicing will be processed electronically through Wide Area Workflow with net 30 payment terms. All quotes must be submitted by October 22, 2026, at 3:00 PM PST, and offerors must maintain active registration in the System for Award Management.
Naval Air Warfare Center

POSTED

about 6 hours ago

DEADLINE

in 3 days
NAICS: 236118
New
SLED
Housing Rehabilitation Program- 1137 Bel Air Ct, Modesto, CA 95350
Solicitation # HUD-INF-IFB-00132
Solicitation HUD-INF-IFB-00132 is an invitation for bids for residential repairs and rehabilitation at 1137 Bel Air Ct, Modesto, CA 95350. Funded by the U.S. Department of Housing and Urban Development (HUD), the project is administered by the City of Modesto's Community and Economic Development Department. The selected contractor must provide all labor, materials, and supervision to complete the work in accordance with California Building Code standards and the Community Development Division's Housing Rehabilitation Program. Key requirements include holding a valid California Class B General Building Contractor license and maintaining approved insurance coverage for general liability, workers' compensation, and automobile liability through the City's Public Improvement Notification System (PINS). Bids must be submitted electronically via the OpenGov Procurement Portal by November 2, 2026, at 4:00 pm. Proposals must include a Work Write-Up with itemized costs, and the City reserves the right to reject bids that exceed the Housing Rehabilitation Specialist's cost estimate by more than 15%. While the project is not subject to prevailing wage requirements, the City strongly encourages participation from Section 3 businesses. The awarded contractor is required to provide a COVID-19 Health and Safety Plan and an operation and maintenance manual upon completion. Performance is subject to liquidated damages of 65 dollars per day for delays, and final payment is contingent upon a signed Certificate of Completion and necessary termite and lead-based paint clearances.
Community and Economic Development

POSTED

about 24 hours ago

DEADLINE

in 6 days
NAICS: 236118
New
SLED
Housing Rehabilitation Program-1017 Crippen Ave, Modesto, CA 95351
Solicitation # HUD-INF-IFB-00130
The City of Modesto Community and Economic Development Department is soliciting bids for a housing rehabilitation project located at 1017 Crippen Ave, Modesto, CA 95351. Funded through the U.S. Department of Housing and Urban Development, the project emphasizes economic opportunities for low-income individuals via Section 3 requirements. The scope of work involves providing all supervision, labor, materials, and equipment necessary to perform repairs as detailed in the Work Write-Up. Bidders must hold a valid California General Contractor Class B license and maintain compliant insurance coverage, including General Liability, Workers Compensation, and Automobile Liability, approved through the City's Public Improvement Notification System. Bids must be submitted electronically via the OpenGov Procurement Portal by November 2, 2026, at 4:00 pm. To be validated, bids must include a completed Work Write-Up/Submittal sheet with itemized costs and fall within 15 percent of the Housing Rehabilitation Specialist's cost estimate. The project is not subject to prevailing wage requirements, but contractors must comply with strict safety standards, including OSHA Asbestos Standards, lead-based paint compliance under 24 CFR Part 35 Subpart J, and the submission of a COVID-19 Health and Safety Plan. The approximate contract award date is January 2027. Performance is subject to a liquidated damages penalty of 65 dollars per calendar day for delays. Final payment is contingent upon inspection and approval by the homeowner and the City of Modesto, and requires the delivery of an Operation and Maintenance manual for all new installations. Invoices must be signed by the contractor, homeowner, and relevant City specialists, with reimbursement typically processed within 30 days.
Community and Economic Development

POSTED

about 24 hours ago

DEADLINE

in 6 days
NAICS: 236118
New
SLED
Housing Rehabilitation Program- 103 Chabot Ct, Modesto, CA 95354
Solicitation # HUD-INF-IFB-00131
The City of Modesto Community and Economic Development Department is soliciting bids for a housing rehabilitation project located at 103 Chabot Ct, Modesto, CA 95354, under solicitation number HUD-INF-IFB-00131. Funded by the U.S. Department of Housing and Urban Development, the project emphasizes Section 3 requirements to expand economic opportunities for low-income individuals. Bidders must hold a valid California Class B General Building Contractor license and maintain compliant insurance coverage, including General Liability, Workers Compensation, and Automobile Liability, approved through the City's Public Improvement Notification System. All bids must be submitted electronically via the OpenGov Procurement Portal by November 3, 2026. The scope of work requires adherence to the California Building Code, California Green Building Standards Code, and specific lead-safe work practices for homes built before 1978. Awarded contractors must provide a COVID-19 Health and Safety Plan and are subject to a one-year warranty period to remedy any defects. Bids must be within 15 percent of the Housing Rehabilitation Specialist's cost estimate to be considered reasonable. While the project is not subject to prevailing wage requirements, it does include liquidated damages of 65 dollars per day for delays. Payment is processed upon the submission of detailed invoices signed by the contractor, homeowner, and city specialists, with final payment issued upon total completion and the signing of a Certificate of Completion.
Community and Economic Development

POSTED

about 24 hours ago

DEADLINE

in 6 days
NAICS: 236118
New
SLED
rehab both unit 107 Lacey Lane and 113 Lacey Lane
Solicitation # 168634
The Choctaw Nation Housing Authority is soliciting bids for the comprehensive rehabilitation of two residential units, 107 and 113 Lacey Lane, located in Poteau, Oklahoma. The objective is to make both homes move-in ready, with all work meeting or exceeding 2019 IRC standards. The scope of work includes extensive interior and exterior renovations, such as replacing ridge caps, gutters, and windows, as well as repairing and painting all drywall. Flooring updates involve installing 12x12 VCT tile with a waterproofing membrane across units 107, 113, and 109. Plumbing and electrical upgrades are required for both units, including the installation of new fixtures, Delta plumbing components, and updated electrical panels and lighting. Unit 107 requires a full HVAC replacement with a minimum 14.3 SEER2-rated electric heat pump and new hardwood cabinetry with granite countertops. Special emphasis is placed on ADA compliance, particularly for unit 113, which requires ADA-compliant door thresholds, comfort-height commodes, and a master bathroom equipped with grab bars and a wall-mount shower seat. The contractor is responsible for all permits, line locates, waste removal, and final yard restoration. Prospective bidders must visit the site before submitting quotes, as change orders for conditions identifiable during a site visit will not be approved. Key administrative requirements include providing an AHRI certificate for HVAC equipment to receive payment and obtaining color approvals from John Cook or Kash Clemons. Bids are due by November 2, 2026.
Choctaw Nation Housing Authority

POSTED

1 day ago

DEADLINE

in 6 days

General Info

NAICS

236118 - Residential Remodelers

Place of Performance

Toronto, ON, CAN

Set-Aside

8A

Documents

1

19CA7023Q0004 - Restoration of the Kitchen at the CGR

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of State → American Consulate Toronto
Contacts2 people available
OfficeWASHINGTON, DC, 20520, USA
Office AddressWASHINGTON, DC, 20520, USA

Full Description

Show more
GENERAL: The US Consulate in Toronto has a requirement to renovate the kitchen in the designated Consul General's residence, (CGR), at 152 Warren Road in Toronto. The work shall be done as per attached - Final Kitchen Design Concept and statement of work. The contractor requires experienced trades persons to execute the work in accordance with Ontario building code requirements and manufacturer installation instructions. The contractor shall provide all personnel, equipment, tools, supplies, materials, supervision, and transportation necessary to: Scope of Work General requirements. Remove and dispose offsite existing cabinets, countertops, sinks, flooring, and tiling, then furnish and install new cabinets, countertops, sinks, flooring, and tiling, and appliances as per attached - Final Kitchen Design Concept and general notes. Should there be a discrepancy between the general notes and this scope of work, this scope of work takes precedence. Protect flooring, appliances, and existing condition of the house for the duration of the project. Contractor is responsible for any damages. The contractor shall install masking from an entry point to the work-space area and install other masking as necessary; and cover/protect any appliances remaining in the work area from debris or potential damage. Replace three (3) ceiling fans. The Contractor will remove all appliances from the kitchen. Contractor will install all existing and new appliances at final location. Contractor will provide appliance warranties and instructions. Appliances to include: replace electric range keep existing Hobart dishwasher replace the other dishwasher replace countertop microwave with new over the range microwave new warming drawer keep stainless-steel refrigerator replace white refrigerator/freezer with a new stainless steel one with water hook-up Note: existing gas range and hood fan to remain in place (cover/protect) Cabinets & Countertops: Shall be installed in full accordance with manufacturer's recommendations so as to preserve all warranties. PERFORMANCE PERIOD: September 18, 2023, to October 31, 2023. WORK HOURS: 7:00 AM to 4:00 PM Local Monday through Friday, excluding Federal Holidays. All dimensions in the concept drawings are approximate and are to be confirmed by the Contractor prior to ordering any products or materials. Contractor is responsible for removing debris off-site, regular cleaning, and a final clean-up of the work area. Product Data: Contractor shall submit physical samples for all items (paint, fixtures, flooring, etc.) to customer for final approval prior to installation. Cabinetry Measurements: The contractor shall be responsible for measuring and verifying the area and perimeter of the kitchen space receiving new cabinets and granite countertops. Contractor to prepare the proper 20/20 cabinetry drawings for product orders, installation, etc. 20/20 is the program specific for cabinetry fabrication, supply & installation. Product Data: Contractor shall submit physical samples to customer for approval prior to installation. 1. The contractor shall remove and dispose of offsite all existing cabinets that will be replaced. 2. Replace all upper cabinets & lower cabinets with the following specifications: a. KitchenCraft Cabinetry (or of the same quality or better). b. Layout as indicated on the Kitchen Design Concept Final and Product & Materials Selections. c. Shaker door style https://www.kitchencraft.com/products/shaker. d. Maple species in the Alabaster Painted Finish, Door & Drawer profile to match: 5-piece drawer construction. e. Natural maple interior. f. Full extension drawers with Blum hardware, Dovetail Drawer Construction, 13"D upper cabinets. g. Cabinet Accessories: (1) Pull Out Drawer for Pantry (2) Double Recycling Center (3) Ecofil Recycling Center (4) Tray Dividers (5) Corner Lazy Susan (6) Utensil Drawer Insert (7) Single Recycling Center h. All plywood component cabinetry that meets ANSI/HPVA HP-1 standards. i. 5/8 plywood sides and top and bottom. j. fully concealed, six-way adjustable soft-closing hinge. k. KCMA Quality Certified cabinets. l. Contractor shall install toe kicks and end panels as necessary. m. Add under-cabinet lighting. Countertop and backsplash Contractor shall install countertops Hanstone Quartz (or similar) single slab, no seam, and backsplash 3 x 8 Fan Ash Mix Glossy wall tile applied horizontally, brick pattern 1/16 grout to match. Plumbing Works Make any necessary adjustments for required supply and drainage piping for the work to be completed in the - Final Kitchen Design Concept. Supply and install two new stainless-steel sinks and commercial grade faucets as indicted in the Kitchen Design Concept Final. Flooring Remove existing floor and install new floor with under floor electric heating as per manufacturer's installation instructions, new floor Vincent Grey Stone commercial grade tile (or similar - but must be non-slip) Size 12 x 12 or 24 x 24. Painting Paint includes painting and finishing of exposed interior item. - Paint as used herein means all coating system materials including primers, emulsions, fillers, and other applied materials whether used as prime, intermediate, or finish coats. The extent of the paintwork is to paint all the damaged surfaces as a result of the work in this contract. Apply paint in accordance with manufacturer's instructions. Minimum of two coats. Electrical Electrical - new outlets required as per international electrical code or local code requirements whichever is more stringent. Contractor to coordinate ESA inspection and provide certificate to us. Contractor will be required to correct all work-related issues identified by ESA. All countertops will require GFCI protection. Remove receptacles and switches (and replace with new) as indicated final kitchen design concept and install new.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS