Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

City of Burlington Wastewater Treatment Plant - CMAR

Active
city-burlington-wastewater-treatment-plant-cmar

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Burlington Wastewater Treatment Plant project is a Construction Manager at Risk solicitation for the building of a sequencing batch reactor wastewater treatment plant located in Colorado. Bids are due by 12:00 PM MDT on October 15, 2026. The project is managed by Rice Lake West, with Karen Calabro serving as the primary point of contact. The scope of work is divided into multiple bid packages covering a wide range of construction and supply needs. Key requirements include site work, concrete, metals and FRP, joint sealants, and general construction. Specialized procurement is required for various pumps, chemical feed systems, and automatic samplers, as well as the supply and installation of pre-engineered metal buildings. Additional trades include HVAC, plumbing, process piping, electrical, instrumentation and control, and the installation of doors, glazing, and industrial coatings.

General Info

Burlington wastewater plant construction project; bids due October 15, 2026, managed by Rice Lake.

Place of Performance

CO, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyRice Lake West
Contacts1 person available
OfficeN/A
Organization / AgencyRice Lake West
Office AddressN/A

Full Description

Show more
Project: City of Burlington Wastewater Treatment Plant - CMAR Bids Due: October 15, 2026 by 12:00 PM MDT BRIEF PROJECT DESCRIPTION: Construction of a sequencing batch reactor (SBR) wastewater treatment plant. SCOPES OF WORK INCLUDE BUT ARE NOT LIMITED TO: Bid Package # Scope/Bid Package Description BP-2 Site Work BP-3 Concrete BP-5.1 Supply Metals & FRP BP-5.2 Install Metals & FRP BP-7 Joint Sealants BP-8.1 Supply Doors & Hardware BP-8.2 Overhead Coiling Doors BP-8.3 Glass and Glazing BP-9 Coatings & Flooring BP-10 General Construction BP-11.1 Supply of NP Water Pumps BP-11.2 Supply Submersible Centrifugal Pumps BP-11.3 Supply Alkalify Dry Chemical Feed System BP-11.4 Supply Chemical Metering Pumps and Accessories BP-11.5 Supply Automatic Sampler BP-13.1 Supply PEMB BP-13.2 Install PEMB BP-15.1 HVAC BP-15.2 Plumbing BP-15.3 Process Pipe BP-16 Electrical and I&C

Similar Contracts

Same NAICS industry code

NAICS: 221320
New
Federal
Grade 2 wastewater operator
Solicitation # 12444026Q0230
The Six Rivers National Forest is seeking a qualified Contract Operator to provide comprehensive operations, maintenance, service, and repairs for the Orleans Wastewater Treatment Plant and its associated infrastructure in Eureka, California. This firm fixed price purchase order is a total small business set-aside, specifically targeting economically disadvantaged women-owned small businesses. The period of performance consists of a base period from October 1, 2026, to March 31, 2027, with one option period extending through September 30, 2027. The Forest Service will remain the permit holder and retain ultimate responsibility for the overall system performance. The primary operator must hold a California Grade II Wastewater Operator Certificate or higher and possess Cal OSHA-compliant confined space entry training. Additionally, the contractor must register with the Wastewater Operator Certification Program within 30 days of the contract start and ensure the availability of backup and emergency personnel, including a Grade I certified operator and a Designated Operator-In-Charge. Key responsibilities include maintaining site security to exclude public access, managing sample packaging and overnight shipping via UPS, and submitting quarterly and annual reports to the State Water Quality Control Board. Award will be granted to the lowest priced, technically acceptable offer with an acceptable or neutral past performance rating. To be responsive, offerors must provide pricing for all line items, demonstrate the ability to meet the Statement of Work schedule, and provide necessary certifications. The contractor is also required to maintain comprehensive general liability insurance naming the Forest Service as an additional insured. Quotes are due by September 28, 2026.
Six Rivers National Forest

POSTED

4 days ago

DEADLINE

in 2 days
View Details
NAICS: 221320
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted, full and open competition for a firm-fixed-price construction project to replace the wastewater treatment plant at South Rim Village in Grand Canyon National Park, Arizona. The project involves the installation of a GD Membrane Bio-Reactor plant, including process systems, instrumentation, electrical utilities, and administrative buildings, as well as the complete demolition of existing infrastructure and improvements to the facility access road. The contract magnitude is estimated to exceed 100 million dollars, with a period of performance from February 1, 2027, to February 1, 2030, and a requirement to complete the work within 1,095 calendar days after the notice to proceed. The scope also includes a 12-month operational support period following construction. The government will award the contract based on a multi-factor, best-value tradeoff process, weighing price against technical factors including project experience, technical approach, key personnel qualifications, management approach, and small business participation. Offerors must provide performance and payment bonds and adhere to union prevailing wage rates. Technical requirements include strict cybersecurity hygiene for SCADA/MES equipment and the provision of full data and software rights to the government. Proposals must be submitted electronically in two volumes by November 2, 2026, and include a detailed price schedule covering the plant replacement, compost facility, O&M support, and access road improvements, along with options for radon gas testing and mitigation.
Dsc Contracting Services Division

POSTED

8 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221320
SLED
Bid # 6000003484 - Operation And Maintenance of Bulk and Satelitte Fuel Farm Wasterwater Treatment Facilities At John F. Kennedy International Airport, Jamaica, NY – Four (4) Year Contract
Solicitation # 6000003484
The Port Authority of New York and New Jersey is soliciting bids for a four-year contract to provide operation and maintenance services for the bulk and satellite fuel farm wastewater treatment facilities at John F. Kennedy International Airport. The contract is expected to commence on or about January 12, 2027, and expire on January 11, 2031, with the Port Authority retaining an option to extend the term for one additional year. The scope of work includes daily, weekly, and monthly maintenance tasks, process monitoring, and adherence to SPDES Permit guidelines and EPA safety standards. The contractor is responsible for the full lifecycle of waste management, including the characterization, transport, and disposal of all generated waste. Award selection is based on the best value proposal, evaluating price, the quality of the work plan, past experience, and the bidder's ability to meet supplier selection goals for small, local, or disadvantaged firms. Key personnel requirements include a permanent Project Manager present at the facility at least eight hours per week and a designated Safety Director. Security is a critical component, requiring all personnel to undergo background checks via the Secure Worker Access Consortium and obtain JFK SIDA cards. Bids must be submitted electronically through the Euna Procurement platform by September 28, 2026. Pricing is structured across several exhibits covering annual labor, equipment replacement, biometric systems, and specialized subcontractors.
Port Authority Of Ny & Nj

POSTED

12 days ago

DEADLINE

in 2 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS