Parris Stream Crossings and Onstream Pond Water Diversion and Spillway Improvements Project (Notification of Lake or Streambed Alteration, No. EPIMS-MEN-22218-R

Forecast
EPIMS-MEN-22218-R1CState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has executed Lake or Streambed Alteration Agreement EPIMS-MEN-22218-R1C with Cole Parris for a project located in the Lower Eel watershed of Mendocino County. This environmental permit agreement, governed by Section 1602 of the Fish and Game Code, authorizes four specific encroachments designed to improve water quality and road drainage. The scope of work includes upgrading three stream crossings through the removal of existing culverts and the installation of properly sized replacements with backfilling and rock armoring. The fourth encroachment involves water diversion for cannabis irrigation from an onstream pond, which requires the removal of a 18-inch corrugated metal pipe and 120 cubic yards of embankment fill to construct a 110-foot rock-armored broad weir and 85 feet of stabilized downstream channel. The project is categorized as exempt under California Code of Regulations Title 14, sections 15301 and 15304, as it involves minor alterations without the removal of mature trees. Technical specifications follow a Pond Overflow plan prepared by Pope Engineering, requiring 6-inch median size armor rock for erosion control. Administrative oversight is provided by Environmental Scientist Jessica Ryan and Senior Environmental Scientist Supervisor Angela Liebenberg. While the project was posted on August 4, 2025, and signed on July 16, 2025, the documentation does not specify a total contract value, formal period of performance, or standard federal acquisition clauses, as it functions as a state-level environmental agreement rather than a traditional federal procurement contract.

General Info

Cole Parris permitted to upgrade stream crossings and install water diversion for cannabis irrigation in Mendocino County.

Agency

California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

Place of Performance

approximately 12 miles north of the town of Laytonville, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake or Streambed Alteration Agreement EPIMS Notification No. EPIMS-MEN-22218-R1C, pursuant to Section 1602 of the Fish and Game Code to Cole Parris. The project is limited to four (4) encroachments. The first three (3) encroachments are to upgrade existing stream crossings. Work for these encroachments will include excavation, removal of the existing culverts, replacement with new properly sized culverts, backfilling and compaction of fill, and rock armoring as necessary to minimize erosion. The fourth encroachment is for water diversion for cannabis irrigation from an onstream pond that includes improvements to the overflow spillway in accordance with the Pond Overflow plan sheet prepared by Pope Engineering. Work for the water diversion will include use, maintenance and modification of the water diversion infrastructure consistent with this Agreement. Work for the spillway improvements will include removal of the existing 18-inch diameter corrugated metal pipe (CMP) and roughly 120 cubic yards (CY) of pond embankment fill material, construction of a broad weir approximately 110 feet in length that will be armored with approximately 16 CY of rock with a median size of 6-inches to convey pond overflows to the downstream stream course, and placement of approximately 9 CY of rock with a median size of 6-inches below the rockarmored weir, along the channel and banks of the stream course for a distance of roughly 85 feet, to address the erosion below the pond.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 22 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

1 day ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS