Stormwater Pipe & Structure Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Stormwater Pipe and Structure Installation involves the installation of underground stormwater culvert pipes and concrete structures for prime contractors working on West Virginia Division of Corrections and Rehabilitation facility projects. The scope of work includes the removal of existing galvanized pipe and pre-cast concrete, followed by the installation of new galvanized culvert pipes, concrete stormwater inlets, and manholes to deliver a fully connected drainage system. Due to the sensitive nature of the work sites, all personnel are required to undergo criminal background checks and adhere to strict tool control protocols. The project falls under NAICS code 237310 and is managed by the state of West Virginia, with a response deadline set for October 30, 2026.

General Info

Stormwater pipe and structure installation for West Virginia correctional facilities by October 30, 2026.

Place of Performance

WV, USA

Set-Aside

NONE

Documents

This scope was carved out of ARFQ-0608-DCR270000011.

The full solicitation package (12 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ARFQ-0608-DCR2700000011-6 | Underground Stormwater Culvert Pipe Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyWest Virginia
ContactsNo contacts available
OfficeN/A
Organization / AgencyWest Virginia
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs underground stormwater culvert pipes and concrete structures for prime contractors on West Virginia Division of Corrections and Rehabilitation facility projects. Removes existing galvanized pipe and pre-cast concrete; installs new galvanized culvert pipe and concrete stormwater inlets and manholes. Requires strict tool control and criminal background checks for personnel. Delivers a completed and connected stormwater drainage system.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, and subsurface investigation; heavy construction involving tunneling, boring, jacking, and micro tunneling; and finishing work including asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting. Additional requirements encompass the supply of ready mix, precast concrete, and various utility materials, as well as adherence to Storm Water Pollution Prevention standards. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, with certifications required from approved agencies such as the SBA or MBDA prior to the bid opening. Responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and furnish bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Interested parties must be invited through the Building Connected electronic system, with the final bid deadline set for November 18, 2025. Primary coordination is managed by Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

8 minutes ago

DEADLINE

in 23 days
View Details
NAICS: 237310
New
SLED
ENG HSIP Cycle 12 Butterfield Rd Pedestrian Crossing and 2025 Countywide Drainage Project
Solicitation # 2025-24/2025-28
The HSIP Cycle 12 Butterfield Rd Pedestrian Crossing and 2025 Countywide Drainage Project (Project No. 2025-24/2025-28) is a public works solicitation issued by the County of Marin Department of Public Works. Located at the intersection of Irving Drive and Butterfield Road in unincorporated San Anselmo, California, the project scope includes the installation of two crosswalks, ADA-compliant concrete landings, Rectangular Rapid Flashing Beacons (RRFBs), and two bioretention basins. Additional work consists of minor grind and pave operations, traffic striping, and pavement markings. The engineer's estimate for the project is $550,000, with a required completion timeline of 35 working days. Bids must be submitted electronically via BidExpress by October 27, 2026. To be eligible, bidders must possess a valid Class A license and be registered with the Department of Industrial Relations (DIR) to perform public work. Submission requirements include a bid security of 10% of the base bid, a bidder's qualification statement, and various certifications, including compliance with CARB Off-Road Diesel-Fueled Fleets Regulations and federal debarment and suspension certifications. The contract award will be based on budget requirements and granted to the responsible and responsive bidder with the lowest total base bid. The project is governed by the 2025 Caltrans Standard Specifications (Divisions II through XII), the 2024 Green Book, and 2018 Marin Uniform Construction Standards. Contractors are required to provide a baseline schedule within 15 days of contract execution and maintain a comprehensive Quality Control program. Payment is processed monthly via payment requests submitted to the Engineer, with change order bills submitted through the Department's internet billing system. The contract also mandates strict adherence to prevailing wage rates per Labor Code Sec. 1720 et seq. and full compliance with ADA and Section 504 accessibility standards.
County of Marin

POSTED

2 days ago

DEADLINE

in 2 days
View Details
NAICS: 237310
New
SLED
RFB - REPAIR, REPLACEMENT, AND CONSTRUCTION OF SELECTED CONCRETE SIDEWALKS, CURBS, AND GUTTERS (FY24-25)
Solicitation # BPM013439
The County of San Diego Department of Public Works is soliciting bids for the repair, replacement, and construction of selected concrete sidewalks, curbs, and gutters for the FY24-25 period. The scope of work includes the installation of sidewalks, curb and gutter, cross gutters, driveways, and curb ramps, with specific project areas including Old Hwy 80 and Agua Dulce. All work must adhere to the 2015 Caltrans Standard Specifications and San Diego County Design Standards, specifically DS-21L for detectable warning surfaces. The contract requires strict compliance with the Americans with Disabilities Act of 1990, Buy America requirements, and state prevailing wage rates under Labor Code Section 1720. Proposals will be evaluated based on the total sum of all contract bid items, and the owner reserves the right to reject obviously unbalanced bids. Bidders must provide a bid security of ten percent of the bid amount via cash, certified check, or bidder's bond, while the successful awardee must furnish performance and payment bonds for one hundred percent of the contract value. Submission requires a complete original bid, including representations and certifications, a Small-Local Business Utilization Plan, and a noncollusion affidavit. The deadline for submission via the BuyNet portal or sealed envelope is December 03, 2026, at 2:00 PM local time. The contractor is required to appoint a quality control manager and must notify the Engineer of any noncompliance within 24 hours. Project management milestones include a preconstruction conference within 15 days of contract approval and the submission of a final as-built schedule within 30 days of completion. The solicitation emphasizes nondiscrimination and affirmative action, incorporating various federal regulations and executive orders, and provides specific preferences and certification paths for small, local, and disabled veteran business enterprises.
San Diego County

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

More opportunities from West Virginia

Same awarding agency

NAICS: 237110
New
SLED
ARFQ-0608-DCR2700000011-6 | Underground Stormwater Culvert Pipe Project
Solicitation # ARFQ-0608-DCR270000011
The West Virginia Division of Corrections and Rehabilitation is soliciting bids for a design-build project to install underground stormwater culvert pipes at the Parkersburg Correctional Center and Jail. The scope of work involves replacing existing galvanized culvert pipes and round pre-cast concrete structures, with the contractor assuming responsibility for all engineering documentation signed by a Professional Engineer, site protection, and coordination with state agencies such as the Department of Environmental Protection and the Division of Natural Resources. The project requires the submission of as-built drawings and operations and maintenance manuals upon completion. Work is generally scheduled Monday through Friday from 8:00 am to 4:00 pm, excluding state holidays. The contract will be awarded to the lowest qualified responsible bidder based on the total lump sum bid amount. Bidders must provide a bid bond of 5 percent of the total bid, while the successful vendor must furnish performance and labor/material payment bonds each totaling 100 percent of the contract value. Payment will be made in arrears via electronic funds transfer or P-Card. Compliance requirements include a drug-free workplace affidavit, disclosure of ownership interests, and registration with the Purchasing Division. Final acceptance of the work is subject to an inspection by the Director of Engineering, Construction, and Maintenance to ensure all specifications and quality standards are met.
Water and Sewer Line and Related Structures Construction

POSTED

about 18 hours ago

DEADLINE

in 5 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS