Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on January 1, 1970. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Chambers County — CSJ 0389-02-059 — May 2026 Letting — State-Let Construction

Closed
0389-02-059State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, subsurface investigation, and shoring; pipeline and utility installation involving tunneling, boring, jacking, and cathodic protection; and surface improvements including asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting. Required materials and services also encompass ready mix supply, precast concrete, and the implementation of storm water pollution prevention measures. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. Responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders are encouraged to demonstrate an ability to maintain labor harmony, noting that Kiewit is a signatory to several collective bargaining agreements. Quotes must be submitted via the Building Connected system by the deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 watershed restoration project located within the Little Nespelem RMU. This firm-fixed-price construction contract involves decommissioning six road segments totaling 17,393 feet and installing two tank traps to improve water quality, enhance riparian habitat, and reduce road density impacts on wildlife. The scope of work includes decompacting road surfaces, applying straw mulch and woody debris, removing all non-natural materials such as culverts for approved disposal, and seeding surfaces back to natural vegetation. All work must adhere to Best Management Practices and specific Tribal Law and Order Codes regarding forest practices, water quality, hydraulic practices, fire management, and industrial safety. Selection will be awarded to the lowest responsive and responsible bidder who demonstrates specific experience in road decommissioning, stream crossings, and bank stabilization. Bidders must provide proof of at least 1,000,000 dollars in liability insurance and submit a complete bid packet including a work plan, equipment list, and Sams.gov registration. This solicitation is subject to Indian Preference and Tribal Employment Rights Ordinance (TERO) regulations, requiring a minimum of 51 percent of seasonal or temporary employees to be of Indian preference. Additionally, a 5 percent employment rights fee applies to contracts of 5,000 dollars or more. Sealed proposals must be received by 2 P.M. on October 29, 2026.
Confederated Tribes of the Colville Reservation

POSTED

about 8 hours ago

DEADLINE

in about 22 hours
NAICS: 237310
New
SLED
Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road
Solicitation # 270146
The Silverbell Road Roadway Improvements project, solicitation number 270146, is a major infrastructure initiative by the City of Tucson's Department of Transportation and Mobility. The project involves the reconstruction and widening of 3.27 miles of roadway, specifically 2.63 miles of Silverbell Road from 0.25 miles north of El Camino Del Cerro to 0.2 miles north of Goret Road, 0.50 mile of El Camino Del Cerro, and 0.14 mile of Sweetwater Drive. The scope of work includes the construction of four roadway lanes with medians, curbs, sidewalks, a multi-use path, traffic signals, street lighting, landscaping, irrigation, drainage facilities, and extensive utility work. The estimated price range for the project exceeds 10 million dollars. The contract is divided into two primary phases: a 730-calendar day construction phase and a subsequent 730-calendar day landscape establishment period. Bids are evaluated based on responsiveness and responsibility, with the award granted to the lowest responsive and responsible bidder. Key requirements include a bid security of 10 percent of the total offer and a 5 percent Small Business Enterprise participation goal. The project must adhere to various standards, including the 2015 Pima Association of Governments specifications and HUD guidelines for federally funded programs. Additionally, contractors must comply with stringent data protection and cybersecurity frameworks, ADA requirements, and environmental restrictions regarding herbicide use in protected washes.
Transportation & Mobility

POSTED

about 9 hours ago

DEADLINE

in 24 days
NAICS: 237310
New
SLED
Transit Area Asphalt Resurfacing
Solicitation # 26-044
The Transit Area Asphalt Resurfacing project, solicitation number 26-044, is a municipal construction contract for the City of Turlock, California, with an engineer's estimate of 233,000.00 dollars. The scope of work involves the cold milling and removal of a two-inch asphalt concrete layer, scarifying the native subgrade to 95 percent relative compaction, and applying a new asphalt concrete overlay across approximately 28,400 square feet of pavement at an active Transit Corporation Yard. The project concludes with the installation of permanent thermoplastic striping for bus parking stalls, which must be performed seven calendar days after paving to allow for proper curing. Due to the facility's role in daily CNG bus fueling, the project is subject to strict operational constraints, requiring work to be phased within tight weekend-only windows. The contract will be awarded to the lowest responsive and responsible bidder possessing either a Class A General Engineering or Class C-12 Earthwork and Paving contractor license. Required securities include bid and indemnity bonds of at least 10 percent of the bid amount, and performance and payment bonds equal to 100 percent of the contract price. All work must adhere to California prevailing wage rates for Stanislaus County and City of Turlock Standard Specifications. Performance is tightly scheduled, with substantial completion required within ten days of the Notice to Proceed.
Municipal Services-Engineering

POSTED

about 10 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
SLED
Pedestrian Crossing Safety Improvements (FHWA)
Solicitation # 2025-041
The Pedestrian Crossing Safety Improvements project, solicitation number 2025-041, is a public works contract issued by the Seattle Department of Transportation with an estimated value between 3,250,000 and 3,350,000 dollars. The scope of work involves comprehensive infrastructure and safety enhancements across multiple locations in Washington, including 15th Ave S and Lander St, 33rd Ave S and Myrtle Pl, and several intersections along Rainier Ave S and Beacon Ave S. Key deliverables include the removal and restoration of sidewalks and pavement, installation of pedestrian islands, curbs, curb ramps, drainage structures, and the implementation of RRFB and traffic signals, signing, and channelization. The project also specifically includes electrical and rebar installation. The contract must be physically completed within 120 working days from the Notice to Proceed. Award will be granted to the lowest responsive bidder who meets mandatory and supplemental responsibility criteria, with a tie-breaker preference for the highest use of recycled materials. Compliance requirements are extensive, including a 13 percent Federal Small Business Enterprise goal, adherence to Buy America mandates, and compliance with Federal and State prevailing wage rates. Bidders must provide a bid guaranty of five percent of the total bid and are required to be registered with the federal System for Award Management. Submissions are primarily handled through the OpenGov portal, and the project adheres to the Americans with Disabilities Act and various City of Seattle and APWA general standard provisions.
Public Works

POSTED

about 11 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The contract pertains to a state-let construction project in Chambers County, Texas, solicited by the Texas Department of Transportation under solicitation number 0389-02-059, with a letting date of May 2026. The work includes fiber optic infrastructure deployment, communication system integration, dynamic message sign installation, and pavement marking activities, with performance occurring within Chambers County. The scope involves terminating and splicing at least 48 fiber strands per installation, completing three fiber optic systems each exceeding five miles in length, and ensuring all systems meet specified optical loss thresholds and operational standards. Compliance with federal and state regulations is mandatory, including adherence to Davis-Bacon wage requirements, transportation of at least 50% of ocean freight via U.S.-flag vessels, and submission of certified payrolls using FHWA-347 and Form 1273. Contractors must perform a minimum of 30% of the total contract value using their own workforce, excluding specialty items, and must ensure all subcontractors comply with nondiscrimination, EEO, and cargo preference provisions. Supervisory personnel are required to complete a mandatory four-hour ADA curb ramp workshop prior to work commencement. All materials and installations are subject to inspection at both origin and destination, with final acceptance contingent on engineer approval and compliance with AASHTO and TIA/EIA standards. The contract prohibits any contract type designation other than a state-let construction solicitation, with no indication of fixed-price, IDIQ, or other federal contract classifications. Pricing details are not numerically defined, as all unit costs are listed in non-numeric "DOLLARS and CENTS" format without extended totals, rendering the estimated contract value unavailable. Special provisions mandate the inclusion of certifications for nondiscrimination, on-the-job training participation for disadvantaged groups, and disclosure of interested parties via Form 1295. While no formal evaluation factors, award methodology, or contracting officer contact information are provided, the solicitation requires submission of administrative, financial, and technical components including audited statements, experience questionnaires, and lobbying disclosures via SF-LLL. Packaging, marking, and logistics standards are not addressed beyond cargo preference requirements, and no payment office, invoicing system (e.g., WAWF), or accounting codes (AAC, TAS, ACRN) are specified. The contract enforces liquidated damages for schedule noncompliance and requires contractors to maintain complete records for audit, with ongoing performance evaluations conducted by the agency. No options, security

General Info

State-let construction in Chambers County, TX, for fiber optics, dynamic signs, and pavement markings, with labor, compliance, and audit requirements.

Place of Performance

Chambers, TX, USA

Set-Aside

NONE

Documents

2

CS 0389-02-059 - Regional Goods Movement Program (Chambers County)

PDF, High priority: read this firstitb
High

Chambers 0389-02-059.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas Department of Transportation
ContactsNo contacts available
OfficeTX, USA
Office AddressTX, USA
ContactsNo contact information available

Full Description

Show more
Chambers County — CSJ 0389-02-059 — May 2026 Letting — State-Let Construction

More opportunities from Texas Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
BRIDGE REPAIR
Solicitation # 6510-75-001
Solicitation 6510-75-001 is a contract issued by the Texas Department of Transportation for callout bridge structure repair on IH 20 and other roadways within Ector, Crane, Ward, Loving, Winkler, Midland, Stanton, Andrews, and Upton Counties. The scope of work involves non-site-specific repairs, including concrete structure and beam repairs utilizing carbon fiber reinforced polymer and strand splicing. The project is to be completed within 365 calendar days, with work executed via individual emergency or routine work orders issued by the Engineer. The contract is awarded to the lowest bidder, provided the bid is not mathematically unbalanced and the bidder complies with DHS E-Verify and other state and federal certifications, including nondiscrimination laws under 49 CFR 21 and various Texas Government Code boycott and discrimination prohibitions. Technical requirements mandate adherence to the September 1, 2024, Standard Specifications for Construction of Highways, Streets and Bridges and the Texas Manual on Uniform Traffic Control Devices. Specific quality standards include AWS D1.1, D1.5, and ANSI/AWS D1.3 for welding, and AASHTO LRFD specifications for steel bridge fabrication. All work is subject to inspection by Maintenance Supervisors, with payment requests certified by the Odessa Maintenance Office. Safety protocols require personnel to wear ANSI 107-2004 Class 2 or 3 high-visibility apparel. Compensation includes mobilization paid per county, while specific repair costs are negotiated and agreed upon prior to the commencement of work.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 22 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS