CALIFORNIA RED-LEGGED FROG HABITAT PROTECTION, - POND 1 SPILLWAY REPAIR AND CHANNEL RESTORATION

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Solano Transportation Authority is overseeing the California Red-Legged Frog Habitat Protection project at Vallejo Swett Ranch in Vallejo, California. The project focuses on the repair of the Pond 1 spillway and dam to prevent structural failure and protect critical breeding and rearing habitat for the endangered California Red-Legged Frog. The scope of work includes removing the deteriorated concrete spillway, rehabilitating the earth-fill dam, installing a 6-inch steel siphon for controlled drainage and bullfrog removal, and constructing an armored spillway with a stilling basin. Additionally, the project involves downstream channel restoration using rip-rap and geotextile fabric, planting native riparian vegetation, and installing wildlife-friendly fencing to exclude livestock. The total estimated project value is 500,000 dollars, with 230,000 dollars allocated for compliance, engineering, and permitting, and 270,000 dollars dedicated to a long-term conservation endowment. Performance is scheduled for a four-week window between September and mid-October to minimize environmental impact. The project is governed by a CEQA Class 33 Categorical Exemption and requires several regulatory approvals, including Clean Water Act Sections 404 and 401 permits, a Lake and Streambed Alteration Agreement from the California Department of Fish and Wildlife, and a major grading permit from Solano County. Solano Land Trust is identified as the party responsible for carrying out the restoration activities.

General Info

Repair Pond 1 at Vallejo Swett Ranch to protect endangered frogs, install spillway and siphon, plant native vegetation, fund conservation endowment.

Agency

California → Solano Transportation Authority

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Swett Ranch, Vallejo California, Vallejo, CA

Set-Aside

NONE

Documents

(1)

Pond 1 CEQA Notice of Exemption and Project Description

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Solano Transportation Authority
Contacts1 person available
OfficeN/A
Organization / Agency
California → Solano Transportation Authority
Office AddressN/A
Contacts
Nick BurtonDirector of Projects

Full Description

Show more
Pond 1, a historic pond on the Vallejo Swett property estimated to be built in the late 1940’s, is well documented as an important CRLF breading area. Pond 1 provides good quality breeding and rearing habitat, but is threatened by erosion of its spillway. Without repairs, the dam is likely to be breached during storms, and the pond would then be lost as CRLF breeding and rearing habitat. In addition, the eroded spillway has resulted in channel incision and loss of creek habitat downstream of the dam

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 4 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 16 hours ago

DEADLINE

in 24 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS