Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

City of Point Arena Municipal Pier Repair & Maintenance Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Point Arena Municipal Pier Repair and Maintenance Project is a forecasted public works initiative located at the Point Arena Pier in Mendocino County, California. The scope of work focuses on the comprehensive repair and replacement of critical pier infrastructure, including all pier railings, 16 pile jackets, four ocean access ladders, 11 concrete deck panels, and various deck panel soffit spalls. Additional maintenance includes timber curbs, fish cleaning stations, lighting fixtures, water shutoff valves, electrical panels, and various components of the bathrooms and harbormaster office. The project also involves concrete backfill for pier abutment protection and the installation of new safety and accessibility features, such as an ADA-compliant fishing station, a small skiff storage rack under 200 square feet, two new light fixtures, three safety bollards, and safety and rules signage. Administratively, the project is managed by the City of Point Arena, with City Planner Marie Jones serving as the lead agency contact. The project has been granted a Notice of Exemption under California Public Resources Code sections 15301, 15302, and 15303, confirming that the maintenance and minor alterations to the existing structure will not result in significant environmental impacts. While the project is identified under NAICS code 237990, there are currently no specified contract values, formal solicitation numbers, or federal acquisition regulation clauses, as the documentation primarily reflects local regulatory compliance and project forecasting. Performance and inspection are expected to take place on-site at the Point Arena Pier.

General Info

City of Point Arena repairs pier railings, decks, lighting, ADA stations, and safety features with no new construction.

Agency

California → City of Point Arena

Place of Performance

830 Port Rd, Point Arena CA, Point Arena, CA, 95468

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Point Arena
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Point Arena
Office AddressN/A

Full Description

Show more
The project includes repair or replacement of all pier railings, 16 pile jackets, 4 ocean access ladders, 11 concrete deck panels, various deck panel soffit spalls, timber curb, curbs, fish cleaning stations, lighting fixtures, water shutoff, electrical panel and various features of the bathrooms and harbormaster’s office. The project includes backfill of concrete to repair pier abutment protection. The project includes installation of a new ADA fishing station, a small skiff storage rack, installation of two new light fixtures at the end of the pier and overlooking both docks, installation of three bollards at end of deck for safety, and installation of safety and rules signage.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 22 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

1 day ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS