Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Vermont was posted on May 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Civil/Structural Engineering – Culvert and Drainage Design

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP #27-035 Hydraulic Modeling & system Analysis Program
Solicitation # 27-035
The City of Albany, Georgia, is soliciting competitive sealed proposals under RFP #27-035 for a qualified firm to develop and implement a comprehensive hydraulic modeling and system analysis program for its water distribution system. The primary objective is to create a fully functional model that the City can maintain internally for operations, planning, and emergency response without ongoing consultant reliance. The scope includes system analysis for pressures, fire flow, storage, pumping, outages, future growth, and capital improvement planning. To ensure platform independence, the final model must be delivered in its native software format as well as an EPANET-compatible format. Proposals must be submitted by 5:00 PM on November 23, 2026, to the Procurement Division in Albany, Georgia. Submissions must include one original and six copies on company letterhead, signed by an authorized official, and accompanied by a Certificate of Non-Collusion, a Governing Law and Venue form, and an Addendum Acknowledgement Form. Award will be based on a weighted evaluation of experience and qualifications (35%), project approach and understanding (30%), references and portfolio (25%), and a detailed fee proposal (10%). The selected contractor must maintain liability insurance of at least $1,000,000 per occurrence and $2,000,000 annual aggregate, as well as workers compensation and employers liability of at least $1,000,000. Compliance with the Georgia Security and Immigration Compliance Act and the Federal Work Authorization Program is required. Payment terms are Net 30, and the contract is subject to multi-year contract clauses pursuant to OCGA 36-60-13. All equipment provided must be the latest model and composed of new parts, with the City reserving the right to reject any materials that do not meet specifications.
City of Albany

POSTED

about 6 hours ago

DEADLINE

in 26 days

AI Contract Overview

Show more

The contract calls for civil and structural engineering services focused on the design of a culvert replacement structure, requiring comprehensive hydraulic analysis to ensure proper water flow management and flood resilience. The work includes integrating the new structure with existing drainage systems, ensuring compatibility with site topography and environmental conditions. Engineers must develop both conceptual designs for initial review and finalized contract plans ready for construction bidding and implementation. The project falls under NAICS code 541330, classifying it as architectural and engineering services, and is issued as a subcontract by the Vermont Department of Economic Development. Responses are due by June 22, 2026, with the solicitation posted on May 11, 2026, and the performance location remains unspecified beyond the state of Vermont.

General Info

Design and engineering of culvert replacement with hydraulic analysis; responses due June 22, 2026.

Place of Performance

VT, USA

Set-Aside

NONE

Documents

This scope was carved out of 73732.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Design Engineering: Green Valley Rd Culvert Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Design culvert replacement structure with hydraulic analysis, drainage integration, and development of conceptual and contract plans.

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 237110
New
SLED
Barnet Fire District No. 2 Potable Water Supply PFAS Mitigation
Solicitation # 1697-001
The Barnet Fire District No. 2 Potable Water Supply PFAS Mitigation project is a general construction contract issued by the Department of Economic Development for the State of Vermont. The scope of work involves comprehensive improvements to the water system at 339 Carter Street in Barnet, Vermont, including modifications to the water treatment building, component upgrades, SCADA integration, relocation of existing components, underground piping, and associated site work. The project is funded in part through the Vermont Drinking Water State Revolving Fund and is managed by MSK Engineers. Bids must be submitted by December 3, 2026, at 2:00pm local time to the Barnet Town Hall or via the specified mailing address. Awardees are required to provide bid security and both performance and payment bonds totaling 100 percent of the contract price. The contract is subject to several federal mandates, including the Davis-Bacon Act for wage rates, Disadvantaged Business Enterprise requirements, and the Build America, Buy America Act and American Iron and Steel provisions, which mandate that iron, steel, and construction materials be produced in the United States. Additionally, the project adheres to prohibitions on certain telecommunications and video surveillance services or equipment.
Water and Sewer Line and Related Structures Construction

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS