Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Clairemont Drive Overcrossing Bridge Deck Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans District 11 in San Diego is planning the rehabilitation of the Clairemont Drive bridge, which spans Interstate 5 at Post Mile R22.3, with work focused on the bridge deck and limited enhancements to surrounding infrastructure. The project includes the potential construction of two or fewer roundabouts and improvements to crosswalk visibility, all confined within the existing Caltrans right-of-way and previously disturbed areas to minimize environmental impact. Environmental commitments are documented in the Environmental Commitments Record and supported by technical studies conducted for the project, ensuring compliance with regulatory requirements. The work is forecasted to proceed under the title Clairemont Drive Overcrossing Bridge Deck Project, with the official notice posted on August 3, 2026, and primary point of contact being Jack Parker, Environmental Scientist-Generalist, reachable via phone or email for further inquiries.

General Info

Caltrans to rehab Clairemont Drive bridge deck, add up to two roundabouts, improve crosswalks within existing right-of-way.

Agency

California → Caltrans, District 11 - San Diego

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

(1)

Clairemont Drive Overcrossing Bridge Deck Project

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 11 - San Diego
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 11 - San Diego
Office AddressN/A
Contacts
Jack ParkerEnvironmental Scientist- Generalist

Full Description

Show more
Caltrans proposes to rehabilitate the Clairemont Drive bridge (57-0429) that crosses over Interstate 5 (Post Mile [PM] R22.3) in San Diego, CA. There would be two (2) or less roundabouts constructed with enhancements to crosswalk visibility through design improvements limited to the existing Caltrans Right-of-Way (ROW) and previously disturbed and improved areas. Environmental commitments are included in the Environmental Commitments Record (ECR). A supplementary summary of information of the technical studies prepared for the project is also provided.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Fisherman’s Terminal (FT) Entry and Exit Paving RedevelopmentThe Fishermen’s Terminal Entry Redevelopment Project will revitalize the entry and exit drives along 19th Ave W, along with the former Downie Building (C-14) footprint and surrounding parking areas. Existing pavement in deteriorated condition will be milled and resurfaced, while aging stormwater infrastructure will be fully replaced and expanded to divert runoff from combined sewer lines into dedicated storm drainage systems, with water quality treatment incorporated where qualifying pavement surfaces are replaced. The remaining concrete slab from Phase 1 will be demolished to make way for a blended layout of new parking spaces and native green space designed as a pollinator habitat, potentially housing a stormwater treatment facility. An irrigation system will be installed to support the new landscaping, which will also extend to the median along the entry drive. New electric vehicle charging stations will be integrated into the expanded parking area, and a protected two-way bike lane will be constructed to connect the terminal’s entry directly to the West Wall bike path, enhancing multi-modal accessibility. Pedestrian pathways will be upgraded to improve connectivity to the intersection of 21st Ave W and W Emerson Pl, as well as the adjacent King County Metro bus stop. Lighting will be enhanced throughout the newly configured parking and path areas, and comprehensive wayfinding systems will be implemented to guide pedestrians and cyclists through the redeveloped campus. The project is forecasted to be solicited under NAICS code 237310 by the Port of Seattle’s Waterfront Project Management office, with primary contact information provided for project inquiries and coordination.
Waterfront Project Management

POSTED

about 2 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
SLED
Asphalt Paving & Striping Unit Price Portwide 2026The contract encompasses a broad range of pavement and infrastructure maintenance activities across multiple Port of Seattle locations including Seattle-Tacoma International Airport, Maritime Properties, and adjacent areas. Work includes new asphalt paving and patching, overlays with fabric, crack sealing, seal coating, profile grinding, haul and disposal of grinding spoils, removal of existing striping, surface preparation for new markings, various stripe painting, saw cutting and coring of non-hazardous concrete and asphalt, installation of concrete wheel stops, curb repair and replacement, sidewalk lifting and leveling, and drainage system enhancements. All work requires adherence to performance standards and may involve obtaining necessary permits for improvements to public infrastructure. This procurement is issued under the title Asphalt Paving & Striping Unit Price Portwide 2026 by the Port Construction Services division of the Port of Seattle. The solicitation is posted as a forecast with a NAICS code of 237310 indicating highway and street construction. Primary point of contact is Heather Bowden, with Lesley Miles serving as project manager; inquiries should be directed via their provided email addresses and phone numbers. The contract will be administered across numerous port-wide sites with performance expected to meet specified technical and safety requirements, though no specific location details are provided in the data. The forecast date of July 31, 2026, suggests this is a planning notice for future work, not an active solicitation.
Port Construction Services

POSTED

about 2 hours ago

DEADLINE

N/A
View Details
NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract pertains to the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing a broad range of engineering disciplines including civil, structural, mechanical, electrical, instrumentation, and process improvements to enable effective removal of per- and polyfluoroalkyl substances from surface water supplies. The work involves comprehensive infrastructure upgrades to meet regulatory requirements and ensure public water safety, with all aspects of the project integrated to support operational efficiency and long-term performance. The project is classified under NAICS code 237310 for water and wastewater treatment plant construction and is designated for participation by Disadvantaged Business Enterprises under Department of Transportation guidelines, aiming to promote equitable economic opportunity in project execution. Solicitation for this project was issued by Pyramid Building & Engineering, Inc. under reference number lacsd-surface-water-pfas-removal-project-no-251-ca, with a deadline for responses set for September 3, 2026. The primary point of contact for inquiries and submissions is John Garrison, reachable via email and phone provided in the solicitation. The project's place of performance is within California, though specific city and zip details are not specified in the public data, and all work must be conducted at the designated treatment plant sites. Prospective bidders are expected to demonstrate technical capability in water treatment system integration, familiarity with PFAS removal technologies, and experience managing complex utility infrastructure upgrades under tight regulatory and community standards.
Pyramid Building & Engineering, Inc.

POSTED

about 6 hours ago

DEADLINE

in 30 days
View Details
NAICS: 237310
New
NCMT Berth 24-11 Structural Repair
Solicitation # ncmt-berth-24-11-structural-repair-0
The contract involves the rehabilitation of the existing concrete marginal wharf at National City Marine Terminal Berth 24-11 in San Diego, California, along with the reinstallation of the existing shore power system, as detailed in the contract drawings and specifications. The work encompasses a wide array of specialized tasks including demolition, asbestos and lead abatement, contaminated soil removal, underwater pile jacketing, concrete coring and saw cutting, dredging and dewatering, electrical and utilities work, environmental monitoring, and miscellaneous metal fabrication. The project is being executed under the oversight of Kiewit Infrastructure West Co. on behalf of the San Diego Unified Port District, with all subcontracted scope items required to be performed by qualified specialists. Bidders must hold a valid California Contractor’s License and be registered with the Department of Industrial Relations, provide acceptable insurance coverage, and demonstrate labor harmony by either being signatory to collective bargaining agreements with specific trade unions—carpenters, laborers, cement masons, ironworkers, operating engineers, and teamsters—or otherwise prove their capacity to maintain labor peace on site under the project’s mandatory Project Labor Agreement. Responsible subcontractors and material suppliers must provide bonding equal to 100% of their contract value, with Kiewit agreeing to reimburse associated bond premiums. The solicitation, issued through Kiewit’s BuildingConnected system, targets participation from Disadvantaged Business Enterprises, Small Business Enterprises, Disadvantaged Veteran Business Enterprises, Minority Business Enterprises, and Woman Business Enterprises certified by recognized entities including the Small Business Administration, the Department of Transportation’s DBE program, and other state, tribal, or private certification bodies. All proposals must be submitted via the BuildingConnected platform by the deadline of August 6, 2026, at 2:00 p.m., and bidders are required to request the full invitation to bid and accompanying plans and specifications directly from Brian Chon at Kiewit. The place of performance is clearly defined as San Diego, California, though the overall contract value, period of performance, and detailed payment terms are not disclosed in the provided documentation. Non-compliance with mandatory pass/fail requirements such as licensure, DIR registration, insurance, or labor harmony will result in disqualification, and the award will be made to responsive and responsible bidders based on their ability to meet these non-negotiable conditions.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237310
New
SLED
T32-D3-PCC-SR 22-Upson-190339
Solicitation # 48400-eRFQ-001889-2027
The Georgia Department of Transportation is soliciting bids for Drainage Rehabilitation, Repair, Replacement, and Miscellaneous Maintenance Services under solicitation number 48400-eRFQ-001889-2027, with a response deadline of September 1, 2026. Participation is restricted to contractors who have successfully completed the prequalification process #48400-410-000043083 and hold an active Master Service Agreement, specifically MMSA 48400-410-000034480, which governs all terms and conditions of this bid. The work is related to the maintenance and improvement of public road infrastructure in Upson County, Georgia, and all proposals must strictly adhere to the requirements outlined in the ITB/RFQ documentation. The State Entity reserves full discretion to modify provisions, reject any or all submissions, and waive minor irregularities as deemed necessary. The solicitation is issued under statutory authority permitting ancillary services for public road construction and maintenance, and is not open to the general public—only prequalified firms are eligible. The contract is classified as a solicitation under the SLED organization type, with all performance taking place within Georgia. Primary point of contact for inquiries is Timothy Swink, reachable via email or phone, and all relevant documents and details can be accessed through the official online portal. Bidders must carefully review the full ITB/RFQ, ensuring compliance with procedural instructions, as failure to do so may result in disqualification.
Department of Transportation

POSTED

about 13 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237310
New
SLED
Parking Improvements at Windmill Park
Solicitation # PE-77075-NONST-2027-000000017
Banks County Government is soliciting bids for parking improvements at Windmill Park in Homer, Georgia, with all proposals due by 2:00 p.m. on Friday, August 28, 2026, at the Board of Commissioners Office located at 150 Hudson Ridge. The project includes a comprehensive range of site improvements such as approximately 320 tons of 9.5 mm asphalt and 480 tons of 12.5 mm asphalt, 4,300 square yards of 6-inch graded aggregate base course, 890 linear feet of 6-inch by 24-inch curb and gutter, and 880 square yards of 4-inch concrete sidewalk. Stormwater management components consist of 220 linear feet of 18-inch HDPE storm drain, 200 linear feet of 24-inch HDPE storm drain, 44 linear feet of 18-inch RCP storm drain, two 24-inch concrete headwalls, two grate top drop inlets, one manhole, and one junction box. Additional work includes 200 square yards of Type 3 rip rap, 3,300 linear feet of 5-inch white pavement striping, 240 linear feet of 5-inch yellow pavement striping, 40 linear feet of 24-inch pavement striping, pavement markings, roadway and parking lot signage, mass grading, and erosion and traffic control measures. All work must be completed within 30 consecutive calendar days after receipt of a written Notice to Proceed, and a bid bond is mandatory with each proposal. Complete contract documents, specifications, and construction drawings are available by contacting Kurt Kirby, Director of Parks and Recreation, via email at kkirby@co.banks.ga.us or by phone at (706) 677-4407.
Banks County Board of Commissioners

POSTED

about 14 hours ago

DEADLINE

in 24 days
View Details