Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Class I and Class IV Watercourse Diversion

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract involves providing temporary or permanent water diversion services for Class I and Class IV watercourses on CAL FIRE timber harvesting projects. The scope of work includes the installation of cofferdams, diversion pipes, and silt curtains to manage water flow and implement sediment control within sensitive and non-fish bearing streams. To execute these tasks, the contractor is required to utilize water pumps and sandbags to ensure the successful delivery of diverted watercourses for project completion. The project must be performed in strict compliance with CDFW mitigation measures and Public Resources Code section 21108. This effort is managed under the Department of Forestry and Fire Protection for the state of California, falling under NAICS code 237990.

General Info

Subcontract for CAL FIRE water diversion services and sediment control on California timber projects.

Agency

California Forestry and Fire Protection, Department of

Place of Performance

CA

Set-Aside

NONE

Documents

This scope was carved out of EPIMS-MEN-57390-R1.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Streambed Alteration Agreement No. EPIMS-MEN-57390-R1 for Timber Harvesting Plan (THP) 1-25-00005-MEN

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Forestry and Fire Protection, Department of
ContactsNo contacts available
OfficeN/A
Organization / Agency
California Forestry and Fire Protection, Department of
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs temporary or permanent water diversion for Class I and Class IV watercourses for prime contractors on CAL FIRE timber harvesting projects. Installs cofferdams, diversion pipes, and silt curtains to manage water flow and implement sediment control in sensitive and non-fish bearing streams. Requires water pumps and sandbags. Complies with CDFW mitigation measures and Public Resources Code §21108. Delivers diverted watercourses for project execution.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole St. Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and restoration of an existing boat ramp facility that has suffered typical degradation. Key activities include the removal of the existing structure, dredging and grading of native soils, placement of gravel fill, and the final design and installation of new concrete boat ramps. The finished facility must feature four launching bays providing eight total ramps, with two outer ramps measuring approximately 56 feet and six interior ramps measuring approximately 46 feet from mean high water to the toe. The completed ramps must be capable of supporting vessels exceeding 35 feet with combined weights over 10 tons. Additional requirements include the temporary relocation and preservation of floating docks and gangways to ensure ADA-compliant travel. The project is categorized as marine construction with an estimated value of 750,000 dollars. Bidders must provide a bid security equal to 10 percent of their maximum bid price and furnish payment and performance bonds within ten days of a contract award. The period of performance is 180 calendar days from the Notice to Proceed. Contractors must choose between two construction sequencing options: Alternate A, which utilizes a phased closure to minimize public disruption, or Alternate B, which allows for a maximum 45-day simultaneous closure of all ramps. Technical specifications require concrete with a compressive strength of 4,000 PSI and a minimum design load of 300 PSF. Environmental compliance is mandatory, requiring the implementation of Stormwater Pollution Prevention Plans and the use of turbidity curtains.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS