Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Minor Alteration No. WA2025036 Sherman Island Emergency Levee Repair

Forecast
WA2025036State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Minor Alteration No. WA2025036 is an emergency levee repair project on Sherman Island in Sacramento County, California, managed by the Central Valley Flood Protection Board and carried out by Reclamation District 341. The project involves the replacement of approximately 893 linear feet of Class II Rock Slope Protection on the waterside levee slope of the Sacramento River. This work is distributed across 13 locations between levee miles 6.88 and 9.27 to restore structural integrity and erosion protection following damage caused by the 2024 storm event. The project is designated as a forecast and is exempt from the California Environmental Quality Act under statutory exemption 14 CCR Section 15269 for emergency repairs and categorical exemption 14 CCR Section 15301 for minor alterations to existing facilities. Key points of contact include Angela Nguyen-Tan of the Central Valley Flood Protection Board and Project Engineer Martin Berber of WBECorp. The scope is limited to restoring the levee to pre-event conditions with no expansion of use or capacity. No specific contract value, FAR clauses, or formal evaluation factors were provided in the documentation.

General Info

Emergency repair of 893 linear feet of damaged rock slope protection on Sacramento River levee in California under CEQA exemptions.

Agency

California → Central Valley Flood Protection Board

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Central Valley Flood Protection Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → Central Valley Flood Protection Board
Office AddressN/A

Full Description

Show more
To authorize approximately 893 linear feet of existing Class II Rock Slope Protection (RSP) on the waterside levee slope, along the Sacramento River, at 13 locations from levee mile 6.88 to 9.27. The RSP was replaced following the removal of the existing RSP from the 2024 storm event.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 22 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

1 day ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine