Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

CIPP Culvert Rehab on Route 78

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans District 11 in San Diego is preparing to undertake a culvert rehabilitation project along Route 78 involving the installation of Cured-in-Place-Pipe liners to repair six existing culverts. The work will be performed using specialized equipment including a vactor truck, a CCTV and cure truck, and a service truck to facilitate inspections, liner placement, and curing processes. All work near the culvert end treatments will be conducted manually by personnel on foot using hand tools only to minimize disruption and protect surrounding infrastructure. The project is forecasted for future solicitation with a posted date of August 7, 2026, and all activities will take place within California. Primary contact for inquiries is Petra Samira El Shammas, Environmental Scientist, reachable via phone or email provided. Further project details can be accessed through the official Caltrans project link.

General Info

Caltrans to rehab six culverts on Route 78 with CIPP liners, manual work only, August 2026 solicitation.

Agency

California → Caltrans, District 11 - San Diego

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(2)

Notice of Exemption for CIPP Culvert Rehab on Route 78

PDFnotice-of-exemption

2N310 CEQA/NEPA Categorical Exclusion Determination for Route 78 Culvert Rehab

PDFcategorical-exclusion-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 11 - San Diego
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 11 - San Diego
Office AddressN/A
Contacts
Petra Samira El ShammasEnvironmental Scientist

Full Description

Show more
A Culvert Repair Project on Route 78 in San Diego County. Project work consists of repairing 6 culverts via Cured-in-Place-Pipe Liner (CIPP). Equipment includes a vactor truck, CCTV/Cure Truck, and a Service truck. Work adjacent to the culvert end treatments will be limited to workers on foot with hand tools only

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process improvements to remove per- and polyfluoroalkyl substances from surface water supplies. The project is solicited under the number LACSD Surface Water PFAS Removal Project No. 251 CA and is open to Disadvantaged Business Enterprises as part of a Department of Transportation set-aside initiative, aiming to promote equitable participation in infrastructure development. Work must be executed in accordance with federal and state regulatory requirements for water quality and environmental protection, with performance localized to the two treatment plant sites in California. Solicitation was posted on August 8, 2026, with responses due by September 3, 2026, and the North American Industry Classification System code 237310 applies, indicating it is a water and wastewater plant construction project. The contracting entity is Pyramid Building & Engineering, Inc., serving as both the organization name and agency, with primary contact for inquiries being John Garrison, reachable via phone or email. All proposals must align with technical specifications for PFAS removal technologies and integration into existing plant infrastructure, ensuring compliance with long-term water safety standards and operational reliability.
Pyramid Building & Engineering, Inc.

POSTED

about 2 hours ago

DEADLINE

in 25 days
View Details