CIPP Culvert Rehab on SR 79
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Caltrans District 11 in San Diego County has issued a forecast for a culvert rehabilitation project along Route 79, focusing on the repair of six culverts using the Cured-in-Place-Pipe (CIPP) liner method. The work involves installing flexible, resin-saturated liners that are cured in place to restore structural integrity without excavation, minimizing disruption to the surrounding infrastructure. Equipment required for the project includes a vactor truck for cleaning, a CCTV and cure truck for inspection and curing operations, and a service truck to support field activities. Work near the culvert end treatments is strictly restricted to manual labor using hand tools to preserve existing structures and prevent damage. The project is managed by the California Department of Transportation, with Petra Samira El Shammas serving as the primary point of contact as Environmental Scientist. The forecast was posted on August 6, 2026, and performance will occur within San Diego County.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
