This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on September 16, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

CJAG Fence Install

Closed
W9136426P0000040380Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This firm-fixed-price contract, a 100 percent total small business set-aside, involves the construction of approximately 3,850 linear feet of FE-6 security fencing and the installation of two 20-foot manual sliding security gates at Load Line 6, Camp James A. Garfield in Ravenna, Ohio. The fencing must be a minimum of 8 feet high, consisting of 9-gauge galvanized 2-inch mesh chain-link fabric with outward-facing 45-degree outriggers and three strands of 12.5-gauge double-twisted barbed wire. Technical requirements include post-hole depths of at least 42 inches and a maximum two-inch gap between the fabric and finished grade. The project is governed by DoD Unified Facilities Supplement 4-022-03, and the contractor is responsible for all labor, materials, and site restoration, including the removal of construction debris and the seeding of bare earth areas. The period of performance is six months from the date of award, with a government preference for completion prior to December 1, 2026. The contractor must comply with the Davis-Bacon Act wage determination for Ohio Heavy and Highway and adhere to the C-JAG Storm Water Construction Permit requirements, which include attending training and submitting a co-permittee notice of intent. Site access is managed via an access roster, and the government will provide the layout for the fence alignment after vegetation clearing is completed. Award will be based on the best value, evaluating technical capability, past performance, and price. Invoicing must be processed electronically through Wide Area Workflow following government acceptance of the completed work.

General Info

Small business contract for security fencing and gates at Camp James A. Garfield.

NAICS

238990 - All Other Specialty Trade Contractors

Place of Performance

Ravenna, OH, 44266, USA

Set-Aside

SBA

Documents

5

Fence Site Plan - 01_SHEETS-FENCE-V3

PDF, High priority: read this firstspecifications
High

PWS - Construction of Security Fencing

DOCX, High priority: read this first10 pages · sow
High

W91364-26-Q-0000 040380 - Security Fence Install Amendment 1

DOCX, High priority: read this first7 pages · amendment
High

W91364-26-Q-0000 040380 - Security Fence Install Amendment 2

DOCX, High priority: read this first9 pages · amendment
High

W91364-26-Q-0000 040380 - Security Fence Install RFQ

DOCX, High priority: read this first4 pages · rfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7NU Uspfo Activity Oh Arng
Contacts1 person available
OfficeCOLUMBUS, OH, 43235-2712, USA
Office AddressCOLUMBUS, OH, 43235-2712, USA
Contacts

Full Description

Show more

Amendment 1 – Q&A – 16 Sep 26


Question1. The PWS references two 20-foot manual sliding security gates and also states that two 20-foot manual gate openings are to be installed. Please confirm whether the requirement is for two separate 20-foot manual sliding gate openings, or one 40-foot opening consisting of two 20-foot sliding gate leaves that close together.


Answer 1: The requirement is for two separate 20-foot manual sliding gates.


Question 2. Gate Configuration: PWS Paragraph 5.1 identifies two 20-foot manual sliding security gates, while Paragraph 5.1.5 references “swing clearance.” Please confirm whether the required gates are manual sliding gates, swing gates, or another configuration.


Answer 2: The requirement is for two separate 20-foot manual sliding gates.


Question 3. Field Measurements / Site Access: The PWS requires the contractor to verify all measurements prior to submitting a quotation. Will the Government conduct a scheduled site visit or otherwise provide access to Load Line 6 for prospective contractors to perform the required field verification before the quotation due date?


Answer 3: Site visits can be scheduled by contacting CW2 Grant Stoner (+1 (555) 000-0000, contact@example.gov) or MAJ Kyle Miller (contact@example.gov).


Question 4. Fence Alignment / Drawings: Are drawings, site plans, maps, or other documents available identifying the exact proposed fence alignment and locations of the two 20-foot gates?


Answer 4: Yes, drawing is attached and ARNG will perform layout prior to fencing installation after the vegetation clearing is complete.


Question 5. Completion Schedule: The PWS states a six-month period of performance from contract award; however, the solicitation instructions require a proposed schedule demonstrating completion prior to December 1, 2026. Please confirm whether December 1, 2026 is the mandatory completion deadline or whether the contractor will receive six months from the date of award.


Answer 5: The contractor will receive a six-month period to complete the work, but the work should be scheduled immediately upon award of the contract, and if possible, the government would like completion prior to 1 December.


Question 6. Underground Utilities: The PWS directs the contractor to coordinate with CJAG Department of Public Works to locate and mark underground utilities. Will CJAG/DPW perform the utility locating and marking at no cost to the contractor, or should the contractor include any associated utility-locate costs in its quotation?


Answer 6: There are no live underground utilities in the area.


Question 7. Permits: Are any local, state, installation, excavation, or construction permits required for this project? If so, please identify which permits the contractor is responsible for obtaining and paying for.


 Answer 7: The contractor must comply with the Ohio National Guard Environmental requirements, but no additional permits are required for this project.


Question 8. Site Conditions / Clearing: Can the Government provide additional information or photographs showing the existing conditions along the approximately 3,850-linear-foot fence alignment, particularly the amount of brush, vegetation, grading, or other site preparation anticipated within the required 10-foot-wide clearing corridor?


Answer 8: Fence line installation will be cleared to a minimum of 30 feet left and right of center via another project prior to fence installation. The area will be graded so that grass is planted and mowing can be accomplished.


Question 9. Excess Soil / Disposal: May excess soil generated from the post-hole excavation be spread or relocated on Government property at a location designated by the COR, or must all excess soil be removed from Camp James A. Garfield and disposed of off-site?


 Answer 9: A minimum amount of excess soil may remain on the site if it can be spread to conform to the natural grade on the site.


Question 10. Installation Access: Is there an anticipated processing timeframe for contractor and subcontractor personnel to obtain installation access/background-check approval? Additionally, are there any vehicle, equipment, escort, or badging requirements bidders should account for when developing their pricing and schedule?


 Answer 10: All access requirements are provided in the post award kick off meeting. There are no fees and no badging requirements.


Question 11. Wage Requirements: Please confirm whether a Davis-Bacon Act wage determination or any other prevailing-wage requirement applies to this construction requirement. If applicable, please provide or identify the applicable wage determination.


 Answer 11: Wage determination for Ohio Heavy and highway applies and will be updated prior to award if a new version is available.  OH20260001 07/30/2026


Question 12. Gate Hardware: Please confirm whether there are any specific requirements for gate latches, locking hardware, rollers/tracks, stops, drop rods, or other gate hardware beyond the requirements currently contained in the PWS and applicable UFS/UFC criteria.


Answer 12: There are no additional requirements that are not in the PWS or applicable UFS criteria.


Question 13. Government-Furnished Information: Are there any additional drawings, specifications, site photographs, utility information, or technical documents that will be provided by amendment before quotations are due?


Answer 13: 01_sheets-fence-v3_redacted is the only drawing included.  Request a site visit if additional information is required.


~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~


Amendment 1 - 10 Sep 2026 - Add POC for site visit, Added drawing, Added Q&A.


Site Visits Encouraged - Call to schedule - Call 1SG Brian Persing +1 (555) 000-0000 or CW2 Grant Stoner +1 (555) 000-0000.


Attachment added: 01_SHEETS-FENCE-V3.pdf


Q&A


Question 1. Gate Configuration: PWS Paragraph 5.1 identifies two 20-foot manual sliding security gates, while Paragraph 5.1.5 references “swing clearance.” Please confirm whether the required gates are manual sliding gates, swing gates, or another configuration.


Answer 1. Manual sliding gates


Question 2. Field Measurements / Site Access: The PWS requires the contractor to verify all measurements prior to submitting a quotation. Will the Government conduct a scheduled site visit or otherwise provide access to Load Line 6 for prospective contractors to perform the required field verification before the quotation due date?


Answer 2. Can either have a scheduled site visit day or be available when needed by appointment with prospective contactors, although until clearing is complete not much to see.


Question 3. Fence Alignment / Drawings: Are drawings, site plans, maps, or other documents available identifying the exact proposed fence alignment and locations of the two 20-foot gates?


Answer 3. Fence Alignment drawing was provided (also see attached here, once clearing is complete, BDE 12T assets will be used to layout alignment.


Question 4. Completion Schedule: The PWS states a six-month period of performance from contract award; however, the solicitation instructions require a proposed schedule demonstrating completion prior to December 1, 2026. Please confirm whether December 1, 2026 is the mandatory completion deadline or whether the contractor will receive six months from the date of award.


Answer 4. Complete prior to December 1 is preferred, also cant start until after clearing is complete in late September / October


Question 5. Underground Utilities: The PWS directs the contractor to coordinate with CJAG Department of Public Works to locate and mark underground utilities. Will CJAG/DPW perform the utility locating and marking at no cost to the contractor, or should the contractor include any associated utility-locate costs in its quotation?


Answer 5. no active utilities in the area


Question 6. Permits: Are any local, state, installation, excavation, or construction permits required for this project? If so, please identify which permits the contractor is responsible for obtaining and paying for.


Answer 5. This project is covered under the C-JAG Storm Water Construction Permit and the contractor will have to attend a brief training on the SWP3, submit a co-permittee NOI, sign a Contractor certification form, install additional sediment and erosion controls if necessary, comply with fueling requirements and spill kits, comply with concrete outwash, level ruts, prepare seed bed, and seed and straw all bare earth areas they create.


Question 7. Site Conditions / Clearing: Can the Government provide additional information or photographs showing the existing conditions along the approximately 3,850-linear-foot fence alignment, particularly the amount of brush, vegetation, grading, or other site preparation anticipated within the required 10-foot-wide clearing corridor?


Answer 7. A site visit is authorized


Question 8. Excess Soil / Disposal: May excess soil generated from the post-hole excavation be spread or relocated on Government property at a location designated by the COR, or must all excess soil be removed from Camp James A. Garfield and disposed of off-site?


Answer 8. Soil can be spread in the clear zone and a seed bed prepared and all bare earth areas seeded with a C-JAG approved turf grass mix and mulched with 2” to 3” of straw cover.


Question 9. Installation Access: Is there an anticipated processing timeframe for contractor and subcontractor personnel to obtain installation access/background-check approval? Additionally, are there any vehicle, equipment, escort, or badging requirements bidders should account for when developing their pricing and schedule?


Answer 9. An access roster will be provided, valid drivers license or photo ID must be present at all times.


Question 10. Wage Requirements: Please confirm whether a Davis-Bacon Act wage determination or any other prevailing-wage requirement applies to this construction requirement. If applicable, please provide or identify the applicable wage determination.


Answer 10.  Yes Davis-Bacon Act applies.


Question 11. Gate Hardware: Please confirm whether there are any specific requirements for gate latches, locking hardware, rollers/tracks, stops, drop rods, or other gate hardware beyond the requirements currently contained in the PWS and applicable UFS/UFC criteria.


Answer 11. There are no additional hardware requirements besides those contained in the PWS and UFS.


Question 12. Government-Furnished Information: Are there any additional drawings, specifications, site photographs, utility information, or technical documents that will be provided by amendment before quotations are due?


Answer 12. No


Question 13. What is the Height of the fence?


Answer 13. The fence height is 8 feet, with a minimum of 7 feet of fabric plus the top guard outrigger and barbed wire.


Question 14. Is the contractor to install a slide gate or swing gate?


Answer 14. Slide Gate


Question 15. Are the fence and footers to be removed by installation contractor?


Answer 15.  Old fence will be removed prior to start of work.


Question 16. Can the footers and fence be left on site?


Answer 16. No


Question 17. Does the fence need to be grounded? If so, how often does it need to be grounded?


Answer 17. Grounding is not required for this project.


Question 18. What your spec on FE-6, we want to make sure we don’t have tension wire, rods, barbed wire on the inside and outside ect.


Answer 18. Not sure what the question is.


Question 19. Confirm which specific portions of the project require integrated intrusion detection systems (sensored) versus standard perimeter fencing (non-sensored) to select the correct detail (FEN-03 vs. FEN-04).


Answer 19. There will be no intrusion detection systems on the fence.


Question 20. Review Hardware: High-security specifications (ASTM F626) mandate specific fittings, tension bands, and tie wires. Ensure your material take-off accounts for these high-security grade accessories rather than standard commercial hardware.


Answer 20. Not high security specs


Question 21. Confirm Gate Requirements: Refer to the FEN-09 detail specifically for any swing or cantilever gates, as these have distinct framing, post size (often 4-inch or 6 5/8-inch OD depending on width), and bracing requirements compared to the main fence line.


Answer 21. Manual sliding gates


~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~


Construction of approximately 3,850 linear feet of FE-6 security fencing, including two 20-foot manual security gates, at Load Line 6, Camp James A. Garfield, Ravenna, Ohio



Site visits are encouraged - call 1SG Brian Persing +1 (555) 000-0000 or CW2 Grant Stoner +1 (555) 000-0000.  Only contact for site visits, all other questions are submitted to contact@example.gov

More opportunities from Department Of Defense → W7NU Uspfo Activity Oh Arng

Same awarding agency

NAICS: 541611
Federal
Small Business Mentorship and Transition PlanningThe contract titled Small Business Mentorship and Transition Planning is a subcontract set aside exclusively for small businesses under the SBA Total Small Business Set-Aside provision, aimed at ensuring a seamless transition of responsibilities related to medical readiness operations. The primary focus is on knowledge transfer, the development of comprehensive operational documentation, and hands-on mentorship to equip incoming contractors with the skills and insights necessary to maintain uninterrupted service delivery. This effort is critical to sustaining mission-critical functions within the Department of Defense, specifically under the W7NU Uspfo Activity Oh Arng, with performance centered in Columbus, Ohio, at the 43213 zip code. The work is classified under NAICS code 541611, indicating it falls under Management Consulting Services, reflecting the advisory and transitional nature of the tasks involved. Although no solicitation number is provided, the opportunity was posted on June 17, 2026, and is accessible via the SAM.gov portal. The contract does not specify a point of contact, and no additional organizational or address details are included beyond the place of performance. The emphasis remains on empowering small business contractors to assume ongoing duties with full operational competence, thereby ensuring continuity, reducing risk, and upholding readiness standards for medical support functions.
Administrative Management and General Management Consulting Services

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 561320
Federal
Security-Cleared Personnel Recruitment and Onboarding SupportThe contract titled Security-Cleared Personnel Recruitment and Onboarding Support is a small business set-aside subcontract under NAICS code 561320, aimed at accelerating the recruitment, vetting, and onboarding of personnel with existing security clearances to ensure rapid deployment for future mission-critical transitions. The effort focuses on reducing time-to-staff by pre-identifying, assessing, and preparing cleared individuals for immediate integration into upcoming assignments, particularly those requiring rapid scaling or continuity of operations. This support function is critical for maintaining operational readiness and minimizing delays during contract handoffs or surge requirements. The contract is managed by the Department of Defense through the W7NU Uspfo Activity Oh Arng, with performance centered in Columbus, Ohio, under a total small business set-aside designation, meaning only eligible small businesses can compete. The scope does not include direct service delivery but rather the foundational workforce pipeline activities necessary to sustain readiness across defense operations. While no specific solicitation number or point of contact is provided, the contract opportunity is publicly accessible via the SAM.gov platform, indicating it is an active procurement targeting qualified small business vendors with expertise in security-cleared talent acquisition and onboarding processes.
Temporary Help Services

POSTED

4 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement