Voluntary Agreement Early Implementation for the Mokelumne River - Task #2 Water Diversion Screening

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves installing self-cleaning fish screens at three existing surface water diversions along the lower Mokelumne River in Thornton, California, with the primary objective of reducing the entrainment of juvenile anadromous fish into diversion channels while maintaining current water diversion operations. The initiative falls under a voluntary agreement and is classified as a minor maintenance and modification activity under California Environmental Quality Act (CEQA) Guidelines Sections 15301, 15302, and 15303, which exempt the project from further environmental review due to its lack of significant environmental impact and no expansion of water use or capacity. The work is led by the California Department of Water Resources, with East Bay Municipal Utility District serving as the implementing agency, and oversight is coordinated through the Division of Multibenefit Initiatives. Performance is confined to the specified location in San Joaquin County, with no additional delivery or shipping requirements identified. No formal contract value, pricing details, or funding lines such as TAS or ACRN are disclosed, and the contract type is listed as a forecast with no standard structure like FFP or CPFF specified. The solicitation was posted on July 31, 2025, with an inferred signing date of July 30, 2025, though no contract number or amendment history is provided. Key contacts include James Pearson, Fish Biologist at EBMUD, and Chad Fien, Environmental Program Manager II with the state agency, although their roles as COR, COTR, or PCO are not officially defined. There is no information on payment procedures, invoicing systems, inspection criteria, quality standards, packaging requirements, or special contractual provisions. Similarly, no offeror certifications, socioeconomic status disclosures, or evaluation factors for award are documented. Submissions related to environmental compliance, such as a certified exemption notice, are referenced but no detailed proposal format or deadlines are outlined, leaving the procurement process incomplete in terms of standard federal acquisition documentation.

General Info

Install self-cleaning fish screens at three Mokelumne River diversions to protect juvenile fish without expanding water use.

Agency

California Water Resources, Department of

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA, 95686

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Mokelumne River Fish Screen Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Water Resources, Department of
Contacts2 people available
OfficeN/A
Organization / Agency
California Water Resources, Department of
Office AddressN/A
Contacts
James PearsonFish Biologist
Chad FienEnvironmental Program Manager II

Full Description

Show more
The project consists of installation of self-cleaning fish screens to three existing surface water diversions in the lower Mokelumne River. The purpose of the project is to reduce entrainment of juvenile anadromous fish into water diversions within the lower Mokelumne River.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 7 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.