Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

CIPP Sewer Main Relining Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Fallbrook Public Utility District in California involves the CIPP Sewer Main Relining Installation to rehabilitate 2,777 linear feet of 6 inch and 8 inch sewer mains. The scope of work includes the installation and curing of resin-impregnated flexible tubes using inversion elbows or rings with water pressure, as well as Pull-In-Place installation in accordance with ASTM 1743 and F2019 standards. Additionally, the contractor is responsible for installing hydrophilic water stops at manhole terminations. To ensure quality and compliance, the project requires the use of manufacturer-certified personnel. The work will be performed in Fallbrook, California, under NAICS code 237990. Interested parties must submit their responses by the deadline of November 17, 2026.

General Info

CIPP sewer main relining for Fallbrook Public Utility District, due November 17, 2026.

Place of Performance

Fallbrook, CA, 92028, USA

Set-Aside

NONE

Documents

This scope was carved out of 3197.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Sewer Main Relining FY27

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fallbrook Public Utility District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs installation and curing of resin-impregnated flexible tubes for prime contractors on District sewer rehabilitation projects. Inverts pre-cured tubes using inversion elbows or rings with water pressure and performs Pull-In-Place installation per ASTM 1743 and F2019. Installs hydrophilic water stops at manhole terminations. Requires manufacturer-certified personnel. Delivers 2,777 LF of rehabilitated 6" and 8" sewer mains.

Similar Contracts

Same NAICS industry code

More opportunities from California → Fallbrook Public Utility District

Same awarding agency

NAICS: 237110
New
SLED
Sewer Main Relining FY27
Solicitation # 3197
The Fallbrook Public Utility District is soliciting bids for the Sewer Main Relining FY27 project, identified as Job No. 3197. The scope of work involves the cleaning, derooting, repairing, and relining of approximately 1,674 linear feet of 6-inch and 1,103 linear feet of 8-inch gravity sewer mains using Cured in Place Pipe (CIPP) lining. Key technical requirements include the installation of 18 TopHats, cutting 18 respective laterals, and performing chemical grouting for infiltration repair. The project mandates pre-lining and post-lining CCTV inspections, by-pass pumping as needed, and adherence to Greenbook and ASTM standards for pipeline rehabilitation. The estimated construction value is 200,000 dollars, with a performance period of 150 calendar days. The contract will be awarded to the lowest responsive and responsible bidder based on the total bid price. Bidders must provide a bid bond of at least 10 percent of the total price, and the successful awardee must provide 100 percent performance and payment bonds. Required certifications include Workers Compensation, Non-Collusion, the Iran Contracting Act, and Public Works Contractor Registration. All work must be performed in compliance with California Labor Code prevailing wage requirements and ADA regulations. Final acceptance by the District is contingent upon the completion of punch list items, submission of record drawings and soils test reports, and third-party laboratory testing of 10 percent of installed laterals to verify flexural properties and wall thickness.
Water and Sewer Line and Related Structures Construction

POSTED

about 5 hours ago

DEADLINE

in 22 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS