Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Goleta Water District Barger Canyon Culvert Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Goleta Water District is planning to replace an undersized storm drain culvert beneath the Barger Reservoir access road in Goleta, California, and construct a retaining wall at the culvert inlet to improve stormwater flow and maintain safe access to the reservoir. The project is identified as a forecast notice with no formal solicitation or contract number, and it is currently in a pre-solicitation phase with no estimated contract value, pricing details, or specified period of performance. All work will occur at the project site located at Barger Reservoir Access Road in Santa Barbara County, with coordinates 34.465864°N, -119.747478°W. There is no indication of a formal contract type, payment terms, invoicing procedures, or accounting codes such as AAC, TAS, or ACRN, and no contracting officer, COR, or COTR has been officially designated. The primary point of contact is Daniel Brooks, Engineering & Infrastructure Manager, with additional administrative oversight provided by General Manager David Matson. The project qualifies for a CEQA categorical exemption under Section 15302(c) for replacement of existing utility facilities, indicating it is considered a routine maintenance activity with no significant environmental impact. However, no detailed specifications, inspection criteria, quality standards, or technical references such as ASTM or Caltrans standards are provided in the available documentation. There are no listed attachments, representations from offerors, socioeconomic certifications, or unique entity identifiers, and no formal instructions for proposal submission, deadlines, or evaluation factors have been released, suggesting this is an informational forecast rather than a fully developed procurement document.

General Info

Replace undersized storm drain culvert and build retaining wall at Barger Reservoir access road for improved drainage and access.

Agency

California → Goleta Water District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Goleta Water District Barger Canyon Culvert Replacement Project NOE

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Goleta Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Goleta Water District
Office AddressN/A
Contacts
Daniel BrooksEngineering & Infrastructure Manager

Full Description

Show more
Goleta Water District (District) plans to replace an undersized storm drain culvert, which runs beneath the Barger Reservoir access road, and construct a retaining wall at the culvert inlet.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details