Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Sewer Main Relining FY27

Active
20261024006State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Fallbrook Public Utility District is soliciting bids for the Sewer Main Relining FY27 project, identified as Job No. 3197. The scope of work involves the cleaning, derooting, repairing, and relining of approximately 1,674 linear feet of 6-inch and 1,103 linear feet of 8-inch gravity sewer mains using Cured in Place Pipe (CIPP) lining. Key technical requirements include the installation of 18 TopHats, cutting 18 respective laterals, and performing chemical grouting for infiltration repair. The project mandates pre-lining and post-lining CCTV inspections, by-pass pumping as needed, and adherence to Greenbook and ASTM standards for pipeline rehabilitation. The estimated construction value is 200,000 dollars, with a performance period of 150 calendar days. The contract will be awarded to the lowest responsive and responsible bidder based on the total bid price. Bidders must provide a bid bond of at least 10 percent of the total price, and the successful awardee must provide 100 percent performance and payment bonds. Required certifications include Workers Compensation, Non-Collusion, the Iran Contracting Act, and Public Works Contractor Registration. All work must be performed in compliance with California Labor Code prevailing wage requirements and ADA regulations. Final acceptance by the District is contingent upon the completion of punch list items, submission of record drawings and soils test reports, and third-party laboratory testing of 10 percent of installed laterals to verify flexural properties and wall thickness.

General Info

Bids for sewer main relining and repair for Fallbrook Public Utility District.

Documents

2

Fallbrook Public Utility District - Job No. 3197 Sewer Main Relining FY 27

PDF, High priority: read this first181 pages · ifb
High

Job 3197 - Sewer Main Relining FY 27 Project Maps

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fallbrook Public Utility District
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Kevin Collins

Full Description

Show more
Bid #3197: The project involves the cleaning, derooting, repairing, and relining of approximately 1674 linear feet of 6-inch and 1103 linear feet of 8-inch gravity sewer main. This includes cutting 18 respective laterals and installing 18 TopHats. The scope also covers necessary cleaning, derooting, chemical grouting for infiltration/repairing of sewer mains and their lateral interfaces. By-pass pumping will be required as needed. Pre-lining and post-lining CCTV inspections are mandatory for all work. Internal spot repairs, including root removal and chemical grouting of excessive infiltration, will be performed. Lateral-Mainline Interface Relining (Top Hat type) is a key component. All work will be thoroughly inspected and video-documented for review and approval by the District's inspector.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include electrical work, welding, construction surveys, preconstruction video, and traffic control. Norstar Plumbing and Engineering, Inc. is managing the solicitation and is specifically seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The project falls under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website, and coordination is handled by primary points of contact Nathan and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 1 hour ago

DEADLINE

in 1 day
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, site grading, and the provision of a fully operating pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with responsiveness contingent upon the submission of a completed EJCDC C-410 Bid Form, a bid bond, and required MWBE documentation, including a Good Faith Efforts Form and Table A. The contractor must provide performance and payment bonds equal to the contract price and maintain insurance with an A.M. Best rating of A-VII or better. Performance is governed by a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to achieve substantial completion. Payments are processed monthly via applications for payment submitted to the Engineer, with payment due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 13 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work includes the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Bids will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines or comments along with the quote.
Garney Pacific, Inc.

POSTED

about 1 hour ago

DEADLINE

in 21 days
View Details

More opportunities from California → Fallbrook Public Utility District

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS