AI Contract Overview

Show more

The Lincoln Regional Airport Runway Reconstruction project involves the complete overhaul of Runway 15-33, a 6,001-foot asset, through the removal of existing asphalt, recompaction of the underlying aggregate base, and installation of new aggregate and asphalt surfaces. In addition to the runway itself, the scope includes regrading the surrounding runway safety areas to meet current safety standards, eliminating a obstructive rise adjacent to the runway, replacing two Precision Approach Path Indicators, and upgrading the approach lighting system by substituting the existing Medium Intensity Approach Lighting System with a Runway Alignment Indicator Lights configuration. All work must align with FAA and California Department of Transportation standards for airfield infrastructure, particularly regarding pavement design and lighting system functionality. The project is being managed by the City of Lincoln as the lead agency, with the work location firmly established at 1480 Flightline Drive, Lincoln, California, 95648. While environmental compliance under CEQA has been confirmed through a Negative Declaration, no formal contract value, pricing structure, or detailed financial data is available in the provided information. The project timeline lacks specific start or end dates, and no procurement solicitation number, contract type, or binding award documentation has been disclosed beyond a posted forecast date of August 5, 2025, and an administrative approval date of July 8, 2025. The City of Lincoln serves as both the contracting authority and oversight entity, with Roland Neufeld, Senior Engineer, designated as the primary point of contact for inquiries. No contract clauses from the Federal Acquisition Regulation, formal evaluation criteria, payment or invoicing protocols, contracting officer appointments, or offeror representations and certifications have been included or identified in the available documentation, suggesting that the materials provided are preliminary or informational in nature rather than a complete contractual package. No attachments, packaging specifications, or special requirements such as security clearances, delivery terms, or submission protocols have been detailed, leaving key logistical and procedural elements undetermined for prospective bidders.

General Info

Lincoln Airport to reconstruct Runway 15-33, upgrade lighting and safety areas per FAA and Caltrans standards.

Agency

California → City of Lincoln

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Flight Line Drive/Aviation Blvd, Lincoln, CA, 95648

Set-Aside

NONE

Documents

(1)

Notice of Determination - Lincoln Regional Airport Runway Reconstruction

PDFdetermination-and-findings

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Lincoln
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Lincoln
Office AddressN/A
Contacts
Roland NeufeldSenior Engineer

Full Description

Show more
The project proposes to reconstruct Runway 15-33, which extends 6,001 feet, by removing existing asphalt, recompacting the aggregate base, and adding new aggregate base and asphalt. It also proposes to regrade the runway safety areas (RSA) surrounding Runway 15-33, replace two Precision Approach Path Indicators (PAPIs) and an existing Medium Intensity Approach Lighting System with Runway Alignment Indicator Lights (MALSR), and removing a small rise adjacent to the runway.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details