Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

Clarifier Mechanical Systems Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Clarifier Mechanical Systems Installation is a subcontract opportunity for the City of Roseville in California, specifically for projects at the Dry Creek Wastewater Treatment Plant. The selected contractor will be responsible for removing existing mechanisms and installing new chain-and-flight systems, including the integration of all ancillary mechanical components within the basin to ensure a fully operational system. Due to the nature of the work, the contractor must possess Confined Space Entry certification and strictly adhere to all plant safety protocols. The solicitation was posted on August 28, 2026, with a response deadline of October 27, 2026. The project falls under NAICS code 238220 and is located in Roseville, zip code 95747.

General Info

Subcontract for installing clarifier mechanical systems at Roseville Dry Creek Wastewater Treatment Plant.

Agency

California → City of RosevilleView Agency

NAICS

238220 - Plumbing, Heating, and Air-Conditioning ContractorsView NAICS

Place of Performance

Roseville, CA, 95747, USA

Set-Aside

NONE

Documents

This scope was carved out of 08-177.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Dry Creek Wastewater Treatment Plant Primary Sedimentation Basin Rehabilitation Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Roseville
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Roseville
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs chain-and-flight mechanisms for prime contractors on City Dry Creek Wastewater Treatment Plant projects. Removes existing mechanisms, installs new chain-and-flight systems, and integrates ancillary mechanical components within the basin. Requires Confined Space Entry certification and adherence to plant safety protocols. Delivers a fully operational chain-and-flight mechanism system.

Similar Contracts

Same NAICS industry code

NAICS: 238220
New
CBP5933 Bldg. 225 HVAC Replacement
Solicitation # CBP5933
Management & Training Corporation is seeking bids for a fixed-price, single lump sum subcontract to replace six split-system heat pump HVAC systems at the San Diego Job Corps Center in Imperial Beach, California. The project involves installing three 2-ton and three 1.5-ton Payne heat pump systems, including matching indoor air handlers, and requires the removal and disposal of old equipment. The estimated contract value ranges from 25,000 to 100,000 dollars, with a performance period of 30 consecutive business days following the written Notice to Proceed. Bids are due by September 11, 2026, and will be evaluated based on overall best value, considering price, quality, and delivery schedule. Eligible bidders include various small business categories, such as SDB, WOSB, HUBZone, and VOSB. Required submission documents include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, and a bid bond guarantee of at least 20 percent for bids equal to or exceeding 25,000 dollars. The contract is subject to the Davis-Bacon Act, requiring compliance with prevailing wage rates and federal energy efficiency standards. Additionally, awarded contractors must provide performance and payment bonds, maintain a Unique Entity ID, and adhere to FAR regulations regarding the Buy American Act and combating trafficking in persons. Final payment is contingent upon a successful final inspection and the submission of closeout documents, including certified payroll reports and operation and maintenance manuals.
San Diego Job Corps Center

POSTED

about 12 hours ago

DEADLINE

in 5 days
View Details
NAICS: 238220
New
RFQ7593 Smoke Detector Installation
Solicitation # RFQ7593
Management & Training Corporation (MTC) is seeking bids for a subcontracting opportunity to provide smoke detector installation and fire system services at the Sierra Nevada Job Corps Center in Reno, Nevada. This solicitation, identified as RFQ 7593, is open to various small business categories, including Small Disadvantaged, Women-Owned, HUBZone, and Veteran-Owned small businesses, under NAICS code 238220. Interested bidders must submit their response by September 18, 2026, at 3:00 PM PST, and are encouraged to attend a pre-bid meeting on September 11, 2026. Required submission documents include a bid sheet, proof of insurance, and a completed supplier self-certification packet including an IRS W-9. The contract mandates strict adherence to federal labor and regulatory standards, specifically requiring compliance with Service Contract Labor Standards and Wage Determination No. 2015-5595 Revision 28 for Washoe and Storey counties. Key FAR clauses are incorporated, including those regarding the prohibition of segregated facilities, combating trafficking in persons, and specific security and privacy requirements. Subcontractors with awards exceeding 30,000 dollars must disclose their debarment and suspension status. Payment is processed upon the submission of invoices for accepted materials or services, and the contract allows MTC or the government to inspect work at any reasonable time to ensure materials are merchantable and fit for their intended purpose.
Sierra Nevada Job Corps Center

POSTED

about 12 hours ago

DEADLINE

in 12 days
View Details
NAICS: 238220
New
RFQ#3191 Laundry Tray Installations
Solicitation # RFQ#3191
Management & Training Corporation (MTC) is seeking bids under RFQ 3191 for a subcontracting opportunity to provide plumbing services at the Charleston Job Corps Center in Charleston, West Virginia. The project requires the contractor to provide all labor, materials, and supervision to remove existing units and install new laundry trays and faucet sets in the Men's and Women's CTT and Education restroom areas. All installations must be performed on Everform Graphite Terrazzo Matrix counter tops and must comply with local plumbing codes and Job Corps facility standards. The contractor is responsible for testing all fixtures for proper water flow, leak prevention, and drainage functionality, ensuring all connections are watertight and the work area is cleared of all debris upon completion. This is a fee-for-service contract awarded on a lump sum basis, with MTC serving as the sole judge of best value. The opportunity is open to various small business categories, including SDB, WOSB, HUBZone, VOSB, and SDVOSB, under NAICS code 238220. Bids must be submitted via email to Wendy Lawrence by 3:00 PM EST on September 11, 2026. Required submission documents include a bid sheet, a completed supplier packet with a W-9 and self-certification form, proof of insurance, and three references for similar projects. The contract is subject to Service Contract Act prevailing wages, the Contract Work Hours and Safety Standards Act, and FAR 52.204-10 reporting requirements for projects valued at 40,000 dollars or more.
Management & Training Corporation

POSTED

about 12 hours ago

DEADLINE

in 5 days
View Details
NAICS: 238220
New
This is a subcontracting opportunity to replace a chiller in McKinney, TX.
Solicitation # subcontracting-opportunity-replace-chiller-mckinney-tx
Serrato Corporation is seeking a subcontractor to replace a failing air-cooled chiller at the North Texas Job Corps Center in McKinney, Texas, specifically within Building 214/215. The project requires the installation of a like-kind, similar model replacement for a 246-ton Carrier chiller using R-134A refrigerant. The scope of work extends beyond the chiller installation to include the demolition and disposal of the existing unit, the installation of a JACE 9000 central integration point for building automation controls, and the installation of three-way control valves for four air handling units. Additionally, the contractor must clean and inspect four air handling units and replace three of the four existing variable frequency drives. Bids are due by September 18, 2026, and must remain valid for 90 days. Submissions must include manufacturer equipment specifications, a Certificate of Liability Insurance naming Serrato Corporation as the holder, and Form 1413 for Davis-Bacon Act certified payroll compliance for work exceeding 2,000 dollars. Insurance requirements include a minimum of 1 million dollars for commercial general liability and 500,000 dollars for employers liability. The selected contractor will be responsible for performing startup and operational tests for the chiller and ensuring the proper operation of all air handling units before final acceptance. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB.
Serrato Corporation DBA North Texas Job Corps

POSTED

about 12 hours ago

DEADLINE

in 12 days
View Details
NAICS: 238220
New
RFQ#8911 Fire Suppression System Repairs
Solicitation # CBP#8911
Management & Training Corporation (MTC) is seeking a subcontractor for fire suppression system repairs at the Edison Job Corps Center in Edison, New Jersey, under solicitation RFQ#8911. This fixed-price, single lump sum contract requires the provider to supply all labor, materials, equipment, and supervision to restore systems to full operational condition. The scope of work includes repairing fire backflow preventer assemblies in the Culinary Building, replacing deteriorated sprinkler piping in the Women's Dormitory, and repairing fire suppression systems in the Wellness Center. All work must adhere to NFPA standards, state and local fire codes, OSHA requirements, and manufacturer specifications. Deliverables include hydrostatic re-testing, inspection reports, and two sets of operation and maintenance manuals. Bids will be evaluated based on overall best value, and a physical site visit is mandatory prior to submission. The opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, VOSB, and SDVOSB, under NAICS code 238220. For bids equal to or exceeding 25,000 dollars, a bid bond of 20 percent is required, along with performance and payment bonds from a surety company with at least an A- rating. The project is subject to Construction Wage Rate Requirements, necessitating compliance with New Jersey prevailing wage determinations and weekly certified payroll reporting. Additionally, contractors must provide a UEI number and complete the MTC Supplier Packet, including W-9 and self-certification forms. For contracts valued at 40,000 dollars or more, reporting requirements under FAR 52.204-10 regarding executive compensation and first-tier subcontract awards apply.
Management & Training Corporation

POSTED

about 12 hours ago

DEADLINE

in 5 days
View Details
NAICS: 238220
New
WOJC - Replacement of Condensing Unit and Evaporator Coil – Walk-In Freezer
Solicitation # wojc-replacement-condensing-unit-evaporator-coil-walk-freezer
The Westover Job Corps Center, managed by ETR, is seeking quotes for a subcontracting opportunity to decommission and replace a fire-damaged condensing unit and evaporator coil for a walk-in freezer in Chicopee, Massachusetts. The project requires all work to be performed by Massachusetts-licensed electricians and refrigeration technicians in compliance with the 2023 Massachusetts Electrical Code and the 780 CMR 13.00 Energy Code. Bidders must provide a detailed cost breakdown, a proposed service schedule, and all required licensing and credentials. The bid closes on September 11, 2026, and quotes must remain valid for at least 90 days from submission. To be eligible for award, contractors must submit a completed bid sheet, a W-9, a Vendor Acknowledgement Form, and applicable certificates of insurance. The winning bidder must possess an active SAM.gov registration and a Unique Entity ID. Award selection is at the sole discretion of ETR and is not based solely on the lowest bid. The contract incorporates various FAR clauses, including those regarding the Davis-Bacon Act, Service Contract Act, and Buy American requirements. Final payment is contingent upon the submission of a signed punch list and applicable warranties. Bonding is required for construction projects exceeding 35,000 dollars, with specific performance and payment bond requirements scaling up to projects over 150,000 dollars.
Westover Job Corps Center

POSTED

about 12 hours ago

DEADLINE

in 5 days
View Details

More opportunities from California → City of Roseville

Same awarding agency

NAICS: 336120
New
SLED
Ford F550 Truck with Dump Body
Solicitation # 10-3456
The City of Roseville is soliciting sealed electronic bids for the procurement and delivery of one Ford F550 Truck equipped with a dump body. The vehicle must feature a 3-4 yard capacity dump body, such as a Rugby Eliminator or approved equal, with split double acting tailgates, a 10-gauge hi-strength steel floor, LED lighting, an ECCO 510 back up alarm, an under-ride bumper with Class V receiver, and curbside underbody storage baskets. Bidders must be legally recognized and licensed car dealerships in good standing. The winning vendor is responsible for transporting the chassis to the manufacturer and providing final delivery FOB to the City of Roseville Fleet Services within 180 days of the order. Bids must be submitted electronically via publicpurchase.com by 3:00 p.m. Pacific Time on September 15, 2026. The City requires a signed original bid and a completed proposal column stating whether specifications are met or describing any deviations. The procurement process includes mandatory pre-paint and final inspections at the installer's shop, which may be conducted via Teams or Zoom if the shop is more than 150 miles from Roseville. Additionally, the vendor must apply a weight certificate decal to the driver side doorjamb and comply with the Fair Employment and Housing Act and the California Fair Employment Practice Act. Payment will be issued upon submission of acceptable invoices for delivered and accepted supplies.
Heavy Duty Truck Manufacturing

POSTED

6 days ago

DEADLINE

in 9 days
View Details
NAICS: 237110
SLED
Dry Creek Wastewater Treatment Plant Primary Sedimentation Basin Rehabilitation Project
Solicitation # 08-177
The City of Roseville is soliciting proposals for the Dry Creek Wastewater Treatment Plant Primary Sedimentation Basin Rehabilitation Project. The primary objective is to replace chain-and-flight mechanisms for rectangular type clarifiers and associated ancillary components, with a secondary objective to rehabilitate a 220-foot-long section of the basin. The scope includes surface preparation, concrete resurfacing, crack injection using Type II hydrophilic material, and watertightness leak testing. All work must be performed at the Dry Creek Wastewater Treatment Plant, and the contractor is required to maintain ongoing basin operations to minimize process disruptions. The project is subject to prevailing wage laws and requires the contractor to maintain a valid Contractor's State License Board license, as well as 100% payment and performance bonds. Proposals are due by October 27, 2026, at 3:00 PM and must be submitted via PublicPurchase.com. The contract will be awarded to the most advantageous responsible proposer based on a 100-point evaluation scale, with 40 points weighted toward the lowest proposed Guaranteed Maximum Price (GMP), 30 points for project understanding and scope of work, and 30 points split between firm and team qualifications. The performance period requires the operational use of all four refurbished basins within 252 calendar days from the Notice to Proceed, with a 15-working-day allowance for weather delays. Final payment is contingent upon a manufacturer's letter of acceptance and the completion of all punch list items.
Water and Sewer Line and Related Structures Construction

POSTED

9 days ago

DEADLINE

in about 2 months
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS