Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Stonebriar Drive Pond Leveler Installation Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Stonebriar Drive Pond Leveler Installation Project, managed by the El Dorado County Resource Conservation District, involves the installation of two pond leveler flow devices in existing beaver ponds and dams within El Dorado Hills, California. The project aims to facilitate human and beaver coexistence by stabilizing pond elevations to protect nearby infrastructure from flooding while preserving the aquatic habitat and the instinctual damming behavior of resident beavers. Each system consists of an intake cage and a 12-inch diameter pipe connected to the dam crest, utilizing t-post supports and concrete ballast. To minimize environmental impact, all work is performed using hand tools and foot traffic, with materials camouflaged to blend into the natural surroundings. The project is categorized as a forecast with a posted date of August 5, 2025, and is located in the 95762 ZIP code area. It has been granted a Notice of Exemption under CEQA Class 4 for minor alterations to land and has been determined by the Central Valley Regional Water Quality Control Board to not require a Clean Water Act Section 401 Water Quality Certification or waste discharge requirements. While the project follows best management practices for erosion and sediment control, there are no specified contract values, formal FAR clauses, or complex procurement evaluation factors provided in the documentation. Primary project coordination is handled by District Manager Mark Egbert and Connected Ecology.

General Info

Install two pond levelers in beaver dams using hand tools, no permits needed, environmental protection required.

Agency

California → El Dorado County Resource Conservation District

Place of Performance

Stonebriar Drive, CA, 95762

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → El Dorado County Resource Conservation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → El Dorado County Resource Conservation District
Office AddressN/A

Full Description

Show more
The Stonebriar Drive Pond Leveler Installation project will install two pond leveler flow devices in existing beaver ponds and dams on a small drainage. Pond leveler devices facilitate human/beaver coexistence by maintaining a pond height required by humans to protect nearby infrastructure while not interrupting the instinctual damming behavior of resident beavers. Pond leveler devices consist of an intake cage and connected pipe running from the intake cage which is settled into the pond, to the crest of the beaver dam downstream. Installation is accomplished using hand tools and foot traffic. This work stabilizes the elevation of the pond upstream of the beaver dam and sustains the aquatic habitat that would otherwise be lost if the humans concerned about the flooding of nearby infrastructure were to obtain a depredation permit and remove the offending beavers.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 22 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

1 day ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS