Ratzlaff Merced River Project (Notification of Lake or Streambed Alteration, No. EPIMS-MER-49127- R4)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has authorized the Ratzlaff Merced River Project under Streambed Alteration Agreement No. EPIMS-MER-49127-R4, issued pursuant to Section 1602 of the Fish and Game Code, to Rodney Ratzlaff for the replacement of an existing water intake diversion structure with a new intake pipe and electric pump system. The project is located at 1490 Youd Road in Winton, Merced County, California, within Section 26, Township 5 South, Range 13 East, with GPS coordinates at latitude 37.46781° N and longitude -120.50968° W. The work is limited to maintaining the existing purpose and capacity of the diversion without expansion or increased environmental impact and is exempt from further environmental review under California Code of Regulations, Title 14, Section 15302, as a categorical exemption for repair or replacement of an existing facility. The agreement requires compliance with all protective measures outlined in the permit to ensure no significant adverse effects on fish or wildlife resources. Project oversight is managed by the California Department of Fish and Wildlife, Region 4 - Central, based in Fresno, with Jackson Powell serving as the primary environmental scientist responsible for technical coordination and monitoring, and Rodney Ratzlaff acting as the applicant and point of contact for the project. No formal contract value, pricing, or financial terms are specified, as this is an environmental regulatory agreement rather than a procurement contract under federal acquisition regulations. There are no applicable FAR clauses, payment office details, accounting codes, invoicing systems, or contractual evaluation factors included, since the document functions solely as a state-mandated permit for streambed alteration. The signing date was August 4, 2025, and the notice was posted on August 7, 2025. No amendment number is indicated beyond the “R4” revision suffix in the agreement identifier, and there are no referenced attachments, performance schedules, FOB terms, or packaging requirements. All activities are confined to the described location and must adhere strictly to the conditions of the issued agreement.

General Info

Replacement of water intake structure with new pipe and pump at Youd Road, Merced County, under state environmental permit.

Agency

California → Fish and Wildlife, Region 4 - Central, Fresno

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Youd Road, CA

Set-Aside

NONE

Documents

(1)

MER-49127 SAA Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 4 - Central, Fresno
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 4 - Central, Fresno
Office AddressN/A
Contacts
Rodney RatzlaffSales Manager
Jackson PowellEnvironmental Scientist

Full Description

Show more
The California Department of Fish and Wildlife has executed Streambed Alteration Agreement No. EPIMS-MER-49127-R4, pursuant to Section 1602 of the Fish and Game Code to the applicant, Rodney Ratzlaff. The Project includes activities related to the installation and operation of an intake pipe and electric pump to replace the existing water intake point of diversion.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations