Cliff Drive Resiliency Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Capitola is advancing the Cliff Drive Resiliency Project to combat severe coastal bluff erosion along an 800-foot stretch of Cliff Drive between Portola Drive and Wharf Road, where decades of erosion have threatened road integrity and public safety. Rising sea levels and more intense storms driven by climate change are accelerating the degradation, making this project critical to preserving a vital transportation corridor that carries nearly 8,000 vehicles daily and serves as the primary evacuation route for Capitola Village. The project will stabilize the bluff with a soil-nail-anchored shotcrete wall and install rock protection at its base, while upgrading the roadway to include two travel lanes, dedicated parking, and a protected bike lane. These improvements aim to enhance safety by addressing the current lack of sidewalks, which has led to dangerous interactions between pedestrians, cyclists, and motorists using the road to access ocean views. Beyond infrastructure, the project seeks long-term resilience against climate-driven coastal retreat, ensuring Cliff Drive remains functional and safe for generations. The roadway, classified as a minor arterial, supports not only local traffic but also significant foot and bicycle traffic, underscoring its role as both a transportation link and community amenity. The City of Capitola’s Public Works Department is leading the initiative, with Jessica Kahn, Public Works Director, as the primary point of contact, and Richard Grassetti of GECONs serving as principal advisor. The project is publicly forecasted with a posted date of July 24, 2026, and is expected to proceed under the regulatory framework for infrastructure projects in California, with performance occurring in Capitola under ZIP code 95010.

General Info

Capitola’s Cliff Drive project stabilizes erosion with a shotcrete wall and rock protection, adds lanes, bike lane, and parking, ensuring safety and climate resilience.

Agency

California → City of Capitola

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Cliff Drive between Portola Drive and Wharf Road, Capitola, CA, 95010

Set-Aside

NONE

Documents

(4)

Cliff Drive Resiliency Project Notice of Intent

PDFspecial-notice

Cliff Drive Resiliency Project Draft Initial Study/Mitigated Negative Declaration July 2026

PDFenvironmental-assessment

Cliff Drive Resiliency Project Summary Form

PDFenvironmental-summary

Cliff Drive Resiliency Project Notice of Completion

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Capitola
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Capitola
Office AddressN/A
Contacts
Jessica KahnPublic Works Director
Richard GrassettiPrincipal

Interested Companies (1)

Show more
Grassetti Environmental Consulting
Berkeley, CA

Full Description

Show more
The City of Capitola Public Works Department (City), is proposing a project to address coastal bluff erosion and associated undermining of the roadway along approximately 800 feet of Cliff Drive in Capitola. The proposed restoration project is intended to remediate current bluff erosion and provide resiliency for projected increased erosion associated with climate change/sea-level rise. Bluff erosion has threatened this route since the 1960s and is expected to worsen due to rising sea levels and more intense storms from climate change. The City of Capitola seeks a strategy to manage access along the portion Cliff Drive adjacent to the coastal bluff. In its current configuration Cliff Drive is a busy corridor serving walkers, bicyclists, motorists, and those parking to enjoy the stunning vistas of the Pacific Ocean. Due to the lack of sidewalks along Cliff Drive, conflicts between pedestrians and motorists are possible. The proposed project would include bluff stabilization via a soil-nail-anchored shotcrete wall, rock protection at the base of the bluff, and a resurfaced roadway with two travel lanes, parking and a bike lane. These improvements would be implemented along the nearly 800-foot stretch of Cliff Drive between Portola Drive and Wharf Road in Capitola. This roadway alignment is classified as a minor arterial roadway, and accommodates nearly 8,000 vehicles daily alongside hundreds of bicyclists and pedestrians. It also serves as the primary evacuation route for Capitola Village.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified Small Business Enterprises (SBE), Veteran-Owned Small Business Enterprises (VSBE), and Disadvantaged Business Enterprises (DBE) to serve as subcontractors, material contractors, and suppliers for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The extensive scope of work includes site preparation, asbestos abatement, tunneling, underground piping, asphalt and concrete paving, electrical systems, and general site support services. Bidders must provide evidence of certification through the Department of General Services and the Port of Long Beach PlanetBids portal, hold a valid California Contractor's license, and provide acceptable insurance. Subcontractors may be required to provide bonding for 100 percent of their contract value, with premiums reimbursed by Kiewit. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code, requiring firms to maintain labor harmony and adhere to collective bargaining agreements with various trade unions. Funding is provided through multiple grants, including the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD 2021 Port Infrastructure Development Program, which mandates compliance with DBE Program requirements. Interested firms must contact the lead estimator to receive an Invitation to Bid via the BuildingConnected system, with a final response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 237310
New
SLED
Unpaved Residential Roadways
Solicitation # 26-19878-AE
The City of Lubbock, Texas, is soliciting competitive sealed proposals under solicitation 26-19878-AE for the construction and improvement of unpaved residential roadways. The project has an estimated construction budget of 4,400,000.00 dollars and requires the contractor to provide all labor and materials necessary to complete the work. The selected contractor must ensure daily prosecution of work and substantially complete the project within 365 consecutive calendar days from the Notice to Proceed. A two-year written guarantee against defective materials and workmanship is required following final acceptance. The City will award the contract based on best value, utilizing a weighted evaluation system: price accounts for 60 points, contractor qualifications for 30 points, and construction time for 10 points. Qualification assessments include a review of the contractor's safety record, financial resources, and similar project experience over the last five years. Proposals are due by September 24, 2026. Mandatory requirements include a Contractor's Statement on Qualifications, a proposal security deposit of at least 5 percent of the total amount, and compliance with Texas Government Code Chapter 2258 regarding prevailing wage rates. Additionally, performance and payment bonds of 100 percent of the contract price are required for contracts exceeding specific thresholds, and all vendors must disclose potential conflicts of interest per Chapter 176 of the Texas Local Government Code.
CITY OF LUBBOCK

POSTED

2 days ago

DEADLINE

in 16 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS