Citywide Curb Ramp Improvements 2024 Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The City of Redondo Beach is soliciting bids for the Citywide Curb Ramp Improvements 2024 Project, a public works initiative aimed at enhancing accessibility in compliance with ADA standards across the city. The scope of work encompasses the removal of existing asphalt and Portland Cement Concrete, construction of new ADA-compliant curb ramps, installation of detectable warning surfaces, rehabilitation of curb and gutter systems, and installation of cross gutters, retaining curbs, handrails, and culverts. Additional tasks include utility adjustments, sign relocation, traffic signal pull box modifications, and repaving with updated striping and markings. All work must adhere to the 2024 editions of the Standard Specifications for Public Works Construction and Caltrans standards, with City of Redondo Beach Special Provisions taking precedence in case of conflict. The project is governed by APWA Standard 1115 for curb ramp design, and contractors are required to submit as-built drawings, material samples with full labeling, and comprehensive documentation meeting specified technical criteria. The solicitation, issued under NAICS code 237310 and identified by solicitation number 20260724016, is open to responsible bidders under a Lowest Price Technically Acceptable evaluation method, with award based on the lowest base bid or lowest combination of base and alternates. Bids must be submitted electronically through the OpenGov procurement portal by the deadline of August 27, 2026, at 10:00 a.m., with no paper submissions accepted. Contractors are responsible for mobilization, traffic control, material testing, survey work, and implementation of water pollution control BMPs, all under the oversight of the City Engineer and Public Works Department. Payment and invoicing are handled manually, with daily cost sheets and vendor invoices required within 15 days of work completion, and no electronic systems like WAWF are supported. Compliance with labor standards is mandatory, including submission of certified payrolls, adherence to Davis-Bacon and related acts, and retention of records for three years. The contractor must provide a one-year guarantee on all work, and unforeseen site conditions may lead to equitable adjustments. All materials must be properly labeled with origin, producer, specification, and drawing references, and submittals must conform to strict paper size and format guidelines for shop drawings and as-built plans.
General Info
Agency
NAICS
Place of Performance
Redondo Beach, CA, 90277, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from California → City of Redondo Beach
Same awarding agency
