Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

SAN LORENZO CREEK (ZONE 2, LINE B) CONCRETE CHANNEL REPAIR DOWNSTREAM OF WASHINGTON AVENUE, IN SAN LEANDRO AND SAN LORENZO.

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Alameda County Flood Control and Water Conservation District is preparing to address severe structural damage to a 350-foot segment of the concrete-lined San Lorenzo Creek channel downstream of Washington Avenue in San Leandro and San Lorenzo, caused by leaks from an underlying 6-inch PG&E gas line and a 12-inch EBMUD water line. These leaks led to uplift of the channel invert, longitudinal cracking, and erosion beneath the concrete, resulting in voids and a sinkhole that compromise the integrity of the channel walls and flood control functionality. Temporary stabilization measures are scheduled for summer 2025 and will include grout injection to fill subsurface voids, sealing of cracks, and installation of temporary steel bracing or sheet piles with tie rods to reinforce the channel walls. These efforts aim to prevent further degradation until permanent reconstruction can be completed during the dry season window of mid-April to mid-October 2026. Both phases require temporary cofferdams upstream and downstream to divert streamflow during construction. The reconstruction will restore the channel to its original U.S. Army Corps of Engineers design while incorporating current engineering standards. Utility line investigations and potential repairs or replacements by PG&E and EBMUD are expected to coincide with the channel reconstruction to minimize disruption. Upon completion, cofferdams will be removed and natural creek flow restored, ensuring continued flood protection for the surrounding communities.

General Info

Temporary stabilization in 2025, permanent repair in 2026 for damaged creek channel due to utility leaks.

Agency

California → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland
Contacts1 person available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland
Office AddressN/A
Contacts
Nathaniel GoetzWater Resource Control Engineer

Full Description

Show more
The Alameda County Flood Control and Water Conservation District {District} owns and maintains San Lorenzo Creek between San Francisco Bay and Foothill Blvd. in San Leandro, San Lorenzo and Hayward, that was constructed by the U.S. Army Corps of Engineers (Corps). On 12/29/2024, the concrete portion of San Lorenzo Creek just downstream of Washington Avenue suffered severe damage and distress due to the high pressure 6" PG&E gas line and 12" EBMUD water line leaks. These leaks caused uplift of the channel invert and longitudinal cracking, leading to piping erosion of soil beneath the concrete channel and behind the concrete channel walls, creating voids and a sinkhole. The concrete channel invert serves as the footing for the channel retaining walls and its continuing functionality and serviceability are crucial for flood control. The District completed preliminary site evaluations and proposes to perform temporary stabilization measures in summer 2025 including low-strength grout injection through the concrete channel invert to fill voids below, sealing and filling of the cracks in the concrete channel slab, installing temporary steel bracing system just above the top of channel walls, or sheet piles/cast-in-drilled piles behind the channel walls with tie rods to the walls. Permanent reconstruction of about 350' of the damaged portion of the channel would require full construction window in summer 2026 between mid-April and mid-October. Both temporary and permanent work will require placement of temporary cofferdams upstream and downstream of the proposed work to bypass nuisance flow in the channel during the dry season. Since PG&E and EBMUD lines also cross under the concrete lined channel, it is likely that the investigative work, repairs and/or replacements of these utility lines may occur the same time as channel reconstruction of the concrete channel. The project limits are about 350' from Washington Avenue crossing going downstream in San Lorenzo and San Leandro. Once the project is completed, the cofferdams will be removed, and the natural flow of the creek will be restored. The primary goal of the project is to temporarily stabilize the failed concrete line channel bottom and walls first in summer 2025, and then reconstruct the concrete lined channel in summer 2026 to the original U.S. Army Corps of Engineer's design, with incorporation of current design criteria, and restore flood control protection for the surrounding community.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
Mayo Park - Pond Creek Bank Improvements
Solicitation # 26-058
The Mayo Park Pond Creek Bank Improvements project is a construction effort by Santa Rosa County, Florida, designed to remedy severe creek bank erosion and enhance storm resiliency. The scope of work involves the excavation of unsuitable materials and the stabilization of approximately 100 linear feet of streambank using natural materials, including logs, tree limbs, stone, select fill, and native plantings. The project also includes an optional component, Bid Alternate A, which covers the repair of a damaged seawall along the western shore of the creek. All work must adhere to Santa Rosa County and FDOT standards, with technical oversight provided by Mott MacDonald. The contract is structured as a lump sum agreement with a substantial completion deadline of 120 calendar days and final completion within 150 calendar days from the notice to proceed. Financial terms include a 5% retainage on payments and liquidated damages of 1,685 dollars per day for delays. Bidders must provide a bid guarantee of 5% of the total price, and performance and payment bonds are required for contracts exceeding 200,000 dollars. The project is subject to various federal and state regulations, including the Build America, Buy America Act, the Davis-Bacon Act for prevailing wages, and Florida Statutes Chapter 119 regarding public records. A reimbursement agreement with the Florida Fish and Wildlife Conservation Commission provides a maximum compensation limit of 375,000 dollars for the stabilization efforts.
Engineering

POSTED

about 12 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237990
New
Federal
LAKE PONTCHARTRAIN & VICINITY (LPV), FORESHORE RISK REDUCTION REPAIRS, REACH-1, 2, 3, & 4 Jefferson Parish, Louisiana (ED 24-006)
Solicitation # W912P826BA009
The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the Lake Pontchartrain and Vicinity (LPV) Foreshore Risk Reduction Repairs project in Jefferson Parish, Louisiana. This unrestricted, firm fixed-price contract, identified by solicitation number W912P826BA009 and NAICS code 237990, has an estimated construction magnitude between $25 million and $100 million. The scope of work involves repairing existing foreshore protection and embankments across Reaches 1, 2, 3, and 4. Key activities include site access construction, demolition, clearing and grubbing, excavation, and the placement of embankment, geotextiles, and stone, as well as turf establishment and maintenance. Bids are due by 10:00 a.m. on October 19, 2026, with a question cutoff of October 2, 2026. Award will be made as a whole to a single bidder based on the provided unit prices, provided the bid is reasonable and balanced. The contractor must adhere to USACE EM 385-1-1 (2024) safety standards and FHWA MUTCD guidelines. Notable contract requirements include the use of approved testing laboratories, compliance with the Davis-Bacon Act, and the provision of performance and payment bonds. Liquidated damages for delays are set at $4,295.00 per calendar day. Performance begins following the approval of an Accident Prevention Plan and Contractor Quality Control Plan, with a preliminary project schedule due within 15 days of the Notice to Proceed.
W07V Endist New Orleans

POSTED

about 13 hours ago

DEADLINE

in 28 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS