Francis Creek Restoration Phase I

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Francis Creek Restoration Phase I project involves installing up to 10,000 feet of wildlife-friendly riparian exclusion fencing on private agricultural lands in Humboldt County, California, specifically near Ferndale, to protect the lower Salt River watershed. The initiative aims to enhance riparian health by preventing livestock access to sensitive waterways, thereby reducing sediment and nutrient runoff into the creek system. The project is classified as a minor agricultural alteration and qualifies for a categorical exemption under CEQA Section 15304, meaning it has been determined to have no significant environmental impact and does not require a full environmental review. The Humboldt County Resource Conservation District is the lead agency, with Jill Demers, the Executive Director, serving as the primary point of contact for coordination and oversight. No formal solicitation number, contract value, pricing data, or competitive procurement process is associated with this effort, indicating it is likely funded through state or local environmental programs rather than federal acquisition channels. There is no indication of federal contract clauses, award evaluation factors, invoicing procedures, payment details, or technical specifications beyond the scope of CEQA compliance. The project lacks documented requirements for packaging, marking, inspection criteria, quality standards, or contractor certifications such as UEI or CAGE codes. The place of performance is clearly identified as 1660 Eugene Street, Ferndale, CA 95536, and while the district may perform oversight functions, no formal Contracting Officer’s Representative or technical acceptance protocols are outlined. The absence of procurement mechanisms like LPTA or trade-off evaluations, combined with the reliance on a state environmental exemption, underscores the project’s nature as a locally managed conservation action rather than a federally regulated acquisition. All activities are centered on achieving improved water quality outcomes through physical fencing installation, with no additional deliverables, performance milestones, or contractual options defined.

General Info

Install up to 10,000 feet of fencing to protect riparian areas in Humboldt County under CEQA exemption.

Agency

California → Humboldt County Resource Conservation District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

1660 Eugene Street, CA, 95536

Set-Aside

NONE

Documents

(1)

Francis Creek Restoration Phase I Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Humboldt County Resource Conservation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Humboldt County Resource Conservation District
Office AddressN/A
Contacts
Jill DemersExecutive Director

Full Description

Show more
The Project is designed to protect waterways by establishing wildlife-friendly riparian exclusion fencing. The project occurs on private property and is located on established agricultural grazing land in Humboldt County. The project involves installing up to 10,000 feet of Riparian Exclusion fencing to support riparian health and decrease sediment and nutrient loads to the lower Salt River watershed.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details