This Government Contract opportunity from California was posted on June 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Citrus Avenue and Redlands High School Crossing Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The City of Redlands is seeking professional engineering consulting services to address safety and operational challenges at a high-traffic pedestrian crossing along Citrus Avenue between the north and south campuses of Redlands High School. With hundreds of students, faculty, and staff crossing daily, the current at-grade pedestrian-activated crossing has proven insufficient due to ongoing conflicts between pedestrians and vehicles, driver inattentiveness, traffic delays, and hindered emergency response times. The project aims to evaluate and design a grade-separated pedestrian crossing solution that enhances safety for all users while minimizing disruptions to vehicular traffic and ensuring reliable access for emergency vehicles. Additional goals include improving bicycle and pedestrian connectivity between the two campuses and delivering a constructible, financially feasible long-term transportation improvement. The consulting services will involve comprehensive analysis of existing conditions, evaluation of alternative designs, development of engineering plans, and preparation of a final recommendation that meets all project objectives. The solicitation is open under the number 20260716GD, with proposals due by July 16, 2026, and no bid bond is required. The contract is managed by the Municipal Utilities and Engineering Department of the City of Redlands, with Goutam Dobey serving as the primary point of contact. The work is to be performed at the Citrus Avenue corridor in Redlands, California, and the selected firm will be tasked with delivering a solution that balances public safety, traffic efficiency, and fiscal responsibility.
General Info
Agency
NAICS
Place of Performance
35 Cajon St. Suite 15A Redlands, California 92373, CA, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Redlands High School operates two campuses located on opposite sides of Citrus Avenue. Throughout the school day, hundreds of students, faculty, and staff cross Citrus Avenue between class periods. Although the crossing is currently controlled by pedestrian-activated traffic control measures, conflicts between pedestrians and vehicular traffic continue to occur.
The existing at-grade crossing presents safety concerns due to high pedestrian volumes, driver inattentiveness, traffic delays, and operational impacts to emergency response vehicles. The City desires to evaluate grade-separated crossing alternatives that improve pedestrian safety, maintain traffic operations, and provide a long-term transportation solution.
The primary objectives of the project are to:
• Improve pedestrian safety for students, faculty, and staff crossing Citrus Avenue. • Reduce vehicle-pedestrian conflicts along the corridor. • Minimize traffic congestion and operational delays caused by frequent pedestrian crossings. • Improve emergency vehicle access and response times. • Enhance bicycle and pedestrian connectivity between the two campuses. • Develop a constructible and financially feasible grade-separated crossing solution.
Bid Bond: 0.00%
