Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Tahoe Keys Marina Dock Replacement Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Tahoe Keys Marina Dock Replacement Project involves the comprehensive upgrade of potable water, fire protection, and electrical systems at four marina locations in South Lake Tahoe to comply with current safety standards while safeguarding the surrounding environment. ADA accessibility enhancements will be implemented through the installation of new gangways and landings, ensuring compliance without encroaching on protected aquatic areas. The work will begin with the removal of existing in-water piles and docks using a barge and crane, starting from the southern end of the lagoon and advancing northward. New dock sections will be prefabricated on land, then transported and carefully lowered into position, with installation proceeding from north to south to maintain operational continuity and minimize disruption. Following dock placement, utility connections for water, fire protection, and electrical systems will be completed to ensure full functionality and regulatory compliance. The project is being managed by the Regional Water Quality Control Board, Region 6 – South Lake Tahoe, with Jennifer Callahan, Environmental Scientist, serving as the primary point of contact. All activities are designed to meet environmental protection standards, preserve water quality, and avoid impact to sensitive ecosystems in the region. The project is publicly forecasted with a posting date of August 4, 2025, and is located within the 96150 zip code in South Lake Tahoe, California.

General Info

Replace marina docks and utilities in South Lake Tahoe with ADA upgrades, environmental protection, and phased installation.

Agency

California → Regional Water Quality Control Board, Region 6 - South Lake Tahoe

Place of Performance

South Lake Tahoe, CA, 96150

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 6 - South Lake Tahoe
Contacts1 person available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 6 - South Lake Tahoe
Office AddressN/A

Full Description

Show more
This project aims to upgrade potable water, fire protection, and electrical systems to meet modern safety codes while ensuring minimal environmental impact. ADA accessibility improvements, including new gangways and landings, will be installed at four marina locations without affecting protected waters. Existing in-water piles and docks will be removed using a barge and crane, starting from the southern part of the lagoon and progressing north. New dock sections will then be installed, first on land and then lowered into the water for final placement. The dock installation will proceed north to south, followed by utility connections.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 22 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

1 day ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS