Stream Gage Installation Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project involves the installation of a single stream gage system in a creek bed in Northern California, specifically in the Red Bluff area, with work planned to occur during a one-week window of dry creek conditions to ensure no in-water activities take place. The installation includes driving two 2-inch diameter poles into the ground to support monitoring equipment and hand-excavating a 1.5-foot wide by 3-foot deep trench to lay a data transmission line to the river bottom, followed by restoration of the disturbed ground surfaces. The work is designed to have minimal environmental impact and is exempt under California Environmental Quality Act (CEQA) categorical exemptions 15303(d)(e), 15304(f), and 15306, which cover minor construction, small land alterations, and information collection activities respectively. No technical specifications, equipment standards, packaging requirements, or detailed delivery terms are specified, and the contract is classified as a forecast with no solicitation number or pricing data provided. The California Department of Water Resources is the overseeing agency, with Brian Humphrey listed as the primary point of contact, while Allison Tristao from Pixley Irrigation District serves as the project sponsor. No formal contracting officer, contracting officer’s representative, or technical representative roles are designated in the documentation. No FAR clauses, evaluation factors, payment details, invoicing procedures, accounting codes, or offeror certifications such as UEI, CAGE, or socioeconomic status are included. There is no defined contract type, delivery schedule beyond the one-week window, FOB terms, or submission requirements, indicating this is a preliminary forecast rather than a formal solicitation. Inspection and acceptance are implied to occur on-site by the agency, guided indirectly by the CEQA exemption criteria, and no attachments, special requirements, or contractual clauses beyond environmental compliance are documented.
General Info
Agency
NAICS
Place of Performance
Highway 43, CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
