Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Guadalupe River Behind Tonino Drive Encroachment Remediation

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Santa Clara Valley Water District is managing the Guadalupe River Behind Tonino Drive Encroachment Remediation project in San Jose, California. The project focuses on remediating encroachments on Valley Water fee title properties, specifically APN 458-17-004 and 458-17-003, located along the Guadalupe Creek Trail. The scope of work involves the removal of various non-riparian vegetation, including succulents, vines, and shrubs, as well as 19 trees ranging from 3 to 12 inches in diameter. Tree stumps and roots will remain in place. The project is classified as a forecast and is exempt under CEQA Guidelines Section 15304 for minor alterations to land. Operational activities are scheduled to be completed in approximately two business days, with work occurring Monday through Friday between 7 a.m. and 7 p.m. Access to the site will be via Branham Lane, and all staging will be confined to the fee title properties. Equipment utilized will include excavators, skid steers, trash compactors, and flatbed trucks. The project will adhere to Valley Water's standard Best Management Practices to minimize environmental disturbance. Lawrence Truong serves as the primary point of contact for the lead agency.

General Info

Remove non-riparian vegetation and 19 trees from Valley Water properties along Guadalupe Creek Trail, internal agency effort.

Agency

California → Santa Clara Valley Water District

Place of Performance

Branham Lane, San Jose, CA, 95136

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Clara Valley Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Santa Clara Valley Water District
Office AddressN/A

Full Description

Show more
The Project involves the removal of non-riparian vegetation (Morning glory vines, bitter cherry shrub, Mexican palm, Yucca, Agave, bird of paradise, Japanese spindle, various succulents, Spanish broom brush, philodendron, Himalayan blackberry, and cactus) and 19 trees (fruit, privet, black walnut, and Chinese pistache) that range between 3- to 12-inch diameter at breast height on Valley Water fee title properties (APN 458-17-004 and 458-17-003) in the City of San Jose. The stump and roots of the trees would remain in place. The Project site is beyond top of bank along Guadalupe Creek Trail with non-riparian vegetation and trees. Valley Water’s standard Best Management Practices (BMPs) would be incorporated into the Project. The purpose of the Project is to remediate encroachments by removing stored items and planted vegetation from Valley Water fee title properties. Construction vehicles and equipment would include an excavator, skid steer, trash compactor, flatbed truck, crew truck, and hand tools. Construction vehicles and equipment would access the site via Branham Lane. Staging would be confined to the Project site on Valley Water fee title properties (APN 458-17-004 and 458-17-003). Work would only occur Monday through Friday between 7 a.m. and 7 p.m. The Project would be completed in approximately two (2) business days

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 22 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

1 day ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS