Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Clara Expansion Park Rehabilitation Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Clara Expansion Park Rehabilitation Project in Cudahy, California, is a phased municipal initiative led by the City of Cudahy’s Department of Community Services to enhance recreational infrastructure within the park. Phase I includes the installation of a new pump and irrigation system, upgrades to gazebos, replacement of benches and picnic tables, updated exercise and playground equipment, resurfacing of basketball courts, and an upgrade to basketball lighting. Phase II introduces a synthetic turf soccer field, while Phase III entails comprehensive renovations to existing restroom facilities. All improvements are designed to serve approximately 16,121 residents within a half-mile radius, with work strictly contained within the park’s current boundaries and no expansion of public rights-of-way. The project is exempt from full environmental review under California Environmental Quality Act (CEQA) Class 2 and Class 3 exemptions, acknowledging it as a replacement or reconstruction of existing facilities and construction of small structures, respectively, while still requiring adherence to municipal codes and implied standards for accessibility, safety, and construction quality. The project is currently in a forecast stage, with no formal solicitation number, contract value, or line-item pricing established. There is no defined period of performance or delivery schedule, and no procurement clauses, contract administration roles, or invoicing protocols have been formally designated. The primary point of contact is Victor Santiago, Parks and Recreation Manager, who may serve as the functional liaison but has not been explicitly named as a COR, COTR, or PCO. The place of performance is clearly identified as Clara Expansion Park at multiple addresses along Clara and Elizabeth Streets in Cudahy, with APNs provided for land parcels. No packaging, marking, preservation, or federal certification requirements are specified, and no socioeconomic or small business status has been declared. All deliverables are to be inspected and accepted on-site by the City of Cudahy, with implementation responsibilities likely falling to the Los Angeles Neighborhood Land Trust as the designated project partner. While the project scope is well-defined, the absence of formal contract elements such as pricing, evaluation factors, or submission guidelines indicates this is a preliminary planning notice rather than a binding procurement document.

General Info

Clara Expansion Park in Cudahy to receive phased recreational upgrades including irrigation, playgrounds, turf field, and restrooms, serving 16,121 residents.

Agency

California → City of Cudahy

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Cudahy, CA, 90201

Set-Aside

NONE

Documents

(1)

Clara Expansion Park Rehabilitation Project NOE

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Cudahy
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Cudahy
Office AddressN/A
Contacts
Victor SantiagoParks and Recreation Manager

Full Description

Show more
Park Rehabilitation Project, with proposed phased construction implementation. Phase I improvements include new pump and irrigation, upgrade of gazebos, replacement of benches, replacement of picnic tables, replacement of exercise equipment, upgrade of playground equipment, resurfacing basketball courts/stripping and upgrade of basketball lights. Phase II improvements include the addition of a turf soccer field. Phase III improvements include the upgraded restroom facilities

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details