Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Wisconsin was posted on May 14, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Civil & Site Work for Charging Stations

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and reconstruction of eight launching ramps across four bays, designed to accommodate vessels exceeding 35 feet and weighing over 10 tons. Key project activities include the demolition of existing concrete structures, dredging and grading of native soils, placement of various gravel fills, and the installation of new concrete ramps using either a precast slab system or pour-in-place solution. Additionally, the contractor is responsible for the temporary relocation and re-anchoring of floating docks to ensure ADA-compliant travel, the installation of articulated concrete mattresses for scour protection, and the implementation of strict environmental controls, including turbidity curtains and stormwater pollution prevention plans. Bidders must be pre-qualified in Marine Construction for at least 750,000 dollars and provide a bid security deposit equal to 10 percent of their maximum bid price. The project must be completed within 180 calendar days from the Notice to Proceed, with a hard deadline for full public restoration by February 15, 2027. To minimize public disruption, the contract limits the simultaneous closure of all four ramps to a maximum of 45 calendar days. Performance will be verified through third-party topographic surveys, with acceptance based on post-grading soundings compared to the design template. Progress payments will be prorated monthly based on the physical percentage of project completion.
Public Works

POSTED

about 3 hours ago

DEADLINE

in 21 days
NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at Bare Cove Park Drive. This project, with an estimated construction cost of $1,300,000, involves comprehensive site work including the removal of trees and shrubs, site re-grading, and the installation of post-tension courts, posts, nets, walkways, benches, shade shelters, fencing, and sound attenuation. Additionally, the contractor will construct a new asphalt parking lot and ADA-compliant pathways. The awarded contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for the installation and maintenance of construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who meets strict minimum qualifications, including at least seven years of experience in constructing sports courts and a proven track record of building post-tension courts, including at least one for a Massachusetts municipality within the last three years. Bids must be submitted as a fixed lump sum via the OpenGov portal by November 3, 2026. The project is governed by Massachusetts General Law Chapter 30, Section 39M, and requires strict adherence to prevailing wage schedules, OSHA regulations, and the Buy America Act. Key financial requirements include a 5% bid security, a payment bond equal to 50% of the total project cost, and a 5% retainage on monthly progress payments. The contractor must provide a minimum one-year warranty for labor and a two-year warranty for materials.
Recreation

POSTED

about 4 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The Office of Energy and Climate Change for Wisconsin is seeking a subcontractor for civil and site work related to the development of electric vehicle and hydrogen charging stations. The scope of work encompasses essential infrastructure tasks, including grading, paving, utility trenching, and the installation of signage. Additionally, the contractor will be responsible for ensuring all sites feature ADA-compliant access construction. This opportunity is categorized under NAICS code 237990. Interested parties must submit their responses by the deadline of June 13, 2025. Further details regarding the solicitation can be accessed through the provided procurement portal.

General Info

Wisconsin seeks civil subcontractors for EV and hydrogen stations by June 13, 2025.

Agency

Wisconsin → Office of Energy & Climate Change

Place of Performance

WI, USA

Set-Aside

NONE

Documents

This scope was carved out of 2025-RFP-035-PR.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Charge Up Dane County - Site Hosts for EV Charging Infrastructure

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWisconsin → Office of Energy & Climate Change
ContactsNo contacts available
OfficeN/A
Organization / Agency
Wisconsin → Office of Energy & Climate Change
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Grading, paving, utility trenching, signage, and ADA-compliant access construction at EV and hydrogen station sites.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS