This Sources Sought opportunity from Department Of Justice was posted on June 2, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Chicago Range Erosion Control Project

Closed
15F06725R0000296Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
RIO DE LA PLATA FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 1 PROJECT LOCATION: DORADO AND TOA BAJA, PUERTO RICO
Solicitation # W51DQV26RA002
Solicitation W51DQV26RA002 is a full and open competition for a firm-fixed-price design-bid-build construction contract for the Rio de la Plata Flood Control Project, Supplemental Contract 1, located in Dorado and Toa Baja, Puerto Rico. Managed by the U.S. Army Corps of Engineers under NAICS code 237990, the project has an estimated magnitude between 250 million and 350 million dollars. The scope of work involves extensive river channel widening and modifications across approximately 1.6 miles, the construction of 3.1 miles of earthen levees, and the installation of four concrete culverts with pre-cast pipes and composite flap gates. Additional requirements include the relocation of water, sewer, and electrical utilities, scour protection, demolition of abandoned structures, and wetland mitigation. The estimated period of performance is 1619 calendar days following the receipt of the Notice to Proceed, though offerors are cautioned that all real estate rights for site access have not yet been obtained and will be secured prior to the full notice. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment portal. Awardees are required to provide payment and performance bonds equal to the total bid price within 10 days of award, and firms other than small businesses must submit a subcontracting plan per FAR Part 19. The project also requires the delivery of an operations and maintenance manual detailing procedures for restoring levee geometry after seismic events.
W2SR Endist Caribbean(provis)

POSTED

about 12 hours ago

DEADLINE

in 9 days
NAICS: 237990
New
Federal
Gravesite Expansion Florence National Cemetery 943CM3023
Solicitation # 36C78627Q0018
The National Cemetery Administration Southeast District is seeking sources for general construction services to execute a gravesite expansion at the Florence National Cemetery in South Carolina. This project involves the installation of approximately 3,813 additional pre-placed crypt interment spaces across sections BB through FF and the expansion of the columbarium court with roughly 1,000 new double-sided niche walls. The scope of work also includes the construction of two new roads with asphalt paving and curbing, the implementation of stormwater management infrastructure featuring two detention ponds, and the extension of potable water, sanitary sewer, natural gas, and electrical/communications utilities. The total performance period is 456 calendar days from the issuance of the notice-to-proceed. This opportunity is designated as a Service-Disabled Veteran-Owned Small Business set-aside under NAICS code 237990. Eligible firms must be registered in the System for Award Management and the Vendor Information Portal, with SDVOSB or VOSB claimants requiring certification in the VETBIZ database. A critical requirement is the submission of the VA Notice of Limitations on Subcontracting certification, which stipulates that the contractor shall not pay more than 85 percent of the government-paid amount to firms that are not certified SDVOSBs or VOSBs, excluding the cost of materials. Interested parties must submit a capability statement and the required certifications by November 9, 2026, to be considered for any forthcoming solicitation.
National Cemetery Administration (36C786)

POSTED

about 12 hours ago

DEADLINE

in 19 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Chicago, IL, USA

Set-Aside

NONE

Documents

1

Chicago Erosion Control and Slope Stabilization Project PWS

PDF, High priority: read this firstsow
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

7 updates
PhaseClosed
Posted

Sources Sought

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jun 9, 2025 to Jun 23, 2025.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Justice → FBI - Redstone Arsenal
Contacts2 people available
OfficeREDSTONE ARSENAL, AL, 35898, USA
Office AddressREDSTONE ARSENAL, AL, 35898, USA
Contacts
Lakeita Wilson
Elizabeth Mott

Full Description

Show more
The Design-Build Contractor (DBC) is the single point of responsibility for the performance of contractual requirements. By utilizing performance-based requirements the Government has appropriately shifted the responsibility for making most design decisions to the DBC. The goal of this Design-Build Project is to provide an engineered solutions that can be designed and constructed (within the budget) that will address as many, if not all, the most serious erosion problems at the Chicago Regional Training Facility. The Design-Build Contractor shall institute and foster an innovative, effective, and efficient management program able to address changes and developing conditions while continuing to maintain appropriately high levels of quality within budget constraints. Lake Michigan continues to create erosion distresses which are plaquing the site. The lake's waves batter the shoreline persistently. Above the shoreline, the top of the bluff has been susceptible to shifting soil and stormwater run-off which has led to failed soils and erosion. Storms and wave action has caused erosion and slippage of the slope while wave action at the toe of the bluff has slowly eroded the shoreline and undermined the bluff. The Government hired a contractor several years ago to address these concerns and stabilize the bluff to prevent the continued erosion. The contractor installed a sheet pile retaining wall at the top of the bluff from the south running along the bluff to the north but failed to extend the wall the last 50-75 feet at the northern portion. They also sloped the top of the bluff to direct storm run-off into drainage swells that directed the water to a drainpipe that daylighted above the toe. The grading was found to be insufficient, and the missing portion of the wall allowed for continued erosion of the bluff. Repairs were made to the existing access road leading from the top of the bluff to the toe, however lack of adequate storm water drainage has scoured the aggregate surface. Erosion at the northeast portion of the bluff has already caused debris to wash onto the adjacent landowner's property and continue to see the bluff slide towards Lake Michigan. Grading work performed under the previous contract which was performed close to the northern property boundary was not sufficiently compacted which has allowed continued erosion causing debris to wash onto the adjacent landowner's property and continue to see the bluff slide towards Lake Michigan. Stormwater ponding is also occurring adjacent to the retaining wall at the top of the bluff due to the grading issues that have restricted the volume of vehicles that can park in the area from what was original planned. There also appears to be a continuously flowing leak originating from an existing manhole that provides drainage from the firing range on site to the top of the bluff where the runoff appears to overflow the top to the exposed bluff helping to cause the continued erosion. The project's primary goal is to stabilize the remaining portion of the bluff and properly divert the stormwater run-off to the outfall and into Lake Michigan.

More opportunities from Department Of Justice → FBI - Redstone Arsenal

Same awarding agency

NAICS: 53
New
Federal
Hangar Space, Billings Montana
Solicitation # MT-27-0001
The Department of Justice, through the FBI Redstone Arsenal, is soliciting proposals for the lease of a heated hangar space in Billings, Montana. The required facility must be between 8,000 and 10,000 square feet, feature entry control, and be located either on the Billings Logan International Airport or within a one-mile radius. The lease structure consists of an initial full term of five years, with an initial firm term of three years and a 90-day termination right for the non-firm term. Award will be granted to the responsible offeror providing the lowest priced technically acceptable offer, evaluated via a two-step process. In the first step, the government identifies the lowest priced responsive offer; in the second step, the selected offeror must undergo due diligence, which includes submitting additional documentation, providing evidence of funding commitments, and potentially hosting a physical building tour. HUBZone small business concerns may receive a price evaluation preference unless waived. Key requirements include compliance with local zoning laws, adherence to seismic safety standards, and meeting National Environmental Policy Act and National Historic Preservation Act requirements. Offerors must provide a Phase I Environmental Site Assessment if applicable, and any new construction must achieve an ENERGY STAR label within 18 months of occupancy. Security countermeasures must be installed and their costs amortized into the rent as Building Specific Amortized Capital. Proposals must be submitted electronically via the RSAP portal by October 23, 2026, and must include FBI Form 1364 and FBI Form 1217.
Real Estate and Rental and Leasing

POSTED

7 days ago

DEADLINE

in 2 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS