Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

CIPP Sewer Rehabilitation Specialist

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for CIPP Sewer Rehabilitation Specialist involves the rehabilitation of combined sewers for the Metropolitan St. Louis Sewer District on projects managed by the USACE St. Louis District. The scope of work includes the installation of CIPP liners in sewers ranging from 21 to 24 inches in diameter, covering approximately 2,676 linear feet. The contractor must utilize specialized CIPP lining systems and curing equipment to deliver fully rehabilitated sewer lines that meet all MSD specifications. The project is categorized under NAICS code 237110 and is performed within the 63133 zip code area. Strict adherence to EM 385-1-1 safety standards and Buy America provisions is required for the duration of the contract. This effort is coordinated through the Department of Defense under the W07V Endist St Louis agency.

General Info

CIPP sewer rehabilitation of 2,676 linear feet for Metropolitan St. Louis Sewer District.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

MO, 63133

Set-Aside

NONE

Documents

This scope was carved out of W912P926BA009.

The full solicitation package (9 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

MSD Infrastructure Repairs Phase 2

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist St Louis
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs rehabilitation of combined sewers for prime contractors on USACE St. Louis District projects for the Metropolitan St. Louis Sewer District. Installs CIPP liners in sewers 21" to 24" in diameter across approximately 2,676 linear feet. Utilizes CIPP lining systems and curing equipment. Requires compliance with EM 385-1-1 and Buy America provisions. Delivers fully rehabilitated sewer lines meeting MSD specifications.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing lagoons and the construction of a new headworks facility, including a mechanical chain and rack bar screen and a screenings washer, compactor, and grinder unit. Key technical upgrades include the replacement of influent pumps and surface aerators, the installation of a new sludge dewatering and wasting pipeline, and the creation of two wire mesh soil cement lined sludge dewatering ponds. The scope of work further extends to the construction of a new CMU operations and electrical building equipped with HVAC and plumbing, a reinforced concrete pad for an emergency generator, and the implementation of a facility-wide PLC/SCADA monitoring system. Additional civil improvements such as asphalt resurfacing, grading, and piping are also required. This opportunity is set aside for small businesses and certified DBE, MBE, and WBE firms across various construction-related NAICS codes. Interested parties must submit their responses by October 21, 2026.
GSE Construction Co., Inc.

POSTED

about 2 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies on Walnut Street, Ebony Lane, and 247th Place. The scope of work includes the abandonment of existing water mains and requires the furnishing of all necessary materials, tools, and equipment. W.A. Rasic Construction Company, Inc. is soliciting subcontractor quotations for various trades, including waterworks, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, hot taps, trucking, and soil and compaction testing. This solicitation is specifically targeted toward DBE, MBE, WBE, and SBE firms, with the prime contractor encouraging the formation of consortiums for larger portions of the work. Subcontractors must hold a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. Additionally, subcontractors may be required to provide payment and performance bonds totaling 100 percent of their bid, with bond premiums reimbursed up to 1.5 percent. All quotations must be submitted to Estimating Manager Matt Metoyer by the deadline of October 19, 2026.
W.A. Rasic Construction Company

POSTED

about 2 hours ago

DEADLINE

in 17 days
View Details

More opportunities from Department Of Defense → W07V Endist St Louis

Same awarding agency

NAICS: 237990
Federal
LOCK AND DAM 25 NEW 1,200 FT LOCK NAVIGATION AND ECOSYSTEM SUSTAINABILITY PROGRAM (NESP)
Solicitation # W912P926RA004
The U.S. Army Corps of Engineers, St. Louis District, is soliciting proposals for the design, construction, and commissioning of a new 1,200-foot drilled-shaft founded lock chamber at Lock and Dam 25 in Winfield, Missouri, as part of the Navigation and Ecosystem Sustainability Program. The project scope includes the construction of the new lock chamber riverward of the existing 600-foot lock, an upstream ported guard wall, a downstream guard wall, and various site development features such as staging and disposal areas. Once operational, the existing 600-foot lock will serve as an auxiliary chamber for recreational traffic or emergency use. The contract requires the integration of specific brand-name Rockwell/Allen-Bradley PLC and SCADA components to ensure compatibility with existing control systems. This is a full and open competition for a firm-fixed-price contract with economic price adjustments based on PPI for commodities like steel and concrete. The award will be based on a best-value tradeoff, evaluating five factors: past performance, construction approach, river and intermediate wall means and methods, small business participation, and price. The project includes a base period with multiple one-year options and requires a project labor agreement, adherence to Buy American Act standards, and compliance with Davis-Bacon wage determinations for Illinois and Missouri. Proposals must be submitted electronically via the PIEE Solicitation module by November 16, 2026.
Other Heavy and Civil Engineering Construction

POSTED

15 days ago

DEADLINE

in about 2 months
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS