Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

SAN LORENZO CREEK (ZONE 2, LINE B) CONCRETE CHANNEL REPAIR DOWNSTREAM OF WASHINGTON AVENUE, IN SAN LEANDRO AND SAN LORENZO.

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Alameda County Flood Control and Water Conservation District is preparing to address severe structural damage to a 350-foot segment of the concrete-lined San Lorenzo Creek channel downstream of Washington Avenue in San Leandro and San Lorenzo, caused by leaks from an underlying 6-inch PG&E gas line and a 12-inch EBMUD water line. These leaks led to uplift of the channel invert, longitudinal cracking, and erosion beneath the concrete, resulting in voids and a sinkhole that compromise the integrity of the channel walls and flood control functionality. Temporary stabilization measures are scheduled for summer 2025 and will include grout injection to fill subsurface voids, sealing of cracks, and installation of temporary steel bracing or sheet piles with tie rods to reinforce the channel walls. These efforts aim to prevent further degradation until permanent reconstruction can be completed during the dry season window of mid-April to mid-October 2026. Both phases require temporary cofferdams upstream and downstream to divert streamflow during construction. The reconstruction will restore the channel to its original U.S. Army Corps of Engineers design while incorporating current engineering standards. Utility line investigations and potential repairs or replacements by PG&E and EBMUD are expected to coincide with the channel reconstruction to minimize disruption. Upon completion, cofferdams will be removed and natural creek flow restored, ensuring continued flood protection for the surrounding communities.

General Info

Temporary stabilization in 2025, permanent repair in 2026 for damaged creek channel due to utility leaks.

Agency

California → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland
Contacts1 person available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland
Office AddressN/A

Full Description

Show more
The Alameda County Flood Control and Water Conservation District {District} owns and maintains San Lorenzo Creek between San Francisco Bay and Foothill Blvd. in San Leandro, San Lorenzo and Hayward, that was constructed by the U.S. Army Corps of Engineers (Corps). On 12/29/2024, the concrete portion of San Lorenzo Creek just downstream of Washington Avenue suffered severe damage and distress due to the high pressure 6" PG&E gas line and 12" EBMUD water line leaks. These leaks caused uplift of the channel invert and longitudinal cracking, leading to piping erosion of soil beneath the concrete channel and behind the concrete channel walls, creating voids and a sinkhole. The concrete channel invert serves as the footing for the channel retaining walls and its continuing functionality and serviceability are crucial for flood control. The District completed preliminary site evaluations and proposes to perform temporary stabilization measures in summer 2025 including low-strength grout injection through the concrete channel invert to fill voids below, sealing and filling of the cracks in the concrete channel slab, installing temporary steel bracing system just above the top of channel walls, or sheet piles/cast-in-drilled piles behind the channel walls with tie rods to the walls. Permanent reconstruction of about 350' of the damaged portion of the channel would require full construction window in summer 2026 between mid-April and mid-October. Both temporary and permanent work will require placement of temporary cofferdams upstream and downstream of the proposed work to bypass nuisance flow in the channel during the dry season. Since PG&E and EBMUD lines also cross under the concrete lined channel, it is likely that the investigative work, repairs and/or replacements of these utility lines may occur the same time as channel reconstruction of the concrete channel. The project limits are about 350' from Washington Avenue crossing going downstream in San Lorenzo and San Leandro. Once the project is completed, the cofferdams will be removed, and the natural flow of the creek will be restored. The primary goal of the project is to temporarily stabilize the failed concrete line channel bottom and walls first in summer 2025, and then reconstruct the concrete lined channel in summer 2026 to the original U.S. Army Corps of Engineer's design, with incorporation of current design criteria, and restore flood control protection for the surrounding community.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
RFI-TOM-LOG26_01_Mise en place de répertoire de prestataires en BTP dans la Région de Tombouctou Cheick Abdoul Kader THERA - [email hidden]
Solicitation # RFI-TOM-LOG26_01
The International Organization for Migration (IOM) has issued Request for Information RFI-TOM-LOG26_01 to establish a directory of qualified Building and Public Works (BTP) service providers in the Tombouctou and Taoudenit regions of Mali. This prequalification process aims to identify capable suppliers for future competitive bidding across three primary categories: building construction and rehabilitation, drinking water supply system construction and rehabilitation, and the construction and rehabilitation of roads and annexed works such as bridges and culverts. As this is a pre-solicitation phase, pricing is not requested at this stage. Eligible bidders must be physically present in Tombouctou with their own facilities and must not be on the United Nations ineligibility list. Technical requirements include a minimum of five years of continuous activity in the BTP sector and the completion of at least two similar projects in Mali between October 2020 and October 2026. Financial capacity is evaluated based on cumulative revenue for 2023 through 2025, with providers categorized into three tiers based on thresholds of 60 million and 200 million XOF. Required documentation includes commercial registration, taxpayer cards, CNPS registration, and certified financial statements. Submissions must be delivered to the IOM Sub-Office in Tombouctou by November 24, 2026.
IOM

POSTED

about 22 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Tri Village Park Pier Construction (Choctaw Beach Fishing Pier)
Solicitation # 27-01
Walton County is soliciting bids for the construction of the Tri Village Park Pier, also known as the Choctaw Beach Fishing Pier, as part of a redevelopment project of a former fire station site on Choctawhatchee Bay. The scope of work requires the contractor to provide all labor, materials, and equipment to construct an ADA-accessible fishing pier and kayak launch in strict accordance with the April 29, 2026, construction plans. Other park improvements, such as parking, grading, and demolition, are excluded from this solicitation as they will be handled by County forces. The project must begin within ten business days of the Notice to Proceed, with substantial completion required within 120 calendar days and final completion within 30 days of the issuance of a punch list. The contract will be awarded to the responsible and responsive bidder who submits the lowest lump sum bid, with preference given to businesses maintaining a drug-free workplace program in the event of a tie. Bidders must submit their proposals via the e-Procurement Portal by December 10, 2026, and must include a notarized bid form, a declaration of subcontractors and suppliers, and a completed public entity crimes statement. The successful contractor is required to provide performance and payment bonds equal to the contract price and must adhere to Florida Prompt Payment Act standards and FDOT specifications for layout. The contractor maintains sole responsibility for construction methods, employee safety, and the protection of property throughout the project duration.
Engineering

POSTED

1 day ago

DEADLINE

in 29 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS