Clean Water Program

Forecast
EPIMS-SMO-43302State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has amended Lake and Streambed Alteration Agreement EPIMS-SMO-43302-R3 for the Arroyo Lift Station Rehabilitation Project, managed by the City of San Mateo and represented by Sven Edlund. This amendment, issued pursuant to Section 1602 of the Fish and Game Code, updates the project impacts to include the removal of two additional riparian trees and the trimming of three others. Furthermore, the project will now permanently impact an additional 260 square feet above the top-of-bank and temporarily impact an additional 318 square feet. To mitigate these expanded impacts, an updated Revegetation Plan requires the restoration of 1,184 square feet of riparian area using native species, specifically nine trees and nine shrubs, with a mandatory monitoring period of five years. A Notice of Determination confirms that these modifications will not have a significant effect on the environment within the jurisdiction of the California Department of Fish and Wildlife.

General Info

CDFW amended San Mateo's project to include more tree removal and riparian restoration.

Place of Performance

San Mateo, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has amended Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-SMO-43302-R3, pursuant to Section 1602 of the Fish and Game Code to City of San Mateo as represented by Sven Edlund. The amendment to the Agreement includes updates to project impacts and an updated Revegetation Plan to mitigate additional project impacts. Specifically, two additional riparian trees will be removed, and the canopies of three additional riparian trees will be trimmed. An additional 260 square feet above top-of-bank will be permanently impacted, and an additional 318 square feet will be temporarily impacted. To mitigate these additional impacts, 1,184 square feet of riparian area will be revegetated with native riparian species, including nine trees and nine shrubs, and be monitored for a five-year period.

Similar Contracts

Same NAICS industry code

More opportunities from California → City of San Mateo

Same awarding agency

NAICS: 236220
SLED
922-980 S. Claremont Street Project
Solicitation # PA- 2024- 062
The 922-980 S. Claremont Street Project, identified by solicitation PA-2024-062, is a development initiative by the City of San Mateo to establish a self-storage facility on a 1.37-acre site. The project involves the rehabilitation of three existing single-story buildings totaling 25,186 square feet and the construction of a new two-story storage building of approximately 51,873 square feet, including a basement level. Together, these four buildings will provide 76,767 square feet of space comprising 591 storage units, 717 storage lockers, 118 wine storage units, and approximately 2,028 square feet of office space. Additional site improvements include a 20-space surface parking lot, landscaping, frontage improvements, and both on- and offsite utility connections. The project is subject to strict environmental and safety compliance, including the California Environmental Quality Act and a Mitigated Negative Declaration. Because the site is identified as a leaking underground storage cleanup site, the contract mandates a comprehensive Site Management Plan and a project-specific Health and Safety Plan. Key requirements include specialized OSHA training for personnel, baseline medical examinations, and rigorous soil characterization and approval processes for the disposal or reuse of impacted soil. Construction is anticipated to take approximately 1.5 years, with an estimated schedule running from April 2026 through December 2027. Technical analyses have confirmed that proposed wastewater flows are lower than existing levels, eliminating the need for sewer main improvements.
Commercial and Institutional Building Construction

POSTED

5 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS