Jackisch Water Diversion and Reservoir Spillway Improvements Project (Notification of Lake or Streambed Alteration, No. EPIMS-MEN-32979-R1C)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS-MEN-32979-R1C with Scott Jackisch for the Jackisch Water Diversion and Reservoir Spillway Improvements Project in Willits, California. Pursuant to Section 1602 of the Fish and Game Code and Small Domestic Use Registration No. D033333, the project is limited to two encroachments for domestic use. The first involves the operation, maintenance, and modification of water diversion infrastructure from a horizontal well spring. The second involves water diversion from an onstream pond for domestic use and irrigation, including the installation of bypass infrastructure and spillway improvements. These improvements consist of excavation, the removal of a 24-inch diameter culvert, and the installation of an upgraded spillway with specific rock sizing and armoring to mitigate downstream erosion below a footbridge. The project is classified as a forecast with NAICS code 237990 and is granted a Class 1 Categorical Exemption under California Code of Regulations title 14, section 15301, as it involves the maintenance of private structures without expanding existing use. Regulatory oversight is provided by the California Department of Fish and Wildlife, Region 1, with Environmental Scientist Jessica Ryan serving as the primary point of contact. While the project is listed with a posted date of August 4, 2025, there are no specified contract values, formal procurement clauses, or defined periods of performance provided in the documentation.

General Info

Scott Jackisch authorized to divert water for domestic and irrigation use with infrastructure upgrades under state environmental permit.

Agency

California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

approximately 6.65 miles northwest of the town of Willits, Willits, CA

Set-Aside

NONE

Documents

(1)

EPIMS-MEN-32979-R1C Notice of Exemption for Jackisch Water Diversion Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A
Contacts
Jessica RyanEnvironmental Scientist
Scott JackischJessica Ryan - CDFW Environmental Scientist

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-MEN-32979-R1C, pursuant to Section 1602 of the Fish and Game Code to Scott Jackisch. The Project is limited to two (2) encroachments associated with Small Domestic Use (SDU) Registration No. D033333. The first encroachment is for water diversion from a horizontal well (spring) for domestic use. Work will include operation and maintenance of the water diversion infrastructure, and modifications as needed to comply with the terms of this Agreement. The second encroachment is for water diversion from an onstream pond (reservoir) for domestic use including irrigation, as well as improvements to the spillway, and bypass infrastructure installation as conditioned in SDU Registration No. D033333 to discharge water out of the reservoir for downstream resources. Work for the water diversion will include operation and maintenance of water diversion infrastructure, and modifications as needed to comply with the terms of this Agreement. Work for the spillway improvements will include excavation, removal of the existing 24- inch diameter culvert, installation of an upgraded spillway with appropriate rock sizing, and rock armoring as necessary to minimize erosion that shall extend below the footbridge to address the downstream erosion.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The U.S. Army Corps of Engineers Honolulu District is soliciting sealed bids for a firm-fixed-price contract to perform maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The scope of work includes the dredging and ocean disposal of approximately 4,260 cubic yards of material, vegetation clearance, and stone rework for the revetted mole. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone Small Businesses, who are eligible for a price evaluation preference. Bidders must submit physical sealed envelopes by the deadline, as electronic submissions are prohibited. Required documentation includes SF 1442, the CLIN schedule, representations and certifications, and a bid guarantee. The contractor must provide key personnel, including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Performance will be measured through pre- and post-dredge multi-beam surveys conducted by a third-party surveyor, and the contract includes liquidated damages of 2,297 dollars per calendar day of delay. Compliance with the Davis-Bacon Act and strict environmental and safety standards is required throughout the execution of the work.
Healy Tibbitts Builders, Inc.

POSTED

about 7 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Mayo Park - Pond Creek Bank Improvements
Solicitation # 26-058
The Mayo Park Pond Creek Bank Improvements project is a construction effort by Santa Rosa County, Florida, designed to remedy severe creek bank erosion and enhance storm resiliency. The scope of work involves the excavation of unsuitable materials and the stabilization of approximately 100 linear feet of streambank using natural materials, including logs, tree limbs, stone, select fill, and native plantings. The project also includes an optional component, Bid Alternate A, which covers the repair of a damaged seawall along the western shore of the creek. All work must adhere to Santa Rosa County and FDOT standards, with technical oversight provided by Mott MacDonald. The contract is structured as a lump sum agreement with a substantial completion deadline of 120 calendar days and final completion within 150 calendar days from the notice to proceed. Financial terms include a 5% retainage on payments and liquidated damages of 1,685 dollars per day for delays. Bidders must provide a bid guarantee of 5% of the total price, and performance and payment bonds are required for contracts exceeding 200,000 dollars. The project is subject to various federal and state regulations, including the Build America, Buy America Act, the Davis-Bacon Act for prevailing wages, and Florida Statutes Chapter 119 regarding public records. A reimbursement agreement with the Florida Fish and Wildlife Conservation Commission provides a maximum compensation limit of 375,000 dollars for the stabilization efforts.
Engineering

POSTED

about 10 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price construction contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include demolition, clearing and grubbing, excavation, placing embankment, installing separator geotextiles, placing graded stone, and turf establishment and maintenance. Bids are due by October 19, 2026, at 10:00 a.m., with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on unit prices, provided they are reasonable and balanced. The contractor must adhere to EM 385-1-1 safety standards and the Davis-Bacon Act for prevailing wages. Performance requirements include submitting a preliminary project schedule within 15 days and an initial schedule within 42 days of the Notice to Proceed. The contract includes liquidated damages of $4,295.00 per calendar day of delay and requires the use of approved testing laboratories for quality control. A project labor agreement is not required for this acquisition.
W07V Endist New Orleans

POSTED

about 11 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS