Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on January 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

City of Edmonton - Invitation to Bid - 935501 112 Avenue over Wayne Gretzky Drive (B139), Bridge Rehab - 2646

Closed
AB-2026-00200International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including SWPPP and quality control. Kiewit is specifically seeking qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Furthermore, Kiewit prioritizes bidders who can demonstrate an ability to maintain labor harmony on the project. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid through the Building Connected electronic system. The deadline for bid submissions is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 7 days
NAICS: 237310
New
SLED
RFB-PARKS-MISSISSIPPI RIVER BLVD RETAINING WALLS REBID
Solicitation # 1777
The City of Saint Paul Parks Department is soliciting bids for the Mississippi River Blvd Trail Improvement Project, which involves the removal and reconstruction of retaining walls, trails, and fencing near Princeton Avenue. The scope of work includes the removal of existing Loffelstein walls and bituminous walks, the installation of soldier pile walls with galvanized steel bridge plank lagging, and the paving of a new bituminous trail. The base bid must include an ADA trail transition to connect to the existing trail. Key deliverables include site protection, erosion control, and the installation of concrete pile caps and structural backfill. The contract will be awarded to the lowest responsible base bidder based on an evaluation of their experience, financial resources, and technical capabilities. Bidders must submit their responses via the City of Saint Paul Supplier Portal by December 9, 2026, using the required Excel bid form. Mandatory compliance requirements include adhering to the City of Saint Paul Little Davis-Bacon prevailing wage standards and Affirmative Action/Equal Employment Opportunity specifications. Upon award, the successful contractor must provide performance and payment bonds, certificates of insurance, and human rights compliance documentation. The work is subject to a one-year guarantee from the date of substantial completion.
City of Saint Paul

POSTED

about 11 hours ago

DEADLINE

in 28 days
NAICS: 237310
New
SLED
RFB-PW-SAINT ANTHONY MILL&VERLAY 2026
Solicitation # 1785
The City of Saint Paul Parks Department is soliciting bids for the 2026 Saint Anthony Mill and Overlay project, located along Saint Anthony Avenue and Rondo Avenue between Snelling Avenue and Marion Street. The scope of work focuses on pavement resurfacing via a standard 2-inch mill and overlay, as well as significant pedestrian and safety enhancements. Key deliverables include the construction of curb extensions, ADA-compliant pedestrian ramps, concrete curb replacement, storm sewer installation, and the paving of off-street bike paths. All work must adhere to the City of Saint Paul Department of Public Works governing specifications and the 2026 MnDOT Schedule of Materials Control. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit all documentation through the City of Saint Paul Supplier Portal by December 7, 2026, at 2:00 PM CST. Required financial protections include a performance bond and a payment bond, each equal to 100% of the contract amount, and general liability insurance with a $1,500,000 per occurrence limit. The project is subject to the Little Davis-Bacon Ordinance regarding prevailing wages and includes a Vendor Outreach Program to encourage the participation of local small, woman-owned, and minority-owned businesses. Contractors must also provide a signed statement under oath verifying compliance with minimum criteria per Minnesota Statutes.
City of Saint Paul

POSTED

about 11 hours ago

DEADLINE

in 26 days

AI Contract Overview

Show more

The contract entails the comprehensive rehabilitation and repair of the 112 Avenue over Wayne Gretzky Drive (B139) Bridge in Alberta, involving the full scope of labor, materials, equipment, and services necessary to complete the project. Key tasks include site mobilization and demobilization, managing traffic and pedestrian flow, establishing temporary construction facilities and security, and protecting existing utilities. The work covers a wide range of structural repairs such as partial and full-depth concrete repairs, shear key repairs, bearing pad replacement and refurbishment, concrete crack repair, and deck joint replacement with a Type 1 strip seal. Additional scope includes galvanic corrosion protection, deck surface preparation and overlay using high-performance concrete with steel fibers, concrete cleaning, finishing, sealing, installation of new sidewalks, shared-use paths, curbs, barriers, streetlight replacements, utility duct installation, slope protection repairs, and miscellaneous bridge repairs. Approach roadway improvements are also included, involving median modifications, transition paving, curb, gutter, and sidewalk work. The contract specifically requires thorough work site management, including temporary shoring, and mandates traffic and pedestrian accommodation throughout the execution period. Cleanup, warranty, maintenance, and final inspection leading to contract closeout are integral components of the project completion. The contract is issued by the City of Edmonton, with a solicitation number AB-2026-00200, and responses are due by February 5, 2026. The contracting authority is Melanie Tyson, and the project falls under federal government oversight, reflecting a precise and detailed scope to enhance the bridge's structural integrity and functionality.

General Info

Rehabilitation and repair of 112 Avenue Bridge including concrete, utilities, traffic management, and roadway improvements.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Feb 5, 2026 to Feb 12, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → City of Edmonton
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Melanie TysonContracting Authority

Full Description

Show more
This Work includes the supply of all labour, materials, equipment and services required to complete the construction of the 112 Avenue over Wayne Gretzky Drive (B139) Bridge rehabilitation and repair. The Work includes, but is not limited to the following: Mobilization and demobilization Traffic and pedestrian accommodation and staging Work Site management including temporary construction facilities, security, and protection of existing Utilities Temporary shoring Sidewalk removal Median removal Bridge rail removal Surface removal Partial and full depth concrete repair Shear key repairs Bearing pad replacement Bearing refurbishment Concrete crack repair Deck joint replacement - Type 1 strip seal Galvanic corrosion protection Deck surface preparation Deck concrete overlay - class HPC with Steel Fibres Concrete cleaning, surface finish, and sealing New sidewalk and SUP New curbs and barriers Street light replacement New utility ducts Concrete slope protection repairs Miscellaneous repairs Approach road median modifications Approach road transition paving Approach road curb and gutter and sidewalk work Work Site cleanup Warranty and maintenance Final inspection and Contract closeout

More opportunities from Government of Canada → City of Edmonton

Same awarding agency

NAICS: 237310
International
City of Edmonton - Request for Qualification - 935686 Prequalification of Prime Contractors for Alley Renewal Projects
Solicitation # AB-2026-01089
The City of Edmonton is seeking to pre-qualify prime contractors for Alley Renewal Construction projects under solicitation AB-2026-01089, with responses due by February 6, 2030. This initiative encompasses a broad scope of work including excavation, reconstruction of curbs, gutters, sidewalks, and private and alley crossings, installation of catch basins, placement of granular base and asphaltic concrete resurfacing, milling of existing surfaces, installation of alley lighting, and landscape restoration through topsoil and sod placement as well as tree planting. All work must align with referenced project plans and include any incidental tasks necessary for complete project delivery. Contractors must demonstrate the capability to perform these specialized tasks to be considered eligible for future project awards. The solicitation is open to qualified entities responding to the prequalification process and is managed by the City of Edmonton with Naseer Paracha serving as the contracting authority, reachable via [email hidden]. Though the posting appears on the Canada Buys portal under an agency designation of Government of Canada, the project is fully administered by the City of Edmonton, with performance requirements centered within the city's limits in Alberta. There is no set-aside designation listed, indicating the opportunity is open to all eligible contractors regardless of size or ownership structure. Participation requires submission of detailed qualifications and experience to meet the City’s standards for execution of municipal infrastructure renewal works.
Highway, Street, and Bridge Construction

POSTED

8 months ago

DEADLINE

in about 3 years
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS