Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

CI-275 Solano Hall Rm 1201 AV Installation

Active
0000040545State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

California State University Channel Islands is soliciting bids for Project CI-275, a turnkey audiovisual and control system installation for the Solano Hall FIT Studio Room 1201 in Ventura, California. The project requires a qualified contractor to furnish, install, integrate, program, test, and warrant a system that incorporates an existing 75-inch display and Mac mini with new equipment, including two ceiling array microphones, four pendant speakers, digital signal processing and amplification, a wall-mounted touchpanel, and controllable USB switching. All work must be completed between November 2 and November 6, 2026, with a final operational deadline of 5:00 p.m. on November 6, 2026. The project budget is estimated at 30,000 dollars, and delays beyond the completion date are subject to liquidated damages of 200 dollars per calendar day. This is a Design-Bid-Build project requiring a lump sum base bid submitted electronically via the PlanetBids platform by October 16, 2026, at 2:00 p.m. Pacific Time. Bidders must provide bid security equal to 10 percent of the total bid and maintain all required California contractor licenses. The contract mandates compliance with prevailing wage requirements per California Labor Code sections 1720 to 1815 and requires 3 percent Disabled Veteran Business Enterprise participation. A 5 percent preference is available for qualified small businesses. Award criteria are based on the total lump sum bid, and the successful contractor will be responsible for daily site maintenance and the removal of all construction debris.

General Info

Bids for turnkey audiovisual system installation at CSU Channel Islands' Solano Hall.

Documents

4

CI-275 Solano Hall FIT Studio Room 1201 Audiovisual System Installation Bid Proposal Form

PDF, High priority: read this first17 pages · ifb
High

Contract General Conditions for Design-Bid-Build Minor Projects - California State University

PDF, High priority: read this first47 pages · contract-general-conditions
High

Solano Hall FIT Studio Room 1201 AV Installation SOW

PDF, High priority: read this first12 pages · sow
High

Solano Hall Room 1201 AV System Installation - Bid Solicitation CI-275

PDF, High priority: read this first4 pages · ifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → CSU, Channel Islands
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
California State University Channel Islands invites your firm to submit a bid for the Solano Hall FIT Studio Room 1201 Audiovisual System Installation, Project/Bid Solicitation No. CI-275. The Trustees of the California State University invite written bid submittals from qualified contractors for all labor, materials, equipment, engineering, programming, testing, documentation, training, warranty, and related services required to complete the above-named Project at the Channel Islands campus.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
RFP2026-113 Solar Installation on Tybee Island Marine Science Center
Solicitation # 2026-113
The City of Tybee Island, Georgia, is soliciting proposals under RFP 2026-113 for the installation of a fully functional solar array on the flat roof of the Marine Science Center located at 37 Meddin Drive. The project requires a minimum power output of 42kW, utilizing US-made Q-Cell PV modules with a minimum of 400 Watts per panel and SMA Sunny Boy string inverters. All equipment must be UL certified, and the installation must withstand wind loads of 141 miles per hour while complying with all federal, state, and local building codes. To preserve the existing GAF TPO roof warranty, the contractor must be GAF certified, follow a specific six-step process, and utilize the OMG Power Grip System Plus for structural attachment. Sealed proposals must be submitted to Aleesha Robinson at Tybee Island City Hall by 12:00 PM on November 3, 2026, with a pre-proposal meeting and site visit scheduled for October 13, 2026. A responsive bid must include a comprehensive set of documents, including a bid bond, insurance certificates, an occupational tax certificate, and various affidavits regarding E-Verify, SAVE, and debarment. Award selection is based on merit rather than the lowest price. The successful contractor will be required to provide performance and payment bonds for 100 percent of the total contract amount. Payment terms are net 30, with the city retaining 5 percent of the gross value of completed work until specific project milestones are met.
City of Tybee Island

POSTED

2 days ago

DEADLINE

in 29 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS