Cliffside Salado Creek Greenway Access Nature Trail Project

Active
6ab2c56c971d3837336b19d9State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Shavano Park is seeking bids from qualified contractors to construct a 400 linear foot concrete nature trail connecting Cliffside Drive to the Salado Creek Greenway. The project requires the contractor to provide all labor, materials, equipment, and supervision to build a 6-foot wide, 4-inch thick concrete trail reinforced with #4 rebar and a 2-inch compacted base. Key technical requirements include a 12-foot total clearing width, the removal of boulders, and pruning overhanging branches to ensure an 8-foot clearance. The concrete must feature a light-brown natural color with a rock salt and broom finish to prevent slippage. Construction must adhere to the Forest Service Trail Accessibility Guidelines to balance accessibility with the preservation of the natural environment. Specific slope requirements include a maximum cross slope of 2 percent for paved surfaces and a general running slope limit of 12 percent, with no more than 30 percent of the trail exceeding an 8.3 percent grade. The City will evaluate bidders based on qualifications, technical adherence, and pricing. This tax-exempt project requires the new trail to be seamlessly integrated into existing concrete curbs and the Salado Creek Greenway.

General Info

City of Shavano Park seeks bids for a 400-foot concrete nature trail construction.

Place of Performance

Shavano Park, TX, 78231, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → City of Shavano Park, TX
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The City of Shavano Park is accepting bids from qualified contractors to provide to furnish all labor, materials, equipment, supervision, transportation, and incidentals necessary to construct a 400 linear foot concrete nature trail connecting Cliffside Drive to the Salado Creek Greenway. Plans and bid docs can be found on CivCast ( https://www.civcastusa.com/ ) or City website ( https://www.shavanopark.org/bids ). Project will be Tax Exempt. For this project the City will use Forest Service Trail Accessibility Guidelines (FSTAG). FSTAG provides guidance for maximizing the accessibility of trails while protecting the unique characteristics of the natural setting. Although the guidelines are not legally enforceable outside of the National Forest System, they may be used by other entities to define best practices for recreation areas. See Scope of Services II for FSTAG guidelines for this project. The City of Shavano Park will consider the firm qualification, adherence to the technical requirements and proposal pricing of bidders in making the award. City of Shavano Park reserves the right to reject any and all bids, to waive informalities and technicalities, to reject portions of the bids and to award contracts in a manner consistent with the City and laws governing the State of Texas. SCOPE OF SERVICES REQUIRED The selected contractor shall provide all labor, materials, equipment, supervision, and incidentals necessary to complete the following improvements: Concrete Nature Trail Construct approximately 400 linear feet of concrete trail, trail width shall be 6 feet, see trail map and specifications in Exhibit A. 4-inch-thick concrete with #4 Rebar reinforcement and 2-inch minimum compacted base with 6”x8” turndown beam at edge of sidewalk and strengthened expansion joints – see all details for concrete construction in Exhibit A. Perform all clearing, grading, excavation, and restoration – 3 feet clearing on both side of the concrete trail (12-foot clearing width in total). Install compacted base material and concrete in accordance with specifications in Exhibit A For this project the City will use Forest Service Trail Accessibility Guidelines (FSTAG). FSTAG provides guidance for maximizing the accessibility of trails while protecting the unique characteristics of the natural setting. The following FSTAG guidelines will be used for this project for grades and slopes: Trail running slope (grade) of up to 1:20 (5%) is allowed for any distance. Trail running slope (grade) of up to 1:12 (8.3%) is allowed for any distance less than 200 feet. Trail running slope (grade) of any distance shall not be steeper than 1:8 (12%). No more than 30% of the total trail length may exceed a running slope (grade) of 1:12 (8.3%) The cross slope shall not exceed 1:20 (5 percent). Where the surface is paved or is elevated above the natural ground, the cross slope shall not be steeper than 1:48 (2 percent). Tie concrete trail into existing Cliffside Trail concrete curb and existing City of San Antonio Salado Creek Greenway without damaging either existing concrete work. Final alignment to be coordinated with awarded contractor, prior to construction, to limit removal of existing trees. All large rocks/boulders within construction zone to be removed and can be saved on site. Any existing tree branches overhanging proposed trail to be pruned to allow for a minimum of 8'-0" clearance. Reference tree pruning detail in Exhibit A. City will mulch tree cuttings. Provide integral light-brown natural looking concrete coloring – see Exhibit A for a rendering. Provide rock salt finish and broom finish final surface texturing of the concrete to reduce slippage risk.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Salem Township OPWC Emergency Culvert Repair
Solicitation # 49254
The Salem Township OPWC Emergency Culvert Repair project, administered by the Washington County Engineer, involves the emergency repair of a culvert washout on T-16 Duck Creek Road. The scope of work requires the removal of existing pipes and concrete headwalls and the installation of a pre-cast concrete 4-sided box culvert, specifically a 6' x 8' conduit Type A section with wingwalls. All work must adhere to the 2023 ODOT Construction and Materials Specifications and the Ohio Manual of Uniform Traffic Control Devices for road closure and traffic coordination. The project has an engineer's estimate of $85,048, and the contract will be awarded to the lowest responsive and responsible bidder, provided the bid does not exceed the estimate by more than 10 percent. The required completion date for all work is December 1, 2026, with liquidated damages set at $200 per day. Compliance requirements are stringent, mandating adherence to OPWC Proposal Notes, Ohio prevailing wage laws, and Buy America requirements for steel and iron. Contractors must provide a bid guaranty, maintain Ohio workers' compensation coverage, and be enrolled in the OBWC Drug-Free Workplace Program. Additional mandates include the use of Ohio-sourced products and labor where practicable and the submission of certified payrolls. Bidders must submit a comprehensive proposal binder including various affidavits, certifications against debarment, and performance bonds. Pre-construction deliverables include a detailed construction schedule, a subcontractor list, and estimated road closure durations.
Washington County, OH - Engineer

POSTED

1 day ago

DEADLINE

in 16 days
View Details
NAICS: 237310
New
SLED
Sidewalk Repair for the Recreation Department & Senior Center Building
Solicitation # 39192
The Town of Plainfield is soliciting proposals from licensed consultants for sidewalk repair and replacement services at the Recreation Department and Senior Center Building located at 482 Norwich Road, Plainfield, CT. The primary objective of the project is to resolve frost heave issues affecting the automatic ADA doors by removing the existing concrete walkway and base material and replacing them with more suitable materials as specified in the construction plans. The contract will be awarded on a lump sum basis to the lowest responsive bidder whose proposal is deemed to be in the best interest of the Town. Sealed bids must be submitted to the Finance Office at Plainfield Town Hall by 11:00 AM on Tuesday, October 20, 2026. Qualified bidders must be Equal Opportunity Employers in good standing with the Connecticut Secretary of State and cannot have delinquent taxes owed to the Town. The contract is subject to state compliance requirements, including a 25% set-aside for DAS-certified Small Businesses and a 6.25% set-aside for Minority, Women, and/or Disabled-owned Businesses. Awarded contractors must provide comprehensive insurance coverage, including a minimum of 1,000,000 dollars in commercial auto coverage and potential umbrella liability, while naming the Town of Plainfield as an additional insured. Technical proposals must include a letter of transmittal, a detailed approach to the scope of work, proof of insurance, a corporate resolution, and a completed bid form.
DAS Procurement

POSTED

1 day ago

DEADLINE

in 23 days
View Details
NAICS: 237310
New
SLED
Roadway Culvert Lining IDIQ
Solicitation # 2201030
Hennepin County, Minnesota, is soliciting bids for Project CP 2201030, a Roadway Culvert Lining Indefinite Delivery/Indefinite Quantity (IDIQ) contract. The scope of work involves the installation of Cured-In-Place-Pipe Lining (CIPP) using the Ultraviolet Light (UV) process, specifically prohibiting steam or heat cured CIPP. The project covers improvements to County State Aid Highways 11, 19, and 125, as well as County Road 116, spanning the cities of Corcoran, Independence, Loretto, Mound, Rogers, and Tonka Bay. Additional deliverables include traffic control, joint repair, culvert cleaning and removal, and erosion control. All work must adhere to the 2025 MnDOT Standard Specifications for Construction and project-specific plans. The contract has a maximum term of three years with a total compensation value between 150,000 and 2,000,000 USD, with each individual task order required to be at least 75,000 USD. Award will be granted to the lowest responsible bidder who complies with all proposal requirements, including a 2 percent goal for Small Business Enterprise (SBE) and Small Women-Owned Business Enterprise (SWBE) participation. Bidders must submit electronic proposals via ProcureWare by 2:00 p.m. on October 20, 2026. Required submissions include a proposal form, non-collusion declaration, and responsible contractor verification. Performance and payment bonds are required, and Minnesota prevailing wage statutes apply to all work performed.
Hennepin County

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS