City of Fort Bragg Raw Water Line Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Fort Bragg, represented by John Smith, has entered into Lake and Streambed Alteration Agreement EPIMS-MEN-49514-R1C with the California Department of Fish and Wildlife. This project, located within the Noyo River watershed in Mendocino County, focuses on the Hare Creek Diversion Project and the broader Raw Water Line Replacement Project. The scope of work includes the replacement of approximately 100 feet of pipeline under Hare Creek using dewatering and open trench excavation, as well as the removal of 881.5 cubic feet of debris, such as tires and appliances, from Covington Gulch. To mitigate environmental impacts, the project includes slope stabilization and erosion control using organic materials sourced from the site and the placement of wood structures to fill voids in the stream bed and bank. All activities must adhere to Fish and Game Code section 1602 and the Covington Gulch Debris Removal Mitigation Proposal submitted on August 26, 2024. The California Department of Fish and Wildlife has determined that the project will not have a significant environmental effect, provided that the adopted mitigation measures and monitoring plans are followed.

General Info

Fort Bragg and CDFW agreement for pipeline replacement and debris removal at Hare Creek.

Agency

California → City of Fort Bragg

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Fort Bragg, CA

Set-Aside

NONE

Documents

(2)

Notice of Determination for City of Fort Bragg Raw Water Line Replacement Project EPIMS-MEN-31384-R1C

PDFdetermination-and-findings

NOD_MEN-49514-R1C Notice of Determination for Hare Creek Diversion Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fort Bragg
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Fort Bragg
Office AddressN/A
Contacts
Jennifer GarrisonSenior Environmental Scientist Specialist
John SmithPlanning and Building Department

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement (EPIMS-MEN-49514-R1C), pursuant to Fish and Game Code section 1602, the project Applicant, John Smith, representing the City of Fort Bragg. Work for the Hare Creek pipeline replacement will include dewatering and open trench excavation using hand tools and a small excavator to replace approximately 100 feet of the existing pipeline segment under Hare Creek. The Covington Gulch Debris Removal will consist of the removal of approximately 881.5 cubic feet of debris from Covington Gulch, including tires, appliances, and car parts using hand tools. Work will also include slope stabilization and erosion control along the hillside using logs and branches sourced from the trees proposed for removal as part of the associated water line project. In addition, “seed” material (two small wood structures containing logs with root balls and logs with branches) will be placed within Covington Gulch to fill the voids in the bed and bank of the stream from the debris removal. Work will be completed as described in the Covington Gulch Debris Removal Mitigation Proposal submitted to CDFW on August 26, 2024.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Federal
Z2NZ-- 658-23-108 Correct Stormwater Drainage
Solicitation # 36C24626B0031
Solicitation 36C24626B0031 is an Invitation for Bids (IFB) issued by the Department of Veterans Affairs Network Contracting Office 6 for Project 658-23-108, which involves correcting stormwater drainage at the Salem VA Medical Center in Salem, Virginia. The project is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with an estimated construction magnitude between $10,000,000 and $20,000,000. The scope of work includes providing all labor, materials, and equipment for general construction and utility work, specifically the installation of a dewatering system to control ground surface water during excavation. The performance period is 450 calendar days from the issuance of the Notice to Proceed. The contract will be awarded based on FAR Part 14 Sealed Bidding procedures, typically to the lowest responsive and responsible bidder. Eligible SDVOSB bidders must be registered in the System for Award Management (SAM) and are required to perform at least 25% of the construction work. Key requirements include a bid guarantee of at least 20% of the bid price (capped at $3,000,000), adherence to Davis-Bacon wage determinations, and the ability to demonstrate the completion of three similar projects within the last three years. The final bid submission deadline was extended to October 20, 2026, with a public bid opening on October 21, 2026.
246-NETWORK Contracting Office 6 (36C246)

POSTED

about 1 hour ago

DEADLINE

in 28 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 9 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS