Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

City of Santa Maria Drainage Study

Active
RFP - Drainage StudyState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Santa Maria Public Works Engineering Department is soliciting proposals for professional engineering services to develop a Citywide Drainage Study and Flood Mitigation Master Plan. The project involves conducting watershed-based analysis, hydrologic and hydraulic modeling, and identifying infrastructure deficiencies to create cost-effective flood mitigation strategies. The selected consultant will be responsible for advancing a preferred alternative to a 10 percent conceptual design. All work must be performed under the responsible charge of a Professional Civil Engineer licensed in the State of California. The contract is intended to span 18 months, with proposals due by October 19, 2026, and a planned award date of November 17, 2026. The selection process is based on a 100-point evaluation system focusing on organization and approach, qualifications, staff availability, and past experience. Award is granted to the most qualified consultant at the City's sole discretion. Contractors must comply with California Labor Code requirements, including registration under section 1725.5, workers' compensation certification under section 3700, and adherence to prevailing wage rates. Payment is structured based on the conclusion of assigned tasks, with a restriction that total payments cannot exceed 90 percent of the not-to-exceed cost until the City accepts all final deliverables, which include a final master plan, GIS databases, and hydraulic models. The agreement is governed by the laws of the State of California with jurisdiction in Santa Barbara County.

General Info

Santa Maria seeks a licensed CA engineer for a citywide drainage and flood plan.

Place of Performance

110 S. Pine St. Suite 221 Santa Maria, California 93458, CA, USA

Set-Aside

NONE

Documents

(4)

City of Santa Maria Citywide Drainage Study and Flood Mitigation Master Plan RFP

PDF•55 pages•rfp

Map of Flood Prone Areas

PDF•1 page•specifications

Santa Maria General Plan Land Use Map

PDF•1 page•specifications

Santa Maria Valley Watersheds Facilities List

PDF•1 page•other

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
Posted

Contract opportunity posted

Notice updated

Response deadline changed from May 4, 2026 to Apr 8, 2026. The point of contact changed.

Notice updated

Response deadline changed from Apr 8, 2026 to Oct 19, 2026. The point of contact changed.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works Engineering Department of City of Santa Maria
Contacts1 person available
OfficeCA, USA

Full Description

Show more
Scope: Please see RFP document for scope of work.
Bid Bond: 0.00%

Similar Contracts

Same NAICS industry code

More opportunities from California → Public Works Engineering Department of City of Santa Maria

Same awarding agency

NAICS: 541330
SLED
PS&E for the ATP Cycle 6 - Active Santa Maria Safe Routes to School Corridor Improvements
Solicitation # RFP - ATP Cycle 6
The City of Santa Maria Public Works Engineering Department is soliciting professional engineering services for the final design and preparation of Plans, Specifications, and Estimate (PS&E) for the Active Transportation Program (ATP) Cycle 6 Active Santa Maria Safe Routes to School Corridor Improvements. The project focuses on enhancing safety, connectivity, and mobility for students traveling to local schools and colleges through the implementation of bicycle facilities, ADA-compliant curb ramp upgrades, and trail improvements. The scope includes project management, design validation of 30 percent concept plans, and environmental requirements such as supplemental Phase II environmental sampling and the preparation of hazardous materials design-basis memorandums. The procurement follows a qualifications-based selection process where price is not an evaluation factor for ranking; instead, the city will rank firms based on technical qualifications and negotiate fees with the highest-ranked firm. Proposals are due by October 9, 2026, and must include a technical proposal and a separate sealed fee schedule. The project timeline begins with the design phase in January 2027, with the design phase ending in January 2028, construction award following in February 2028, and final project closeout expected by December 2029. Selected contractors must adhere to Caltrans Local Assistance Procedures Manual standards and California prevailing wage requirements.
Engineering Services

POSTED

9 days ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS