Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Jackson Retention Basin

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Indio is forecasting a civil infrastructure project to construct the Jackson Retention Basin at the northwest corner of Jackson Street and Kenner Avenue in Indio, California. The project aims to mitigate street flooding caused by a blocked drainage pipe and provide a discharge location for the Indio Water Authority's Well BB flush system. The basin will feature a storage volume of 1.74 acre-feet to accommodate a 10-year, 3-hour storm event, a basin bottom depth ranging from 5 to 5.7 feet with a 0.4 percent slope, and a drywell to enhance percolation and reduce drawdown time. Additional construction includes a new catch basin to handle runoff from the Jackson Street and Kenner Avenue intersection and a 6-foot wide, 3-inch thick Class II maintenance access path. The project is categorized as a forecast under NAICS code 237990 and is managed by the City of Indio Public Works Department, with Principal Civil Engineer Donn Uyeno serving as the primary point of contact. It is categorically exempt from the California Environmental Quality Act under Guidelines 15301(f) and 15303, as it involves minor alterations and the construction of small drainage structures. All existing site infrastructure, including utilities, trees, and fire hydrants, must be protected in place. No specific contract value, performance period, or federal acquisition regulation clauses have been established, as the current documentation serves as a project forecast and environmental notice of exemption.

General Info

Jackson Retention Basin in Indio, CA, to manage stormwater with 1.74 acre-feet capacity and new drywell, catch basin, and access path.

Agency

California → City of Indio

Place of Performance

Jackson Street and Kenner Street, Indio, CA, 92201

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Indio
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Indio
Office AddressN/A

Full Description

Show more
The proposed project retention basin will have a storage volume of 1.74 acre-feet, which is sufficient to accommodate the runoff generated by any storm events, up to and including a 10-year, 3-hour storm event. The basin will be surrounded by a 6-foot wide 3-inch thick Class II maintenance access path. The retention basin is proposed to have a 0.4 percent slope on the basin bottom, ranging from 5 feet in depth at the southern end to 5.7 feet in depth at the northern end. A drywell will be located to enhance percolation and reduce drawdown time. A new catch basin will be installed to handle runoff from the Jackson Street/Kenner Avenue intersection, as the existing southerly catch basin cannot drain to the proposed retention basin due to nearby traffic pull boxes. Existing trees, fence, power pole, water meter, guard post, valve, fire hydrant, utilities, curb and gutter, catch basin, and existing sidewalk will be protected in place.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 22 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

1 day ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS