Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Civil Engineering & ADA Design

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Highland, CA, 92346, USA

Set-Aside

NONE

Documents

This scope was carved out of SIG 25001.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Citywide Traffic Signal Safety Improvements & Church Street/Love St Intersection Upgrade Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 29 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom Citywide Traffic Signal Safety Improvements & Church Street/Love St Intersection Upgrade Project
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Highland
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → City of Highland
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs civil design for intersection improvements for prime contractors on City of Highland traffic safety projects. Designs ADA-compliant curb ramps and channelization signing and striping for the Church Street intersection. Complies with ADA standards and City of Highland/Caltrans civil specifications. Delivers civil engineering plans for curb ramps and pavement markings.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
(RFQ) 27-26, Airport Architectural, Engineering and Planning Consultant Services - Annual Contract
Solicitation # 27-26
Henry County is seeking qualified aviation consulting firms to provide professional architectural, engineering, and planning consultant services for the Atlanta Speedway Airport in Hampton, Georgia. This annual contract, solicitation number 27-26, is intended as a multi-year Master Agreement for a five-year period, consisting of an initial one-year term with four optional one-year renewals. The scope of work includes airport master planning, civil and electrical airport design, and construction administration and observations. Key responsibilities involve preparing project funding applications, updating airport layout plans and environmental assessments, and managing the Capital Improvements Program for fiscal years 2028-2032, which includes projects such as runway improvements and corporate hangar site development. Proposals must be submitted by December 3, 2026, at 3:00 PM, via the County's eProcurement Portal or delivered physically to the Henry County Purchasing Department. To be considered, proposers must be registered with SAM.gov and pre-qualified with the Georgia Department of Transportation. Selection is based on the demonstrated competence and qualifications of the firm, with potential additional points awarded for interviews or presentations. Contractors must comply with OSHA safety standards, E-Verify requirements, and drug-free workplace certifications. There is no specific set-aside status for this solicitation.
Capital Projects

POSTED

about 2 hours ago

DEADLINE

in 14 days
View Details
NAICS: 541330
New
SLED
Building Services (Plan Review, Permitting, And Field Inspections)
Solicitation # 20261118027
The City of Suisun City is seeking qualified firms or individuals to provide professional and technical services for its Building Division to supplement in-house staff. The scope of work includes comprehensive plan reviews for architectural, structural, mechanical, electrical, plumbing, energy, and accessibility compliance, as well as field inspections for residential, commercial, and public construction projects. Additionally, the selected consultants will provide permitting assistance, public counter support, code enforcement, and general technical support, ensuring all development adheres to the California Building Standards Code (Title 24) and local ordinances. Services are performed on an as-needed basis, with the expectation that consultants will work out of Suisun City Hall during inspection days and align with the City's 9/80 work schedule. The contract is awarded based on a formal evaluation panel process to the firm best meeting the City's needs. The initial term begins on the effective date and may be extended for up to two additional one-year periods, with a maximum total duration of five years. Contractors must submit detailed monthly invoices, with the City paying undisputed amounts within 45 days. There is no specific set-aside status for this solicitation. Proposers must submit electronic PDF proposals to the Principal Planner, including firm qualifications, a five-year reference history, and a signed certification confirming the absence of conflicts of interest and the validity of the proposal for 90 days.
City of Suisun City

POSTED

about 3 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 541330
New
SLED
Citywide Traffic Signal Safety Improvements & Church Street/Love St Intersection Upgrade Project
Solicitation # SIG 25001
The City of Highland is soliciting proposals for the Citywide Traffic Signal Safety Improvements and Church Street/Love Street Intersection Upgrade Project. The scope of work involves upgrading thirty-five citywide signalized intersections from 8-inch to 12-inch LED heads, adding retroreflective backplates, countdown heads, and APS buttons. Additionally, the project requires the full design of a new traffic signal system and civil improvements at the intersection of Church Street and Glenheather Drive/Love Street, including ADA curb ramps and channelization signing. All work must adhere to Caltrans, City of Highland, and CA MUTCD standards, with deliverables consisting of 60%, 90%, and final Plans, Specifications, and Estimates (PS&E). Proposals must be submitted electronically via the BidNet Direct Vendor Portal by December 17, 2026, at 5:00 p.m. Submissions are limited to 30 pages and must include a cover letter, statement of qualifications, corporate profile, project team organizational chart, and a signed signature page. A detailed fee proposal with a not-to-exceed total must be provided as a separate attachment. Selection is based on the firm's capability to perform the services, evaluated on a 100-point scale. The consultant is required to comply with California Labor Code Section 1775 regarding prevailing wages and must provide comprehensive indemnification and insurance coverage for the City. Monthly invoicing is required, with payments issued within 30 calendar days of receipt.
City of Highland

POSTED

about 3 hours ago

DEADLINE

in 28 days
View Details
NAICS: 541330
New
SLED
Pipeline Trail Phase 3 - Architecture and Engineering Services
Solicitation # 2026-RFQ-257
Pierce County Parks and Recreation is soliciting multidisciplinary teams to provide architecture and engineering services for Phase 3 of the Pipeline Trail. This project involves the planning, design, engineering, permitting, and construction administration of a 2.2-mile non-motorized, multi-modal trail extending from Orangegate Park to Fruitland Ave E along the Tacoma Public Utilities Pipeline Road corridor. The scope of work includes conducting professional surveys, facilitating public outreach, developing preliminary and final trail alignments, and creating complete bid-ready construction documents. The project requires coordination with Pierce County Stormwater Management for FEMA flood requirements and Pierce County Traffic for intersection crossing options. The initial contract period is anticipated to last 30 months, beginning in January 2027, with an option for a one-year renewal. Work is phased from public outreach and schematic design in 2027, to design development and permitting in 2028, with construction bidding in March 2029 and construction administration continuing through September 2030. Proposals are due by November 20, 2026, via the County's eProcurement Portal. Selection will be based on the most qualified team, with potential interviews for top-ranked firms. Contractors must comply with RCW 39.12 prevailing wage requirements and various federal and state accessibility and non-discrimination laws. There is no set-aside status for this solicitation.
Parks and Recreation

POSTED

about 4 hours ago

DEADLINE

in 5 days
View Details

More opportunities from California → City of Highland

Same awarding agency

NAICS: 238160
SLED
Highland Police Station Membrane Roof Replacement Project
Solicitation # 2026-05
The City of Highland, California, is soliciting bids for the Highland Police Station Membrane Roof Replacement project, identified as solicitation 2026-05. The scope of work involves retrofitting a KEE membrane roof system using Tremco CPG Inc products over the existing roof, replacing metal coping, and installing flexible walkways. The selected contractor must coordinate with a separate PV contractor for the removal and installation of a solar system, ensuring all penetrations are properly patched, sealed, and flashed. The project requires a 20-year manufacturer QA warranty and a 2-year contractor installation warranty, with mandatory manufacturer inspections scheduled for years 2, 5, 10, and 15. The contract will be awarded to the lowest responsible bidder who is licensed and registered with the DIR. Bidders must provide a bid security of at least 10 percent of the total bid and, upon award, provide performance and payment bonds equal to the contract price. As a public work under Labor Code Section 1720, the project mandates the payment of prevailing wages. Payment is processed monthly via progress estimates submitted to the City Engineer, with a 5 percent retention withheld from each payment. The contractor is responsible for strict material handling and storage according to manufacturer specifications to prevent deterioration and theft. Final acceptance of the work is conducted by the City Council following a thorough site cleanup and verification by the City Engineer.
Roofing Contractors

POSTED

22 days ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS