Lateral-Mainline Interface Sealing

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the Fallbrook Public Utility District in California involves the installation of watertight seals, specifically T-Liners or Top Hats, for prime contractors working on District sewer rehabilitation projects. The scope of work requires the re-establishment of lateral interfaces using internal cutting machines and the installation of T-Liner type interface liners that extend 18 inches up the lateral in accordance with ASTM F2561-06 standards. The contractor is responsible for utilizing resin injection processes following all manufacturer recommendations to deliver a total of 18 installed lateral-mainline interface seals. The project is located in Fallbrook, California, and falls under NAICS code 238910. Responses for this opportunity are due by November 17, 2026.

General Info

Install 18 watertight sewer lateral seals in Fallbrook, California by November 17, 2026.

Place of Performance

Fallbrook, CA, 92028, USA

Set-Aside

NONE

Documents

This scope was carved out of 3197.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Sewer Main Relining FY27

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fallbrook Public Utility District
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs watertight seals (T-Liners or Top Hats) for prime contractors on District sewer rehabilitation projects. Re-establishes lateral interfaces using internal cutting machines and installs T-Liner type interface liners extending 18 inches up the lateral per ASTM F2561-06. Utilizes resin injection processes following manufacturer recommendations. Delivers 18 installed lateral-mainline interface seals.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
Construction On State Highway In Santa Barbara County Near Buellton At Various Locations From 3.6 Miles North Of Route 1/101 Separation To 1.3 Miles South Of Route 101/246 Separation
Solicitation # 05-1K4514
The California Department of Transportation (Caltrans) is soliciting bids for contract 05-1K4514, which involves landscape planting and erosion control on a State Highway in Santa Barbara County near Buellton. The project scope covers various locations from 3.6 miles north of the Route 1/101 separation to 1.3 miles south of the Route 101/246 separation. The estimated project cost is 480,000 dollars, and bids must be submitted on a unit price basis via the Bid Express website by 2:00 p.m. on November 18, 2026. The project timeline is divided into two phases: general construction must be completed within 40 working days, while plant establishment work is allotted 750 working days, bringing the total project duration to 790 working days. A minimum of 79,000 dollars must be allocated for plant establishment work. The contract includes a 5 percent Disabled Veteran Business Enterprise (DVBE) goal and specific Small Business Enterprise (SBE) participation requirements. Bidders must provide security equal to at least 10 percent of the bid and submit a subcontractor list and certification status at the time of bidding. Compliance requirements include adherence to 2025 Standard Specifications and Standard Plans, as well as prevailing wage rates determined by the California Department of Industrial Relations. Quality assurance requires QC personnel to hold ACI Concrete Field-Testing Technician Grade 1 certification. Additionally, the contractor must provide environmental product declarations for hot mix asphalt and concrete and follow specific marking requirements for temporary concrete barriers. Final acceptance is contingent upon the submission of a Final Report on the Utilization of Small Business Enterprise within 10 days of contract acceptance.
California Department of Transportation (Caltrans)

POSTED

about 4 hours ago

DEADLINE

in 23 days
View Details

More opportunities from California → Fallbrook Public Utility District

Same awarding agency

NAICS: 237110
New
SLED
Sewer Main Relining FY27
Solicitation # 3197
The Fallbrook Public Utility District is soliciting bids for the Sewer Main Relining FY27 project, identified as Job No. 3197. The scope of work involves the cleaning, derooting, repairing, and relining of approximately 1,674 linear feet of 6-inch and 1,103 linear feet of 8-inch gravity sewer mains using Cured in Place Pipe (CIPP) lining. Key technical requirements include the installation of 18 TopHats, cutting 18 respective laterals, and performing chemical grouting for infiltration repair. The project mandates pre-lining and post-lining CCTV inspections, by-pass pumping as needed, and adherence to Greenbook and ASTM standards for pipeline rehabilitation. The estimated construction value is 200,000 dollars, with a performance period of 150 calendar days. The contract will be awarded to the lowest responsive and responsible bidder based on the total bid price. Bidders must provide a bid bond of at least 10 percent of the total price, and the successful awardee must provide 100 percent performance and payment bonds. Required certifications include Workers Compensation, Non-Collusion, the Iran Contracting Act, and Public Works Contractor Registration. All work must be performed in compliance with California Labor Code prevailing wage requirements and ADA regulations. Final acceptance by the District is contingent upon the completion of punch list items, submission of record drawings and soils test reports, and third-party laboratory testing of 10 percent of installed laterals to verify flexural properties and wall thickness.
Water and Sewer Line and Related Structures Construction

POSTED

about 5 hours ago

DEADLINE

in 22 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS