Pipe Replacement along Paradise Cut Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Pipe Replacement along Paradise Cut Project, identified as solicitation WA2025068, is a minor alteration project managed by the Central Valley Flood Protection Board. The scope of work involves the in-kind replacement of a 14-inch drainage pipe at Levee Mile 1.51 on the right bank in San Joaquin County, California. Key requirements include maintaining a minimum of two feet of cover from the pipe crown to the levee crown, utilizing controlled low-strength material for backfilling and compaction, and restoring the levee crown roadway to its original condition. Additionally, the project requires the complete removal of an unpermitted 10-inch temporary plastic pipe that runs parallel to the primary drainage pipe. All construction and excavation activities must comply with California Code of Regulations, Title 23, Waters, Division 1 standards. The project is exempt from the California Environmental Quality Act (CEQA) under statutory exemption 15282(k) and categorical exemptions 15301, 15302, and 15304, as it consists of minor repairs and maintenance of existing facilities without expanding their use. The project is supported by Board Permit 6403 and is coordinated through the Central Valley Flood Protection Board and MBK Engineers. Performance is centered at the project site in San Joaquin County, with Jordan Robbins and Michael Moncrief serving as the primary points of contact.

General Info

Replace 14-inch drainage pipe on Paradise Cut levee, remove unauthorized 10-inch pipe, restore levee crown under Board Permit 6403.

Agency

California → Central Valley Flood Protection Board

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption WA2025068 - Pipe Replacement Paradise Cut

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Central Valley Flood Protection Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → Central Valley Flood Protection Board
Office AddressN/A
Contacts
Jordan RobbinsSenior Environmental Scientist (Specialist)
Michael MoncriefProfessional Engineer

Full Description

Show more
To excavate and replace an existing 14-inch pipe in-kind, placing a minimum of two feet of cover from the pipe crown to the levee crown, backfilling and compacting the levee excavations with controlled low-strength material, and restoring the levee crown roadway to pre-project conditions. The work will also include removing an existing unpermitted temporary 10-inch plastic pipe that connects to and runs parallel with the existing 14-inch drainage pipe. The excavations will be backfilled and compacted in compliance with California Code of Regulations, Title 23, Waters, Division 1 (Title 23) standards. The facilities were authorized by Board Permit 6403, issued on February 27, 1969.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Mayo Park - Pond Creek Bank Improvements
Solicitation # 26-058
The Mayo Park Pond Creek Bank Improvements project is a construction effort by Santa Rosa County, Florida, designed to remedy severe creek bank erosion and enhance storm resiliency. The scope of work involves the excavation of unsuitable materials and the stabilization of approximately 100 linear feet of streambank using natural materials, including logs, tree limbs, stone, select fill, and native plantings. The project also includes an optional component, Bid Alternate A, which covers the repair of a damaged seawall along the western shore of the creek. All work must adhere to Santa Rosa County and FDOT standards, with technical oversight provided by Mott MacDonald. The contract is structured as a lump sum agreement with a substantial completion deadline of 120 calendar days and final completion within 150 calendar days from the notice to proceed. Financial terms include a 5% retainage on payments and liquidated damages of 1,685 dollars per day for delays. Bidders must provide a bid guarantee of 5% of the total price, and performance and payment bonds are required for contracts exceeding 200,000 dollars. The project is subject to various federal and state regulations, including the Build America, Buy America Act, the Davis-Bacon Act for prevailing wages, and Florida Statutes Chapter 119 regarding public records. A reimbursement agreement with the Florida Fish and Wildlife Conservation Commission provides a maximum compensation limit of 375,000 dollars for the stabilization efforts.
Engineering

POSTED

about 12 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated construction magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include site access construction, demolition, clearing and grubbing, excavation, and the placement of embankment, geotextiles, and stone, as well as turf establishment and maintenance. Bids are due by 10:00 a.m. on October 19, 2026, with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on the provided unit prices, provided the bid is reasonable and balanced. The contractor must adhere to USACE EM 385-1-1 (2024) safety standards and FHWA MUTCD guidelines. Notable contract requirements include the use of approved testing laboratories, compliance with the Davis-Bacon Act, and the provision of performance and payment bonds. Liquidated damages for delays are set at $4,295.00 per calendar day. Performance begins following the approval of an Accident Prevention Plan and Contractor Quality Control Plan, with a preliminary project schedule due within 15 days of the Notice to Proceed.
W07V Endist New Orleans

POSTED

about 13 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS